ML021560072

From kanterella
Jump to navigation Jump to search
Transmittal of Revised Manual Table of Contents for Susquehanna EP-PS-244, Dose Assessment Staffer
ML021560072
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/29/2002
From:
Pennsylvania Power & Light Co
To:
Office of Nuclear Security and Incident Response
References
0386, 23244 EP-PS-244
Download: ML021560072 (3)


Text

May.

29, 2002 Page 1

of 1

MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2002-26 USER INFORMATION:

FpLAm÷hpLAUREL 2

REMPL#:23244 CA#:

0386 AJddc.s.

U[UCCA2 Phone#: 254-3658 TRANSMITTAL INFORMATION:

TO.

E 05/29/2002 LOCATION:

DOCUMENT CONTROL DESK FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER NUCSA-2) 2'HE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

244 244 DOSE ASSESSMENT STAFFER REMOVE MANUAL TABLE OF CONTENTS DATE:

12/13/2001 ADD MANUAL TABLE OF CONTENTS DATE:

05/28/2002 CATEGORY:

PROCEDURES TYPE:

EP ID:

EP-PS-244 No Table of Contents No Procedure UALS WILL BE DISTRIBUTED CE WITH DEPARTMENT Replace contents of Tab 14ALL CHANGES AND

-OUR NIMS INBOX UPON RECEIPT OF HARD COPY.

FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

  1. C'G)

EOF DOSE ASSESSMENT FLOWCHART FACILITY"STATUS Dose Assessment Supervisor

- Recovery Manager Info and Target Takeover Time Dose Assessment Staffer

- Phones/Fax Field Team Director

- RMS/Radio/Phones EOF Dose Calculator

- MIDAS/PICSY Rad Liaison

- Phones/DEP-BRP "A" and "B" Field Teams

- Kits/Vehicles/Phones EVENT STATUS RPC to DASU TSC DC to DAST HP Radloman to FTD "A" and "B" Team Briefing Staff Briefing and Info Exchange TURNOVER RPC to DASU Fwd Calc -TSC or EOF Back Calcs - TSC or EOF OSCAR Control DEP/BRP Communications Event/Source Term Agreement Liquid/Airborne Release Previous Data Transferred Turnover Time TAB 14 EP-PS-244-14 I MONITOR EFFLUENT RELEASE AND PLANT STATUS 1 PIS e

etDt S*PICSY Met Vent Data "Field Team and Fixed Monitor Data "In-Plant Conditions Default

> Dfaul Accident>Deul calculaion YS Accident triggers ff MIDAS Menu D (note 3)

NUE 28>NUREG 1228 Calculation

>YE Triggers? (note MIDAS Menu C Verify with Field Data and*

Evaluate for PAR USE WITH CAUTION*

Notify RM

  • Notify Danville (Ref. Emerg Classification "Assemble Sampling Teams Section 1.0)

" Evaluate need for second FTD YEBl BlwouttPne N

Use Blowout Panel Design Basis Release Rates FORWAR:D CALCULATION MIDAS B

Liq 7<

"'-'-Re-,

alculate Moasured/ProJected Ratio I

vES.

r "Approve PAR Forms

  • Contact DEP/BRP

- About every 30 Minutes

- Classification or PAR Change between NO 0.1 and 5?

fVY S Ratio >S Nf High Field Readings UNMONITORED RELEASE MIDAS EW Back E

Calculation Calculation Data No "Control Exoosure and Dose I

P-AD.000-087, Revision 2, Page 1 of 2 NO SPING Data YE Iquid IS White?

ise >TR?

NO iote 2)

Consult with yEngineering Cong l

l Low Confidence (white) Datah Vent

'YES Realease?

fNO, (note )

YES Vent Totals I FV alid ?

N M J FORWARD CALCULATION MIDAS B Back Calculatio Actiitie ow Field Readings < 0.1

-TD LOCATE PLUME Plume E__

1G Releas"Consider transition from NO3 Terminated?

YES-plume to post-plume phase I

for Env. Sampling Teams 1

"Select appropriate TWDE and THY CDE

  • Discuss Release Pathway and Source Term with Engineering Support Supervisor
  • Report Classification and PAR Triggers to RM
  • Select PAR at Command and Control Table per PAR Guide

<2 Rem WB w/o Extension

< 4 Rem WB - w/Extension

>*4 Rem WB -w/Emerg. Extension

<*S Rem Thy CDE/Shift

<*25 Rem Thy CDE Total "Initiate Thy CDE Tracking

> 1000 mrem/hr Thy CDE

> 1200 ncpm (cartridge)

"*Consider WBC 1

4

-9

--I II =

I i 4 I

i I

i I

I I

I 1--7 k

I

TAB 14 EP-PS-244-14 NOTE I NOTE 2 NOTE 3 NOTE 4 NOTE 5 VENT RELEASE LIQUID RELEASE DEFAULT ACCIDENT RMS/FIELD NUREG 1228 TRIGGERS TRIGGERS TRIGGERS TRIGGERS TRIGGERS

  • AIRBORNE RELEASE LIQUID RELEASE AIRBORNE RELEASE CORE UNCOVERED >15 MINUTES

>8.51E5 uci/min NG Liquid Effl. > TRM

> 0.1 mrsm/hr WB

>1.04E2 uci/min Iodine

> 68.4 mrem/hr Thy CDE

>7.72E2 uci/min Part.

> 100 ncpm on I Cartridge

+ EAL 15.1 FOR G60min.

  • EAL 15.1 SPENT FUEL POOL RELEASE

>1.70E8 uci/min NG Liquid Effl. > TRM

>2.08E2 uci/min Iodine

>1.54E3 uci/min Part.

  • EAL15.2 for15 min.

EAL15.2

  • EAL 3.2 SEVERE CLAD DEGRADATION

>1.70E8 uci/min NG Liquid Effl. > 10 x TRM

>200 R/hr CHRM

>2.08E4 uci/min Iodine

>300 uci/cc DE 1-131

>1.54E5 uci/min Part.

+ EAL 15.3

  • EAL 3.3 SEVERLY DEGRADED CORE Projected dose rates @ EPB

> 400 R/hr CHRM

>100 mrem/hr TEDE for 30min or

> 1000 uci/cc DE 1.131

>500 mrem/hr THY CDE for 30min or

>15 rmm/hr TEDE for 2min or

>75 rem/hr THY CDE for 2min Projected dose @ EPB

>500 mrsm TEDE within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />

  • EAL15.4 EAL 3.4 CORE MELT Projected Dose @ EPB

>400R/hr CHRM

> I Rem TEDE

>1000uci/cc DE Iodine-131

_ 5 Rem THY CDE

> 2000 R/hr CHRM EP-AD-OO-087, Revision 2, Page 2 of 2 H:\\DATA\\EP-PS-244-14, TAB 14, REV-2, PAGE 2 OF 2.doc