ML021650306
| ML021650306 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 06/04/2002 |
| From: | Pennsylvania Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| EP-PS-116, Rev 13 | |
| Download: ML021650306 (11) | |
Text
Jun.
04, 2002 Page 1
of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2002-27/5 USER INFORMATION:
-FL=AIILAUREL D LMPL#:23244 CA#:
0386 AAtdrosnt NUCSA2 Phone#:
254-3658 TRANSMITTAL INFORMATION:
T-O-:---.
F i mm UR L-B 06/04/2002 LOCATION:
DOCUMENT CONTROL DESK FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER NUCSA-2)
"*-1THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
116 116 ADMINISTRATIVE (ADMIN)
COORDINATOR:
EMERGENCY PLAN-POSITION SPECIFIC PROCEDUE REMOVE MANUAL TABLE OF CONTENTS DATE:
03/17/2002 ADD MANUAL TABLE OF CONTENTS DATE:
06/03/2002 CATEGORY:
PROCEDURES TYPE:
EP ID:
EP-PS-116 ADD:
PCAF 2002-1389 REV:
N/A REMOVE:
PCAF 2002-1172 REV:
N/A REMOVE:
PCAF 2001-1025 REV:
N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5
DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY.
FOR ELECTRONIC MANUAL
- USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
PROCEDURE CHANGE PROCESS FORM
- 1. PCAF NO. 2002-1389 (2. PAGE 1 OF 10
- 3. PROC. NO.
EP-PS-116 REV. 13
- 4.
FORMS REVISED A R 12
-C._R_.
R R_,
R-,
R
- 5.
PROCEDURE TITLE TSC Administrative Coordinator: Emergency Plan Specific Instruction
- 6.
REQUESTED CHANGE PERIODIC REVIEW
] NO RI YES INCORPORATE PCAFS L] NO Z
YES
- 2002-1172
- 2001-1025 #
REVISION
[I PCAF [D DELETION rL
- 7.
SUMMARY
OF / REASON FOR CHANGE 1 - Page 2 revised to reflect alphabetic TABs revised in this PCAF and incorjptatiohn f previous PCAFs 2 -TAB A, Step 3 Assembly changed to Accountability to be conisisten, tte.," E*riegency Plan 3-TAB C - added direction on how to recall personnel evacuated form !*'*it*eduring an Emergency P activation - Previous PCAF 4 - TAB E - Instructions for accessing "INPO Resources Manual "ised post September 11 - Previous PCAF Ian Continued [-'
- 8.
DETERMINE COMMITTEE REVIEW REQUIREMENTS,,,
(Refer to Section 6.1.4)
PORC REVIEW REQ'D?
ZNO
'lYES PORC MTG#
NA BLOCKS 11 THRU 16 ARE ON PAGE OF FORM:
- 17.
Cynthia Smi I 254*3233 !!I i05/24/2002
- 18. COMMUNICATION OF CHANGE REQUIRED?
PREPRER ETN DATE NO Ln YES (TYPE)
(Print or Type)
- 19.
SIGNATURE ATTESTS THAT RESPONSIBLE SUPERVISOR HAS CONDUCTED QADR AND TECHNICAL REVIEW UNLESS OTHERWISE DOCUMENTED IN BLOCK 16 OR ATTACHED REVIEW FORMS.
RESPONSIB ISRDArE CROSS DISCIPLINE REVIEW (IF REQUIRED) HAS BEEN COMPLETED SR DBY SIGNATURE IN BLOCK 16 OR ATTACHED REVIEW FORMS.
- 20.
U 0
V0 U~
~
~
"AJ APRVAATP*
- 21.
RESPONSIBLE APPROVER INITIALS DATE ENTER N/A IF FUM HAS APPROVAL AUTHORITY I
FORM NDAP-QA-0002-8, Rev. 8, Page 1 of 2 (Electronic Form)
ONLY)
I I
ic
=!!i;;;q,;,!
I
PROCEDURE CHANGE PROCESS FORM
- 1. PCAF NO. 2002-1389
- 12. PAGE2OF 10
- 13. PROC. NO, EP-PS-116 REV. 13
- 11.
This question documents the outcome of the 50.59 and 72.48 Review required by NDAP-QA-0726. Either 11a, b, c or d must be checked "YES" and the appropriate form attached or referenced.
- a. This change is an Administrative Correction for which 50.59 and 72.48 are not YES N/A applicable.
4-4>-O
?5
- =.2
- b. This change is a change to any surveillance, maintenance or administrative YES
[
N/A procedure for which 50.59 and 72.48 are not applicable.
- c. This change is bounded by a 50.59/72.48 Screen/Evaluation, therefore, no new YES N/A 50.59/72.48 Evaluation is required.
Screen/Evaruation No.
- d.
50.59 and/or 72.48 are applicable to this change and a 50.59/72.48 YES
] N/A Screen/Evaluation is attached.
Z YES Change Request No.
