Supplemental Response to Interim Safeguards and Security Compensatory Measures Order for R.E. Ginna Nuclear Power Plant
ML021570492
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/04/2002
From: Mecredy R
Rochester Gas & Electric Corp
To: Collins S
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML021570492 (3)


Text

f A Subsidiary of RGS Energy Group, Inc.

ROCHESTER GAS AND ELECTRIC CORPORATION - 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 - 585 546-2700 www.rge.com ROBERT C. MECREDY Vice President Nuclear Operations June 4, 2002 Mr. Samuel J. Collins Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

Supplemental Response to Interim Safeguards and Security Compensatory Measures Order R. E. Ginna Nuclear Power Plant Docket No. 50-244

References:

(1)

Letter from Robert C. Mecredy, RG&E, to Samuel J. Collins, NRC,

Subject:

Twenty Day Response to Interim Safeguards and Security Compensatory Measures Order, dated March 18, 2002.

(2)

Letter from Robert C. Mecredy, RG&E, to Samuel J. Collins, NRC,

Subject:

Request for Extension of Time to Submit an Answer or Request a Hearing, dated March 18, 2002.

(3)

Letter from John Zwolinski, NRC, to Robert C. Mecredy, RG&E,

Subject:

R.E. Ginna Nuclear Power Plant - Reply to Response to Order for Interim Safeguards and Security Compensatory Measures (TA C No. MB413 1),

dated May 22, 2002.

NOTICE: The enclosure to this letter contains "Safeguards Information" which should be prevented from public disclosure in accordance with 10CFR73.21. Upon separation of the enclosure, this letter is "DECONTROLLED."

Dear Mr. Collins:

In Reference (1), Rochester Gas and Electric Corporation (RG&E) responded to the U.S. Nuclear Regulatory Commission (NRC) Order which immediately modified the license for the R.E.

Ginna Nuclear Power Plant under the criteria of 10 CFR 2.202. For three Interim Compensatory Measures (ICM) called out in the Order (B.2.a.(1), B.2.a.(2), and B.2.b), RG&E stated that a supplemental response would be provided. The NRC accepted this response in Reference (3) provided that a supplemental response to the three ICMs was provided by June 4, 2002. The purpose of this letter is provide the required supplemental response (see enclosure).

1000482

Also, in Reference (2), RG&E reserved its right to request a hearing on these three ICMs. As described in the enclosure to this letter, RG&E will implement all ICMs by August 31, 2002.

Therefore, RG&E consents to the entry of the Order and does not require a hearing.

I declare under penalty of perjury under the laws of the United States of America that I am authorized by Rochester Gas and Electric to make this submittal and that the foregoing is true and correct.

Any questions should be directed to Mark Flaherty, Nuclear Safety and Licensing Manager at (585) 771-3275.

Very truly yours, Executed on June 4, 2002 Robert C. Mecredy MDF_255 Enclosure xc:

Mr. Samuel J. Collins (Room 5 D2, Mail Stop O-5E7)

Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S. Nuclear Regulatory Commission R.E. Ginna Nuclear Power Station Senior Resident Inspector Copy w/o enclosure:

Mr. Robert L. Clark (Mail Stop O-8C2)

Project Directorate I Division of Licensing Project Management Office of Nuclear Regulatory Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

Secretary, Office of the Secretary of the Commission U.S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, D.C. 20555-0001 Assistant General Counsel for Materials Litigation and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001