April 2002 Monthly Operating Report for Susquehanna, Units 1 & 2
ML021560450
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/10/2002
From: Shriver B
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-005479
Download: ML021560450 (7)


Text

Bryce L. Shriver Vice President - Nuclear Site Operations PPL Susquehanna, LLC 707 Salem Boulevard P.O. Box 467 Berwick, PA 18603-0467 Tel.570.542.3120 Fax 570.542.1504 blshriver@pplweb.com I

ppl TM May 10, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-137 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005479 R41-2A The April 2002 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours, Bry'ce L. Shriver cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. S. Hansell NRC Sr. Project Manager, Mr. R. G. Schaaf

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 5-10-02 J. J. Hennings (570) 542-3747 OPERATING STATUS

1. Unit Name:

Susquehanna Steam Electric Station (Ul)

2.

Reporting Period:

April 2002

3.

Design Electrical Rating (Net MWe):

1100

4.

Maximum Dependable Capacity (Net MWe):

1090 Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 719 237.6 172.7 0

146,008 Yr.-to-Date 2879 1,681.3 1,612.8 0

1,553,404

5.
6.
7.
8.

9.

Cumulative 165,648 135,983.5 133,772.8 0

136,780,313 NOTES:

Page 1 of 1

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 5-10-02 J. J. Hennings (570) 542-3747 REPORT MONTH April 2002 No.

Date Type Duration Reason Method of Cause & Corrective Action I

(Hours) 2 Shutting To Prevent Recurrence Down Reactor 3

3-02-02 S

1217.9 C

2 Continuation of Unit I 12t Refueling and Inspection Outage that started 3/02/02 and ended 4/21/02.

Outage extended past 35 day schedule due to Main Generator stator bar replacements.

2 4-22-02 F

48.7 A

2 Manual scram from 18% power following 12'b Refuel and Inspection Outage due to reactor recirc pump trip. Pump tripped due to inadequate contact between a fuse and its fuse holder in the voltage regulation circuit. Fuse and fuse holder were replaced. Similar configurations were also inspected to ensure adequate fuse to fuse holder contact.

Summary: (1) Continuation of Refueling and Inspection Outage and Main Generator maintenance.

(2) During ramp-up from 1 2th Refuel and Inspection Outage, a reactor recirc pump tripped at 20%

power. A manual Reactor scram was inserted at 18% power on April 22. Pump tripped due to inadequate contact between a fuse and fuse holder in the voltage regulation circuit. Fuse and fuse holder were replaced and start-up was initiated on April 23 and the generator was on-line April 24 at 0156.

On April 26 power ascension was delayed to repair Main Generator Hydrogen leak at approximately 75% power. 100% reactor power was achieved on April 27.

2.

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

3.

Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other

1.

F. Forced S. Scheduled Page 1 of 1

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-387 Completed by:

J. J. Hennings Date:

5-10-02 Telephone:

(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 5-10-02 J. J. Hennings (570) 542-3747 OPERATING STATUS

1. Unit Name:

Susquehanna Steam Electric Station (U2)

2.

Reporting Period:

April 2002

3.

Design Electrical Rating (Net MWe):

1117

4.

Maximum Dependable Capacity (Net MWe):

1111 Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 719 719 719 0

802,564 NOTES:

Page 1 of 1

5.
6.
7.
8.

9.

Yr.-to-Date 2,879 2,879 2,879 0

3,188,007 Cumulative 150,888 130,536.0 128,645.7 0

133,992,837

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 5-10-02 J. J. Hennings (570) 542-3747 REPORT MONTH April 2002

1.
2.

3.

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other No.

Date Type Duration Reason Method of Cause & Corrective Action S(Hours) 2 Shutting to Prevent Recurrence Down Reactor 3

No Shutdowns this month.

F. Forced S. Scheduled Page 1 of 1

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-388 Completed by:

J. J. Hennings Date:

5-10-02 Telephone:

(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.