Text
FENOC FirstEnergy Nuclear Operating company Perry Nuclear Power Plant 10 Center Road P.O. Box 97 Perry, Ohio 44081 May 13, 2002 PY-CEILNRR-2640L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the April 2002 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Dave Gudger for Gregory A. Dunn Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector
OPERATING DATA REPORT UNIT:
Perry DATE:
5/8/02 Docket: 50-440 Unit Name:
Perry Nuclear Power Plant Reporting Period: April 2002 Utility
Contact:
T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):
Maximum Dependable Capacity (Net MWe):
1260*
1235"*
Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)
This Month 719.0 719.0 0.0 900.714.0 Yr-to-Date 2,879.0 2,879.0 0.0 3.557.392.0 Cumulative 99,464.2 96,592.0 0.0 110.157.794.0 The New Design Electrical Rating is based on the 105% uprate which was completed April of 2001.
The new MDC was effective April 1, 2001.
- A new Design Electrical Rating is based on new net generation definitions
- The new MDC is 1235 MWe Page 1
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
7.
- 8.
- 9.
- 10.
11.
S 0
S 0
UNIT SHUTDOWNS REPORT MONTH - APRIL 2002 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 05/08/02 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1
Hours 2
3
SUMMARY
- The Perry Plant remained on line the entire month.
- 1. TYPE:
F: Forced S: Scheduled
- 2.
REASON:
A - Equipment Failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &
License Examination F - Administrative G - Operational Error (explain)
H - Other (explain)
- 3. METHOD:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2 q I