NA
- 13. Should this change be reviewed for potential effects on Training Needs or Material?
YES Z
NO If YES, enter an Action Item @ NIMS/Action/Gen Work Mech/PICN
- 14. Is a Surveillance Procedure Review Checklist required per NDAP-QA-0722?
-- YES
[
NO
- 15. Is a Special, Infrequent or Complex Test/Evolution Analysis Form required per YES i
NO NDAP-QA-0320? (SICT/E form does not need to be attached.)
- 16. Reviews may be documented below or by attaching Document Review Forms NDAP-QA-0101-1.
REVIEWED BY WITH DATE REVIEW NO COMMENTS QADR TECHNICAL REVIEW REACTOR ENGINEERING/NUCLEAR FUELS IST **
OPERATIONS NUCLEAR SYSTEMS ENGINEERING NUCLEAR MODIFICATIONS MAINTENANCE HEALTH PHYSICS NUCLEAR TECHNOLOGY CHEMISTRY OTHER 50.54.Q
- e.
Required for changes that affect, or have potential for affecting core reactivity, nuclear fuel, core power level indication or-impact the thermal power heat balance. (58)
Required for changes to Section XI Inservice Test Acceptance Criteria.
FORM NDAP-QA-0002-8, Rev. 8, Page 2 of 2 (Electronic Form)
PCAFT#
2002-1389A PTagTj.-
f Pr EP-PS-116 Revision 13 Page 2 of 3 nergency Plan-Position Specific "ocedure WHEN:
Technical Support Center (TSC) is activated HOW NOTIFIED:
Pager/phone REPORT TO:
Emergency Director (ED)
WHERE TO REPORT:
TSC OVERALL DUTY:
Render level of support like normal -- staffing, clerical, document.
logistics, equipment, material, and safety, among others.
MAJOR TASKS:
TAB:
REVISION:
Make sure TSC is staffed and that staff accounted for. including cleri6al support.
Assist in positions for Duty" making sure all in the TSC meet requirements.
who fill the "Fitness See that shift turn over is managed smoothly.
Notify people when there is a fatality.
Make sure actions are taken to procure services, supplies, equipment, and additional personnel, as requested.
Upon termination of the emergency.
collect all documentation generated in the TSC from activation of the emergency plan.
TAB A TAB B TAB C TAB D TAB E TAB F Al 12--9 0
kAi 0
ADMINISTRATIVE (ADMIN I COORDTMATnP*
PCAF.# 2002-1389 PAGE 4.OF-10 TAB A EP-PS-116-A Revi si on-.I*/Z-1 Page 1 of 2 MAJOR TASK:
Make sure TSC is staffed and that staff is accounted for, including clerical support.
SPECIFIC TASKS:
HOW:
- 1.
Determine if all Technical Support Center (TSC) personnel have been contacted.
- 2.
Call out one additional Radiation Protection Coordinator to staff the position of HPN Communicator.
- 3.
Perform duties of Accountability Leader when Personnel Accountability is called.
- 4.
Inform ED of unfilled positions and estimated time these people will arrive at the TSC.
la.
Reference the "Telenotification System" printout obtained from the TSC Security Coordinator.
NOTE:
Failure of the paging system will require individual telephone calls to activate personnel in the "Nuclear Emergency Response Organization."
2a.
Use the Nuclear Department Personnel On Call.
NOTE:
Before calling in someone to perform HPN Communicator responsibilities, check with the RPC if they have any particular person they may want to fulfill this.position.
.3a.
If the accountability reader is inoperable:
(1)
Complete an Accountability Roster (2)
Give completed roster to the Security Coordinator.
3b.
Record Accountability in the Log.
4a.
Information available from Telenoti fication System printout.
jPc ft
PCAF # 2002-1389 PASL~FU.EE~L.0 TABA EP-PS -116-A Revision -It 1(2 Page 2 of 2 SPECIFIC TASKS:
ucll4 *
- 5.
Make sure clerical people have reported and are aware of their positions.
- 6.
Synchronize all clocks in the TSC to NBS (National Bureau of Standards) time.
- 7.
Distribute Coordinator Log Books.
- 8.
Activate TSC Moving Sign.
- 9.
Post TSC Staffing Board.
- 10.
Support emergency medical response search/rescue.
6a.
Get correct time from, the PICSY.
HELP TSC Moving Sign Instructions See TAB 7 lOa.
Reference 'SP-00-308, (Emergency Medical Response, Search/Rescue)
I
PCAF # 2002-1389 Page of _
TAB C EP-PS-116-C Revision OW Page I of 3 MAJOR TASK:
See that shift turn over is managed smoothly.
SPECIFIC TASKS:
HOW:
- 1.
Make sure initial and, if necessary, long-term manning schedules are developed and managed effectively.
la.
Meet with each Coordinator to develop the schedules for all emergency response functions.
NOTE:
Ensure Fitness For Duty (FFD) requirements are met.
lb.
