June 5, 2002 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420

SUBJECT:

TURKEY POINT PLANT, UNITS 3 AND 4 15-DAY RESPONSE TO BULLETIN 2002-01, REACTOR PRESSURE VESSEL HEAD DEGRADATION AND REACTOR COOLANT PRESSURE BOUNDARY INTEGRITY, (TAC NOS. MB4586 AND MB4587)

Dear Mr. Stall:

On March 18, 2002, the staff issued U.S. Nuclear Regulatory Commission (NRC)Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, to the industry. The Bulletin requested that addressees provide information related to the structural integrity of the reactor coolant pressure boundary, including the reactor pressure vessel head, and the extent to which inspections have been undertaken to satisfy applicable regulatory requirements.Bulletin 2002-01 also required licensees to provide the basis for concluding that plans for future inspections of the reactor coolant pressure boundary will satisfy applicable regulatory requirements at their respective pressurized water reactor plants. All addressees were requested to respond to Items 1.A. through E. within 15 days of the Bulletins issuance, or to provide a written response to the NRC in accordance with the provisions of Title 10, Code of Federal Regulations, Section 50.54(f) if they were unable to provide the information or could not meet the requested completion dates.

Your letter of April 2, 2002, provided your 15-day Bulletin response to the NRC. The staff finds that you have supplied the requested information, and concludes that your plant does not appear to have conditions similar to those which led to the degradation at Davis-Besse.

However, the staff may issue questions to confirm or verify the information that was provided in your 15-day response to Bulletin 2002-01. We will complete a full review of your response to Bulletin 2002-01 after we review your response to Items 2 and 3 of the Bulletin.

Sincerely,

/RA/

Eva A. Brown, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251 cc: See next page

June 5, 2002 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420

SUBJECT:

TURKEY POINT PLANT, UNITS 3 AND 4 15-DAY RESPONSE TO BULLETIN 2002-01, REACTOR PRESSURE VESSEL HEAD DEGRADATION AND REACTOR COOLANT PRESSURE BOUNDARY INTEGRITY, (TAC NOS. MB4586 AND MB4587)

Dear Mr. Stall:

On March 18, 2002, the staff issued U.S. Nuclear Regulatory Commission (NRC)Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, to the industry. The Bulletin requested that addressees provide information related to the structural integrity of the reactor coolant pressure boundary, including the reactor pressure vessel head, and the extent to which inspections have been undertaken to satisfy applicable regulatory requirements.Bulletin 2002-01 also required licensees to provide the basis for concluding that plans for future inspections of the reactor coolant pressure boundary will satisfy applicable regulatory requirements at their respective pressurized water reactor plants. All addressees were requested to respond to Items 1.A. through E. within 15 days of the Bulletins issuance, or to provide a written response to the NRC in accordance with the provisions of Title 10, Code of Federal Regulations, Section 50.54(f) if they were unable to provide the information or could not meet the requested completion dates.

Your letter of April 2, 2002, provided your 15-day Bulletin response to the NRC. The staff finds that you have supplied the requested information, and concludes that your plant does not appear to have conditions similar to those which led to the degradation at Davis-Besse.

However, the staff may issue questions to confirm or verify the information that was provided in your 15-day response to Bulletin 2002-01. We will complete a full review of your response to Bulletin 2002-01 after we review your response to Items 2 and 3 of the Bulletin.

Sincerely,

/RA/

Eva A. Brown, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251 cc: See next page DISTRIBUTION: EBrown BClayton(hard copy)

PUBLIC KJabbour OGC HBerkow WBateman PDII-2 R/F BMoroney ACRS ALee SCoffin EMCB R/F SBloom RMusser(RII)

ACCESSION NO. ML021560568 OFFICE PDII-2/PM PDII-2/LA EMCB PDII-2/SC(A)

NAME EBrown BClayton SBloom KJabbour DATE 6\\03\\02 6\\03\\02 6\\04\\02 6\\04\\02 OFFICIAL RECORD COPY

Mr. J. A. Stall TURKEY POINT PLANT Florida Power and Light Company cc:

M. S. Ross, Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. John P. McElwain, Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035 County Manager Miami-Dade County 111 NW 1 Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Plant U.S. Nuclear Regulatory Commission 9762 SW. 344th Street Florida City, Florida 33035 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 T. O. Jones, Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035 Walter Parker Licensing Manager Turkey Point Nuclear Plant 9760 SW 344th Street Florida City, FL 33035 Mr. Don Mothena Manager, Nuclear Plant Support Services P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420