Bryce L. Shriver Vice President - Nuclear Site Operations PPL Susquehanna, LLC 707 Salem Boulevard P.O. Box 467 Berwick, PA 18603-0467 Tel.570.542.3120 Fax 570.542.1504 blshriver@pplweb.com I
ppl TM May 10, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-137 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005479 R41-2A The April 2002 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.
Very truly yours, Bry'ce L. Shriver cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. S. Hansell NRC Sr. Project Manager, Mr. R. G. Schaaf
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 5-10-02 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susquehanna Steam Electric Station (Ul)
- 2.
Reporting Period:
April 2002
- 3.
Design Electrical Rating (Net MWe):
1100
- 4.
Maximum Dependable Capacity (Net MWe):
1090 Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 719 237.6 172.7 0
146,008 Yr.-to-Date 2879 1,681.3 1,612.8 0
1,553,404
- 5.
- 6.
- 7.
- 8.
9.
Cumulative 165,648 135,983.5 133,772.8 0
136,780,313 NOTES:
Page 1 of 1
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 5-10-02 J. J. Hennings (570) 542-3747 REPORT MONTH April 2002 No.
Date Type Duration Reason Method of Cause & Corrective Action I
(Hours) 2 Shutting To Prevent Recurrence Down Reactor 3
3-02-02 S
1217.9 C
2 Continuation of Unit I 12t Refueling and Inspection Outage that started 3/02/02 and ended 4/21/02.
Outage extended past 35 day schedule due to Main Generator stator bar replacements.
2 4-22-02 F
48.7 A
2 Manual scram from 18% power following 12'b Refuel and Inspection Outage due to reactor recirc pump trip. Pump tripped due to inadequate contact between a fuse and its fuse holder in the voltage regulation circuit. Fuse and fuse holder were replaced. Similar configurations were also inspected to ensure adequate fuse to fuse holder contact.
Summary: (1) Continuation of Refueling and Inspection Outage and Main Generator maintenance.
(2) During ramp-up from 1 2th Refuel and Inspection Outage, a reactor recirc pump tripped at 20%
power. A manual Reactor scram was inserted at 18% power on April 22. Pump tripped due to inadequate contact between a fuse and fuse holder in the voltage regulation circuit. Fuse and fuse holder were replaced and start-up was initiated on April 23 and the generator was on-line April 24 at 0156.
On April 26 power ascension was delayed to repair Main Generator Hydrogen leak at approximately 75% power. 100% reactor power was achieved on April 27.
- 2.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
- 3.
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other
- 1.
F. Forced S. Scheduled Page 1 of 1
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387 Completed by:
J. J. Hennings Date:
5-10-02 Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 5-10-02 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susquehanna Steam Electric Station (U2)
- 2.
Reporting Period:
April 2002
- 3.
Design Electrical Rating (Net MWe):
1117
- 4.
Maximum Dependable Capacity (Net MWe):
1111 Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 719 719 719 0
802,564 NOTES:
Page 1 of 1
- 5.
- 6.
- 7.
- 8.
9.
Yr.-to-Date 2,879 2,879 2,879 0
3,188,007 Cumulative 150,888 130,536.0 128,645.7 0
133,992,837
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 5-10-02 J. J. Hennings (570) 542-3747 REPORT MONTH April 2002
- 1.
- 2.
3.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other No.
Date Type Duration Reason Method of Cause & Corrective Action S(Hours) 2 Shutting to Prevent Recurrence Down Reactor 3
No Shutdowns this month.
F. Forced S. Scheduled Page 1 of 1
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-388 Completed by:
J. J. Hennings Date:
5-10-02 Telephone: