ML021580258
| ML021580258 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 06/07/2002 |
| From: | Rinaldi F NRC/NRR/DLPM/LPD2 |
| To: | Beasley J Southern Nuclear Operating Co |
| Rinaldi F, NRR/LPD2-1, 415-1447 | |
| References | |
| TAC MB2329, TAC MB2330 | |
| Download: ML021580258 (4) | |
Text
June 7, 2002 Mr. J. B. Beasley, Jr.
Vice President Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 35201-1295
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 RE: ISSUANCE OF CORRECTED AMENDMENTS (TAC NOS. MB2329 AND MB2330)
Dear Mr. Beasley:
Following the issuance of Amendment No. 126 to Facility Operating License NPF-68 and Amendment No. 104 to Facility Operating License NPF-81 for the Vogtle Electric Generating Plant, Units 1 and 2, the NRC staff noted that the state consultation should read the Georgia State official instead of the State of Alabama on page 3 of the Safety Evaluation. The corrected page to the Safety Evaluation is enclosed. We regret any inconvenience this may have caused.
Sincerely,
/RA/
Frank Rinaldi, Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425
Enclosures:
Corrected Page 3 cc w/encls: See next page
June 7, 2002 Mr. J. B. Beasley, Jr.
Vice President Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 35201-1295
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 RE: ISSUANCE OF CORRECTED AMENDMENTS (TAC NOS. MB2329 AND MB2330)
Dear Mr. Beasley:
Following the issuance of Amendment No. 126 to Facility Operating License NPF-68 and Amendment No. 104 to Facility Operating License NPF-81 for the Vogtle Electric Generating Plant, Units 1 and 2, the NRC staff noted that the state consultation should read the Georgia State official instead of the State of Alabama on page 3 of the Safety Evaluation. The corrected page to the Safety Evaluation is enclosed. We regret any inconvenience this may have caused.
Sincerely,
/RA/
Frank Rinaldi, Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425
Enclosures:
Corrected Page 3 cc w/encls: See next page DISTRIBUTION:
PDII-1 R/F ACRS PUBLIC OGC CHawes GHill (4)
JNakoski SCahill, RII CPatel WBeckner HBerkow CHolden Accession Number: ML021580258 DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML021580258.wpd OFFICE PDII-1/PM PDII-1/LA PDII-1/SC NAME FRinaldi CHawes JNakoski DATE 05/14/02 05/14/02 5/14/02 OFFICIAL RECORD COPY Based on the above, the staff concludes that the licensees proposal to perform the endurance and margin test following DG inspection/maintenance at a 24-month interval is appropriate and acceptable. The operability of the DGs will continue to be demonstrated by all of the other SRs that are not affected by the proposed change. Endurance and margin capability of the DGs will continue to be demonstrated by SR 3.8.1.13. The only difference will be the increased surveillance interval, which has been shown to have a minimal impact on safety as demonstrated by the licensee in its analysis performed in accordance with GL 91-04.
3.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Georgia State official was notified of the proposed issuance of the amendments. The State official had no comments.
4.0 ENVIRONMENTAL CONSIDERATION
The amendments change the surveillance requirements. The NRC staff has determined that the amendments involve no significant increase in the amounts and no significant change in the types of any effluents that may be released offsite and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (66 FR 38767). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
5.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: O. Chopra Date: April 22, 2002
Vogtle Electric Generating Plant cc:
Mr. J. A. Bailey Manager, Licensing Southern Nuclear Operating Company, Inc.
P. O. Box 1295 Birmingham, Alabama 35201-1295 Mr. J. Gasser General Manager, Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc.
P. O. Box 1600 Waynesboro, Georgia 30830 Office of Planning and Budget Room 615B 270 Washington Street, SW.
Atlanta, Georgia 30334 Mr. J. D. Woodard Executive Vice President Southern Nuclear Operating Company, Inc.
P. O. Box 1295 Birmingham, Alabama 35201-1295 Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW.
Atlanta, Georgia 30328-4684 Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE. Suite 1252 Atlanta, Georgia 30334 Attorney General Law Department 132 Judicial Building Atlanta, Georgia 30334 Mr. J. D. Sharpe Resident Manager Oglethorpe Power Corporation Alvin W. Vogtle Nuclear Plant P. O. Box 1600 Waynesboro, Georgia 30830 Charles A. Patrizia, Esquire Paul, Hastings, Janofsky & Walker 10th Floor 1299 Pennsylvania Avenue Washington, DC 20004-9500 Arthur H. Domby, Esquire Troutman Sanders NationsBank Plaza 600 Peachtree Street, NE.
Suite 5200 Atlanta, Georgia 30308-2216 Resident Inspector Vogtle Plant 8805 River Road Waynesboro, Georgia 30830 Office of the County Commissioner Burke County Commission Waynesboro, Georgia 30830