MONTHYEARNRC 2023-0013, Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-07-0707 July 2023 Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter NRC 2023-0005, Report of Changes to Emergency Plan2023-02-21021 February 2023 Report of Changes to Emergency Plan NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan2022-09-30030 September 2022 Sixth 10-Year Interval Inservice Testing (1ST) Program Plan NRC 2022-0025, License Amendment Request 295, Beacon Power Distribution Monitoring System2022-09-26026 September 2022 License Amendment Request 295, Beacon Power Distribution Monitoring System NRC 2022-0019, Report of Changes to Emergency Plan2022-07-13013 July 2022 Report of Changes to Emergency Plan NRC 2022-0022, Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2,2022-07-11011 July 2022 Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, NRC 2022-0015, Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report2022-04-27027 April 2022 Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report NRC 2022-0014, 2021 Annual Monitoring Report2022-04-14014 April 2022 2021 Annual Monitoring Report NRC 2021-0012, Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41)2022-04-0707 April 2022 Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41) NRC 2022-0003, License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process2022-03-25025 March 2022 License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process NRC 2022-0006, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2022-02-22022 February 2022 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections NRC 2022-0004, Report of Changes to Emergency Plan2022-02-0909 February 2022 Report of Changes to Emergency Plan NRC 2022-0005, Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2022-02-0101 February 2022 Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2022-0001, Report of Changes to Emergency Plan2022-01-11011 January 2022 Report of Changes to Emergency Plan NRC 2021-0046, Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40)2021-10-28028 October 2021 Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40) NRC 2021-0031, Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-0562021-07-15015 July 2021 Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-056 NRC 2021-0027, Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-0532021-06-30030 June 2021 Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-053 NRC 2021-0028, Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism2021-06-23023 June 2021 Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism NRC 2021-0021, 2020 Annual Monitoring Report2021-04-29029 April 2021 2020 Annual Monitoring Report NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations NRC-2021-0010, CFR 50.59 Evaluation and Commitment Change Summary Report2021-04-0202 April 2021 CFR 50.59 Evaluation and Commitment Change Summary Report NRC-2021-0011, Technical Specification Bases and Technical Requirement Manual Change Summary2021-04-0202 April 2021 Technical Specification Bases and Technical Requirement Manual Change Summary NRC 2021-0006, Report of Changes to Emergency Plan2021-03-18018 March 2021 Report of Changes to Emergency Plan NRC 2021-0005, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-022021-02-11011 February 2021 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-02 NRC 2021-0002, Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2021-01-21021 January 2021 Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report NRC 2021-0001, Report of Changes to Emergency Plan2021-01-13013 January 2021 Report of Changes to Emergency Plan NRC 2020-0044, Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise2020-12-0808 December 2020 Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise NRC 2020-0032, Application for Subsequent Renewed Facility Operating Licenses2020-11-16016 November 2020 Application for Subsequent Renewed Facility Operating Licenses NRC 2020-0039, Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40)2020-11-0202 November 2020 Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40) NRC 2020-0031, NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-0812020-10-0505 October 2020 NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-081 NRC 2020-0029, Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-09-15015 September 2020 Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0024, Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements2020-08-17017 August 2020 Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements NRC 2020-0020, License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-08-13013 August 2020 License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0023, NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-08-12012 August 2020 NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations NRC 2020-0021, Response to NRC Inspection Report and Preliminary White Finding2020-08-12012 August 2020 Response to NRC Inspection Report and Preliminary White Finding NRC 2020-0018, Report of Changes to Emergency Plan2020-07-15015 July 2020 Report of Changes to Emergency Plan NRC-2020-0016, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-12012 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic NRC 2020-0012, Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2020-05-20020 May 2020 Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2020-0008, Report of Changes to Emergency Plan2020-04-0606 April 2020 Report of Changes to Emergency Plan NRC 2020-0007, Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38)2020-03-27027 March 2020 Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38) NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis2020-02-0606 February 2020 License Amendment Request 289: Tornado Missile Protection Licensing Basis NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0044, Report of Changes to Emergency Plan2019-11-0101 November 2019 Report of Changes to Emergency Plan NRC 2019-0036, Submittal of 2018 Update to Final Safety Analysis Report2019-10-18018 October 2019 Submittal of 2018 Update to Final Safety Analysis Report NRC 2019-0037, Technical Specification Bases Change Summary2019-10-18018 October 2019 Technical Specification Bases Change Summary NRC 2019-0034, Technical Requirements Manual Change Summary2019-10-18018 October 2019 Technical Requirements Manual Change Summary NRC 2019-0032, CFR 50.59 Evaluation and Commitment Change Summary Report2019-10-18018 October 2019 CFR 50.59 Evaluation and Commitment Change Summary Report NRC 2019-0042, NextEra Energy Point Beach, LLC, Relief Request 1-RR-13 and 2-RR-13, Response to Request for Additional Information2019-10-17017 October 2019 NextEra Energy Point Beach, LLC, Relief Request 1-RR-13 and 2-RR-13, Response to Request for Additional Information 2023-07-07
[Table view] Category:License-Monthly Operating Report
MONTHYEARNRC 2005-0080, February 2005 Monthly Operating Report for Point Beach Nuclear Plant, Unit 1 & 22005-08-19019 August 2005 February 2005 Monthly Operating Report for Point Beach Nuclear Plant, Unit 1 & 2 NRC 2005-0034, February 2005 Monthly Operating Report for Point Beach Units 1 & 22005-03-14014 March 2005 February 2005 Monthly Operating Report for Point Beach Units 1 & 2 NRC 2005-0025, January 2005 Monthly Operating Report for Point Beach Nuclear Plant, Units I and 22005-02-10010 February 2005 January 2005 Monthly Operating Report for Point Beach Nuclear Plant, Units I and 2 NRC 2005-0011, December 2004 Monthly Operating Report for Point Beach, Units 1 & 22005-01-13013 January 2005 December 2004 Monthly Operating Report for Point Beach, Units 1 & 2 NRC 2004-0136, November 2004 Monthly Operating Report for Point Beach Nuclear Plant, Units 1 and 22004-12-13013 December 2004 November 2004 Monthly Operating Report for Point Beach Nuclear Plant, Units 1 and 2 NRC 2004-0118, October 2004 Monthly Operating Report for Point Beach, Units 1 and 22004-11-0808 November 2004 October 2004 Monthly Operating Report for Point Beach, Units 1 and 2 NRC 2004-0105, September 2004 Monthly Operating Report for Point Beach Units 1 and 22004-10-12012 October 2004 September 2004 Monthly Operating Report for Point Beach Units 1 and 2 NRC 2004-0095, August 2004 Monthly Operating Report for Point Beach Nuclear Plant Units 1 and 22004-09-15015 September 2004 August 2004 Monthly Operating Report for Point Beach Nuclear Plant Units 1 and 2 NRC 2004-0080, July 2004 Monthly Operating Report for Point Beach Units 1 and 22004-08-12012 August 2004 July 2004 Monthly Operating Report for Point Beach Units 1 and 2 NRC 2004-0074, June 2004 Monthly Operating Report for Point Beach Nuclear Plant, Units 1 & 22004-07-14014 July 2004 June 2004 Monthly Operating Report for Point Beach Nuclear Plant, Units 1 & 2 NRC 2004-0061, April 2004 Revised Monthly Operating Report for Point Beach, Units 1 and 22004-06-0404 June 2004 April 2004 Revised Monthly Operating Report for Point Beach, Units 1 and 2 NRC 2004-0049, April 2004 Monthly Operating Report Regarding Point Beach Nuclear Plant Units 1 and 22004-05-11011 May 2004 April 2004 Monthly Operating Report Regarding Point Beach Nuclear Plant Units 1 and 2 NRC 2004-0037, March 2004 Monthly Operating Report for Point Beach Units 1 & 22004-04-12012 April 2004 March 2004 Monthly Operating Report for Point Beach Units 1 & 2 NRC 2004-0027, February 2004 Monthly Operating for Point Beach Units 1 and 22004-03-12012 March 2004 February 2004 Monthly Operating for Point Beach Units 1 and 2 NRC 2004-0018, January 2004 Monthly Operating Report for Point Beach, Units 1 and 