To develop-the Initial Manning Schedule, follow these steps:
(1) Establish and maintain two extended shifts until it is decided to either:
(a)
Terminate the emergency.
(b)
Go to another manning scheme, like three shifts a day or rotating alternates into the extended shifts.
(2) The Primary and Relief Coordinators. (Contacts),
should man the two extended shifts.
(3)
Determine who should fill the staff positions if no Primary or Relief Contacts have been designated for these positions.
I pcA F'
TABC PCAF # 2002-1389 Page of lb TAEP-PSC 6-C Revisionek/I Page 2 of 3 SPECIFIC TASKS:
HOW:
(4)
Shifts can be manned by a mixture of Primary and Relief Contacts, depending on who is on call and who can be contacted.
(5)
If either the Primary or Relief contact is unavailable, make sure the Alternate Contact assumes one of the shift positions.
(6)
Initial manning may last from one day to several weeks, depending on the nature of the emergency.
(7)
Provide shift overlap for all Coordinators and their staffs.
1c.
To develop Long-term Manning Schedule, follow these steps:
(1) Establish a standard, three-shift rotation.
(a)
Make sure one team is always off duty.
(b)
See that the teams work three shifts over a twenty-four hour period.
(c)
Cycle Primary, Relief, or Alternate Contacts through the long-term manning schedule, as appropriate.
(d)
If necessary to insure smooth turn over, add time at the beginning and/or end of a shift.
(e)
You may have to vary specific start times, depending on circumstances.
HELP TSC Shift Schedule See TAB 6
PCAF#
2002-1389 Page of Z)
TAB C EP-PS-116-C Revision A6'W Page 3 of 3 SPECIFIC TASKS:
- 2.
When advised by ED, call in designated relief shift personnel.
- 3.
Make sure all relief personnel are briefed on current emergency status and existing or potential radiological hazards.
- 4.
Using manning schedules, call back-up personnel to replace absentees.
- 5.
If there are any schedule "changes, make sure the affected parties are notified.
- 6.
Brief your relieving counterpart, on the status of both the emergency and shift turn over.
2a.
Advise responsible relief personnel what routes to take to the plant.
2b. To recall personnel evacuated from the site:
- 1) Personnel evacuated to a common location, attempt to contact that location.
- 2) Nuclear Emergency Response Organization, (NERO), attempt to contact via assigned NERO pager or cellular telephone.
- 3) Use the "Plant Staff Employee Telephone List" to contact personnel at their place of residence.
- 4) Consider using outside agencies, (television, radio news media, Penna.
State Police, local law enforcement agencies), to assist In locating personnel and broadcasting recall messages:
3a.
Relay pertinent information.:
(1)
Concentrate on unsolved technical, radiological, communications, or administrative problems, as relevant.
(2)
Discuss in detail only that information that is directly related to their own function.
(3)
Review logbooks and status boards, as necessary.
6a.
Make sure your relieving counterpart is aware of:
(1)
All pertinent emergency information and data.
(2)
Initial and long-term manning schedules in the facility.
UWnu.
I Enf
"-o
PCAF It 92118 PAE I.F.4 EP-PS-116-E Revisi on -*+3
\\
Page I of 2 MAJOR TASK:
Make sure actions are taken to procure services, supplies, equipment.
and additional personnel, as requested.
SPECIFIC TASKS:
HOW:
- 1.
Make arrangements to feed site emergency personnel.
la.
Contact off-site possible.
vendors if
- 2.
Call out additional supplemental. support needed to mitigate the emergency.
- 3.
Provide logistical support, as needed.
NOTE: Emergency food rations are stored in the food locker, Lower Cable Spreading Room.
2a, Initiate via a telephone call or:
2b.
Request Security to page the individual if he/she is assigned a pager.
PCAF
°,2002-1389 OAF.
TAOF EP-PS-116-E Yý.qrjoz.
Revision -?-
Page 2 of 2;-j SPECTFT( TASI(S-
- 4.
When requested, provide information from the "INPO Emergency Resources Manual".
NOTE:
This manual provides member utility information and identifies technical
.expertise and specialized equipment that utilities and suppliers can provide in response to requests for emergency assistance.
To cesst IeNPO rgency Reso esMa al:
Op your.
er INPO Web itan click °t
\\~~s t "Re Frence Lib ry" on att
\\
~t~op o screen.* Scroll
- ~own t,the IN /IAcadem*
- ~cument's by sub ect
.*ti lon a selet "lrgecy repare aess"
~~Cl ic on the "ed cir rle adjac t to rgency
- Resourc1*
Manua i the table.
n 4a. To access the INPO Emerbency Resources Manual":
- 1) Go to the PPL WEBSITE
- 2) Click on Department Pages
- 3) Click on Susquehanna LIC
- 4) Click on INPO/WANO"
- 6) Click on INPO
- 6) Click on Emergency Preparedness
- 7) Click on "Emergency Resources Manual SP~r.IFC TAA;.
nuw:
n
1 U#'II_! _