July 8, 2002 LICENSEE:
Pacific Gas and Electric Company FACILITY:
Diablo Canyon Nuclear Power Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF MAY 10, 2002, MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY (PG&E) ON THEIR PROPOSED 10 CFR PART 50 LICENSE AMENDMENT APPLICATION FOR THE INDEPENDENT SPENT FUEL STORAGE INSTALLATION FOR DIABLO CANYON NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 On May 10, 2002, the NRC staff met with PG&E to discuss their proposed 10 CFR Part 50 license amendment application for the independent spent fuel storage installation (ISFSI) for Diablo Canyon Nuclear Power Plant, Unit Nos. 1 and 2, which was submitted to the NRC on April 15, 2002. The 10 CFR Part 50 application is a complementary application to PG&Es 10 CFR Part 72 license application for the ISFSI that was submitted to the NRC on December 21, 2001.
The meeting began with PG&E providing the staff with an update of their ISFSI project status.
This was followed by a presentation of PG&Es proposed 10 CFR Part 50 license amendment application for an ISFSI, its purpose, and its relationship with the 10 CFR Part 72 license application. The 10 CFR Part 50 application is related to the loading and handling of the spent fuel cask inside and outside of the fuel handling and auxiliary building. This application is based on changes required for implementation of the NUREG-0612 control of heavy loads program to implement the ISFSI, elimination of the spent fuel cask exclusion zone, and recommendations discussed in NRC Bulletin 96-02, "Movement of Heavy Loads Over Spent Fuel, Over Fuel in the Reactor Core, or Over Safety-Related Equipment."
PG&E provided details of the heavy load design and drop effect on structures, systems, and components, crane modifications and analysis, cask seismic restrain design and analysis, and affects on facility during transport and cask handling. PG&E also discussed the seismic design, structural design, thermal design, drops and tipovers, operational errors, system malfunctions, tornado missiles, and fires.
PG&E further discussed their approach for meeting regulatory requirements for their application, and their criticality monitoring exemption request. PG&E also responded to several questions from the staff on their application.
At the conclusion of the meeting, the staff expressed their appreciation to PG&E for the presentation.
A list of those attending the meeting is provided in the enclosure. Copies of the slides used during the meeting are available under ADAMS accession number ML021330144.
Girija S. Shukla, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323
Enclosure:
Meeting Attendees cc w/encl: See next page A list of those attending the meeting is provided in the enclosure. Copies of the slides used during the meeting are available under ADAMS accession number ML021330144.
Girija S. Shukla, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323
Enclosure:
Meeting Attendees cc w/encl: See next page DISTRIBUTION:
PUBLIC PDIV-2 R/F RidsNrrDlpm (JZwolinski/TMarsh)
RidsNrrDlpmPdiv (WRuland)
RidsNrrPMGShukla RidsNrrLAEPeyton RidsAcrsAcnwMailCenter RidsOgcRp RHall GHatchett SLewis NBreland JCuadrado DMcCain SMorris RidsRgn4MailCenter (KBrockman)
Meeting Notice: ML021140257 PKG.: ML021710025 ACCESSION NO:ML021710018 OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC NAME GShukla EPeyton SDembek DATE OFFICIAL RECORD COPY
Diablo Canyon Power Plant, Units 1 and 2 cc:
NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P.O. Box 369 Avila Beach, CA 93424 Dr. Richard Ferguson, Energy Chair Sierra Club California 1100 11th Street, Suite 311 Sacramento, CA 95814 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, CA 93408 Mr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, CA 94102 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O. Box 942732 Sacramento, CA 94327-7320 Diablo Canyon Independent Safety Committee ATTN: Robert R. Wellington, Esq.
Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Christopher J. Warner, Esq.
Pacific Gas & Electric Company Post Office Box 7442 San Francisco, CA 94120 Mr. David H. Oatley, Vice President Diablo Canyon Operations Diablo Canyon Nuclear Power Plant P.O. Box 3 Avila Beach, CA 93424 Telegram-Tribune ATTN: Managing Editor 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, CA 93406 Mr. Ed Bailey, Radiation Program Director Radiologic Health Branch State Department of Health Services P.O. Box 942732 (MS 178)
Sacramento, CA 94327-7320 Mr. Robert A. Laurie, Commissioner California Energy Commission 1516 Ninth Street (MS 31)
Sacramento, CA 95814 Mr. Gregory M. Rueger Senior Vice President, Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Nuclear Power Plant P. O. Box 3 Avila Beach, CA 94177
Enclosure ATTENDANCE LIST MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY (PG&E)
ON PROPOSED 10 CFR PART 50 LICENSE AMENDMENT APPLICATION FOR INDEPENDENT SPENT FUEL STORAGE INSTALLATION MAY 10, 2002 PG&E Terry Grebel Richard Hagler Richard Klimczak L. J. Strickland NRC Girija Shukla Steve Dembek Randy Hall Greg Hatchett Steve Lewis Nicole Breland Jose Cuadrado Member of Public James Clark - JR Clark Associates, Inc.