22004-02-12012 February 2004 January 2004 Monthly Operating Report for Point Beach, Units 1 and 2 NRC 2004-0003, December 2003 Monthly Operating Report for Point Beach, Units 1 and 22004-01-12012 January 2004 December 2003 Monthly Operating Report for Point Beach, Units 1 and 2 NRC 2003-0117, November 2003 Monthly Operating Report for Point Beach, Units 1 and 22003-12-11011 December 2003 November 2003 Monthly Operating Report for Point Beach, Units 1 and 2 NRC 2003-0109, September 2003 Monthly Operating Report for Point Beach Nuclear Plant2003-11-11011 November 2003 September 2003 Monthly Operating Report for Point Beach Nuclear Plant NRC 2003-0093, September 2003 Monthly Operating Report for Point Beach2003-10-13013 October 2003 September 2003 Monthly Operating Report for Point Beach NRC 2003-0082, August 2003 Monthly Operating Report for Point Beach Units 1 and 22003-09-11011 September 2003 August 2003 Monthly Operating Report for Point Beach Units 1 and 2 NRC 2003-0061, June 2003 Monthly Operating Report for Point Beach Units 1 & 22003-07-11011 July 2003 June 2003 Monthly Operating Report for Point Beach Units 1 & 2 NRC 2003-0054, May 2003 Monthly Operating Report for Point Beach Units 1 and 22003-06-0909 June 2003 May 2003 Monthly Operating Report for Point Beach Units 1 and 2 NRC 2003-0041, April 2003 Monthly Operating Report for Point Beach Units 1 & 22003-05-12012 May 2003 April 2003 Monthly Operating Report for Point Beach Units 1 & 2 NRC 2003-0032, March 2003 Monthly Operating Report for Point Beach, Units 1 & 22003-04-0707 April 2003 March 2003 Monthly Operating Report for Point Beach, Units 1 & 2 NRC 2003-0022, February 2003 Monthly Operating Report for Point Beach, Units 1 and 22003-03-0606 March 2003 February 2003 Monthly Operating Report for Point Beach, Units 1 and 2 NRC 2003-0013, January 2003 Monthly Operating Report for Point Beach Nuclear Plant, Units 1 & 22003-02-11011 February 2003 January 2003 Monthly Operating Report for Point Beach Nuclear Plant, Units 1 & 2 NRC 2003-0003, December 2002 Monthly Operating Report for Point Beach Nuclear Plant, Units 1 & 22003-01-0606 January 2003 December 2002 Monthly Operating Report for Point Beach Nuclear Plant, Units 1 & 2 NRC 2002-0106, November 2002 Monthly Operating Report for Point Beach Nuclear Plant, Units 1 & 22002-12-10010 December 2002 November 2002 Monthly Operating Report for Point Beach Nuclear Plant, Units 1 & 2 NRC 2002-0100, October 2002 Monthly Operating Report for Point Beach Units 1 & 22002-11-15015 November 2002 October 2002 Monthly Operating Report for Point Beach Units 1 & 2 NRC 2002-0088, September 2002 Monthly Operating Report for Point Beach Units 1 & 22002-10-0202 October 2002 September 2002 Monthly Operating Report for Point Beach Units 1 & 2 NRC 2002-0078, August 2002 Monthly Operating Report for Point Beach Units 1 & 22002-09-0909 September 2002 August 2002 Monthly Operating Report for Point Beach Units 1 & 2 NRC 2002-0066, July 2002 Monthly Operating Report for Point Beach Units 1 & 22002-08-12012 August 2002 July 2002 Monthly Operating Report for Point Beach Units 1 & 2 NRC 2002-0058, June 2002 Monthly Operating Report for Point Beach Units 1 & 22002-07-0909 July 2002 June 2002 Monthly Operating Report for Point Beach Units 1 & 2 NRC 2002-0049, May 2002 Monthly Operating Report for Point Beach Units 1 & 22002-06-0505 June 2002 May 2002 Monthly Operating Report for Point Beach Units 1 & 2 NRC 2002-0034, April 2002 Monthly Operating Report for Point Beach, Units 1 & 22002-05-0303 May 2002 April 2002 Monthly Operating Report for Point Beach, Units 1 & 2 NRC 2002-0025, March 2002 Monthly Operating Report for Point Beach Nuclear Plant Units 1 & 22002-04-15015 April 2002 March 2002 Monthly Operating Report for Point Beach Nuclear Plant Units 1 & 2 NRC 2002-0021, February 2002 Monthly Operating Report for Point Beach, Units 1 & 22002-03-15015 March 2002 February 2002 Monthly Operating Report for Point Beach, Units 1 & 2 NRC 2002-0014, January 2002 Monthly Operating Report for Point Beach, Units 1 & 22002-02-15015 February 2002 January 2002 Monthly Operating Report for Point Beach, Units 1 & 2 NRC 2002-0003, December 2001 Monthly Operating Report for Point Beach Nuclear Plant Unit 1 and 22002-01-0707 January 2002 December 2001 Monthly Operating Report for Point Beach Nuclear Plant Unit 1 and 2 2005-08-19
[Table view] |
Text
Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, WI 54216-9511 Two Rivers, WI 54241 920.388.2560 920.755.2321 NMexc Committed to NuclearExcellence Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC 2002-0049 GL 97-02 June 05, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:
Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units 1 And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of May 2002.
