Bulletin 2002-01, Reactor Pressure Vessel Head Degradation 15-day Response
ML021570330
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 05/24/2002
From: Edison G, Stephen Monarque
NRC/NRR/DLPM/LPD2
To: Christian D
Virginia Electric & Power Co (VEPCO)
Monarque S, NRR/DLPM, 415-1544
References
BL-02-001, TAC MB4557, TAC MB4558, TAC MB4583, TAC MB4584
Download: ML021570330 (4)


Text

May 24, 2002 Mr. David A. Christian Senior Vice President - Nuclear Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Blvd.

Glen Allen, Virginia 23060-6711

SUBJECT:

BULLETIN 2002-01, REACTOR PRESSURE VESSEL HEAD DEGRADATION AND REACTOR COOLANT PRESSURE BOUNDARY INTEGRITY, 15-DAY RESPONSE FOR NORTH ANNA POWER STATION, UNITS 1 AND 2 AND SURRY POWER STATION, UNITS 1 AND 2 (TAC NOS. MB4557, MB4558, MB4583, AND MB4584)

Dear Mr. Christian:

On March 18, 2002, the staff issued Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, to the industry requesting that addressees provide information related to the structural integrity of the reactor coolant pressure boundary, including the reactor pressure vessel head, and the extent to which inspections have been undertaken to satisfy applicable regulatory requirements.Bulletin 2002-01 also required licensees to provide the basis for concluding that plans for future inspections of the reactor coolant pressure boundary will satisfy applicable regulatory requirements at their respective pressurized water reactor plants. All addressees were requested to respond to Items 1.A.

through E. within 15 days of the Bulletins issuance, or to provide a written response to the NRC in accordance with the provisions of Title 10, Section 50.54(f), of the Code of Federal Regulations (10 CFR 50.54(f)) if they are unable to provide the information or they cannot meet the requested completion dates.

You provided your 15-day Bulletin response by letter dated April 1, 2002. The staff finds that you have provided the requested information, and has concluded that your plant does not appear to have conditions similar to those that led to the degradation at Davis-Besse.

However, the staff may issue questions to confirm or verify the information that was provided in your 15-day response to Bulletin 2002-01.

We will complete a full review of your response to Bulletin 2002-01 after we review your response to Items 2 and 3 of the Bulletin.

Sincerely,

/RA/

/RA/

Stephen R. Monarque, Project Manager Gordon E. Edison, Sr. Project Manager Project Directorate II, Section 1 Project Directorate II, Section 1 Division of Licensing Project Management Division of Licensing Project Management Office of Nuclear Reactor Regulation Office of Nuclear Reactor Regulation Docket Nos. 50-280, 50-281, 50-338, and 50-339 cc: See next page We will complete a full review of your response to Bulletin 2002-01 after we review your response to Items 2 and 3 of the Bulletin.

Sincerely,

/RA/

/RA/

Stephen R. Monarque, Project Manager Gordon E. Edison, Sr. Project Manager Project Directorate II, Section 1 Project Directorate II, Section 1 Division of Licensing Project Management Division of Licensing Project Management Office of Nuclear Reactor Regulation Office of Nuclear Reactor Regulation Docket Nos. 50-280, 50-281, 50-338, and 50-339 cc: See next page DISTRIBUTION:

PUBLIC SMonarque GEdison KLandis, RII ACRS PDII-1 R/F OGC EDunnington JNakoski WBateman ALee SCoffin EMCB R/F SBloom ADAMS ACCESS.ML021570330 OFFICE PM:PDII/S1 LA :PDII/S2 PM:PDII/S1 EMCB PDII-1/SC NAME SMonarque EDunnington GEdison SBloom JNakoski DATE 05/22/02 05/22/02 05/24/02 05/22/02 05/24/02 OFFICIAL RECORD

Mr. David A. Christian Virginia Electric and Power Company cc:

Ms. Lillian M. Cuoco, Esq.

Senior Nuclear Counsel Dominion Nuclear Connecticut, Inc.

Millstone Power Station Building 475, 5th Floor Rope Ferry Road Rt. 156 Waterford, Connecticut 06385 Mr. Richard H. Blount, II Site Vice President Surry Power Station Virginia Electric and Power Company 5570 Hog Island Road Surry, Virginia 23883-0315 Senior Resident Inspector Surry Power Station U. S. Nuclear Regulatory Commission 5850 Hog Island Road Surry, Virginia 23883 Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation P. O. Box 1197 Richmond, Virginia 23209 Robert B. Strobe, M.D., M.P.H.

State Health Commissioner Office of the Commissioner Virginia Department of Health P.O. Box 2448 Richmond, Virginia 23218 Office of the Attorney General Commonwealth of Virginia 900 East Main Street Richmond, Virginia 23219 Mr. Stephen P. Sarver, Director Nuclear Licensing & Operations Support Innsbrook Technical Center Virginia Electric and Power Company 5000 Dominion Blvd.

Glen Allen, Virginia 23060-6711 Mr. David A. Heacock Site Vice President North Anna Power Station Virginia Electric and Power Company P. O. Box 402 Mineral, Virginia 23117-0402 Mr. C. Lee Lintecum County Administrator Louisa County P.O. Box 160 Louisa, Virginia 23093 Old Dominion Electric Cooperative 4201 Dominion Blvd.

Glen Allen, Virginia 23060 Senior Resident Inspector North Anna Power Station U.S. Nuclear Regulatory Commission 1024 Haley Drive Mineral, Virginia 23117 Mr. William R. Matthews Vice President - Nuclear Operations Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, Virginia 23060-6711