FENOC Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, Ohio 43449-9760 FirstEnergy Nuclear Operating Company 419-321-8588 Howard W. Bergendahl 419-321-8588 Vice President - Nuclear Fax: 419-321-8337 Docket Number 50-346 License Number NPF-3 Serial Number 2789 June 10, 2002 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Withdrawal of Request for Approval of a Risk-Informed Inservice Testing Program for Air Operated Valves for the Third Ten-Year Interval (TAC Number MB0520)
Ladies and Gentlemen:
The purpose of this letter is to withdraw a previous request for approval of a Risk Informed Inservice Testing (RI-IST) Program for Air-Operated Valves (AOVs) for the Davis-Besse Nuclear Power Station (DBNPS) for the Third Ten-Year Interval. Approval to implement this program was previously requested by letter Serial Number 2668, dated September 11, 2000, and was supplemented by letters Serial Number 2720, dated July 17, 2001, and Serial Number 2733, dated September 13, 2001.
Draft Regulatory Guide DG-1089, "Operation and Maintenance Code Case Acceptability, ASME OM Code", was issued in December 2001 for comment. Upon approval of this Draft Regulatory Guide (which is anticipated to be during this year) and in conjunction with Regulatory Guide 1.175, "An Approach for Plant-Specific Risk Informed Decisionmaking: Inservice Testing" (August 1998), the development and implementation of a RI-IST for AOVs can be accomplished within existing NRC guidance and requirements, except where relief may be needed from those requirements.
In order to utilize of the forthcoming and existing guidance and requirements, and to eliminate unnecessary expenditure of NRC or DBNPS staff resources, the DBNPS withdraws its previous request for approval of a RI-IST for AOVs.
Docket Number 50-346 License Number NPF-3 Serial Number 2789 Page 2 of 2 If you have any questions or require further information, please contact Mr. Patrick J.
McCloskey, Manager-Regulatory Affairs, at (419) 321-7148.
Very truly yours, Attachment cc:
J. E. Dyer, Regional Administrator, Region III D. V. Pickett, NRC Project Manager S. P. Sands, NRC Backup Project Manager C. S. Thomas, DB-1 Senior Resident Inspector Utility Radiological Safety Board
Docket Number 50-346 License Number NPF-3 Serial Number 2789 Page 1 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station (DBNPS) in this document. Any other actions discussed in the submittal represent intended or planned actions by the DBNPS. They are described only for information and are not regulatory commitments. Please notify the Manager - Regulatory Affairs (419-321-7148) at the DBNPS of any questions regarding this document or associated regulatory commitments.
COMMITMENTS DUE DATE None