Sincerely, T.J. W Regulatory Affairs Manager KML Attachment cc: J. D. Loock, PSCW NRC Region mll NRC Senior Resident Inspector NRC Project Manager
ýý4
Docket 50-266 and 50-301 NRC-2002-0049 ATTACHMENT 1 Letter from Thomas J. Webb (NMC)
To Document Control Desk (NRC)
Dated June 05, 2002 Re: Monthly Operating Report - May 2002
OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 06/04/02 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD May - 2002
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 515.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 510.0 MONTH YEAR TO DATE CUMULATIVE 744.0 3,623.0 227,232.8
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 3,623.0 223,717.0 0.0 0.0 846.9
- 5. UNIT RESERVER SHUTDOWN HOURS
- 6. NET ELECTRICAL ENERGY (MWH) 376,086.5 1,827,358.0 103,402,878.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 DATE: 06/04/02 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: May 2002 (Month/Year)
NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)
G. Operational Error (Explain) H .Other (Explain)
SUMMARY
Unit 1 average daily power for the month of May was 505.5 MWe.
There were no Licensee Event Reports (LERs) submitted to the NRC.
There were no Significant Operating Events.
UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 06/04/02 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: May 2002 (Month/Year)
NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS 3 04/12/02 S 318.1 C 1 This shutdown is carried over from April.
318.1 are the shutdown hours for May.
(1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)
G .Operational Error (Explain) H .Other (Explain)
SUMMARY
Unit 2 average daily power for the month of May was 266.4 MWe.
There were no Licensee Event Reports (LERs) submitted to the NRC.
There were no Significant Operating Events.
OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 06/04/02 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD May - 2002
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 515.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 512.0 MONTH YEAR TO DATE CUMULATIVE
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL 451.3 2,837.2 220,618.8
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 425.9 2,798.6 217,652.8
- 5. UNIT RESERVER SHUTDOWN HOURS 0.0 0.0 302.2
- 6. NET ELECTRICAL ENERGY (MWH) 198,169.5 1,381,571.0 102,165,078.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
Text
Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, WI 54216-9511 Two Rivers, WI 54241 920.388.2560 920.755.2321 NMexc Committed to NuclearExcellence Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC 2002-0049 GL 97-02 June 05, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:
Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units 1 And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of May 2002.
Sincerely, T.J. W Regulatory Affairs Manager KML Attachment cc: J. D. Loock, PSCW NRC Region mll NRC Senior Resident Inspector NRC Project Manager
ýý4
Docket 50-266 and 50-301 NRC-2002-0049 ATTACHMENT 1 Letter from Thomas J. Webb (NMC)
To Document Control Desk (NRC)
Dated June 05, 2002 Re: Monthly Operating Report - May 2002
OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 06/04/02 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD May - 2002
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 515.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 510.0 MONTH YEAR TO DATE CUMULATIVE 744.0 3,623.0 227,232.8
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 3,623.0 223,717.0 0.0 0.0 846.9
- 5. UNIT RESERVER SHUTDOWN HOURS
- 6. NET ELECTRICAL ENERGY (MWH) 376,086.5 1,827,358.0 103,402,878.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997
UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 DATE: 06/04/02 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: May 2002 (Month/Year)
NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)
G. Operational Error (Explain) H .Other (Explain)
SUMMARY
Unit 1 average daily power for the month of May was 505.5 MWe.
There were no Licensee Event Reports (LERs) submitted to the NRC.
There were no Significant Operating Events.
UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 06/04/02 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: May 2002 (Month/Year)
NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS 3 04/12/02 S 318.1 C 1 This shutdown is carried over from April.
318.1 are the shutdown hours for May.
(1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)
G .Operational Error (Explain) H .Other (Explain)
SUMMARY
Unit 2 average daily power for the month of May was 266.4 MWe.
There were no Licensee Event Reports (LERs) submitted to the NRC.
There were no Significant Operating Events.
OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 06/04/02 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD May - 2002
- 1. DESIGN ELECTRICAL RATING (MWE-NET) 515.0
- 2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 512.0 MONTH YEAR TO DATE CUMULATIVE
- 3. NUMBER OF HOURS REACTOR WAS CRITICAL 451.3 2,837.2 220,618.8
- 4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 425.9 2,798.6 217,652.8
- 5. UNIT RESERVER SHUTDOWN HOURS 0.0 0.0 302.2
- 6. NET ELECTRICAL ENERGY (MWH) 198,169.5 1,381,571.0 102,165,078.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997