April 2002 Monthly Operating Report for Perry Unit 1
ML021580400
Person / Time
Site: Perry 
(NPF-058)
Issue date: 05/13/2002
From: David Gudger
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, PY-CEI/NRR-2640L
Download: ML021580400 (3)


Text

FENOC FirstEnergy Nuclear Operating company Perry Nuclear Power Plant 10 Center Road P.O. Box 97 Perry, Ohio 44081 May 13, 2002 PY-CEILNRR-2640L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the April 2002 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Dave Gudger for Gregory A. Dunn Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector

OPERATING DATA REPORT UNIT:

Perry DATE:

5/8/02 Docket: 50-440 Unit Name:

Perry Nuclear Power Plant Reporting Period: April 2002 Utility

Contact:

T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

1260*

1235"*

Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)

This Month 719.0 719.0 0.0 900.714.0 Yr-to-Date 2,879.0 2,879.0 0.0 3.557.392.0 Cumulative 99,464.2 96,592.0 0.0 110.157.794.0 The New Design Electrical Rating is based on the 105% uprate which was completed April of 2001.

The new MDC was effective April 1, 2001.

  • A new Design Electrical Rating is based on new net generation definitions
    • The new MDC is 1235 MWe Page 1
1.
2.
3.
4.
5.
6.

7.

8.
9.
10.

11.

S 0

S 0

UNIT SHUTDOWNS REPORT MONTH - APRIL 2002 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 05/08/02 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1

Hours 2

3

SUMMARY

The Perry Plant remained on line the entire month.
1. TYPE:

F: Forced S: Scheduled

2.

REASON:

A - Equipment Failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &

License Examination F - Administrative G - Operational Error (explain)

H - Other (explain)

3. METHOD:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2 q I