ML021550503
| ML021550503 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 05/24/2002 |
| From: | Susquehanna |
| To: | Document Control Desk, Office of Nuclear Security and Incident Response |
| References | |
| EP-PS-104-12 | |
| Download: ML021550503 (6) | |
Text
May.
24, 2002 Page 1
of 1
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2002-264/1 USER INFORMATION:
--LA
' LAURL B--EMPL#:23244 CA#:
0386 A-d-nss :
INU~bAZ Phone#: 254-3658 TRANSMITTAL INFORMATION:
Tu --.,.
+/-tun~a..* B 05/24/2002 LOCATION:
DOCUMENT CONTROL DESK FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER NUCSA-2)
T--THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
104 104 RADIATION PROTECTION COORDINATOR (RPC):
EMERGENCY PLSN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE:
04/04/2002 ADD MANUAL TABLE OF CONTENTS DATE:
05/23/2002 CATEGORY:
PROCEDURES TYPE:
EP ID:
EP-PS-104 No Table of Contents No Procedure N/A Replace contents of Tab 12 N/A N/A N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5
DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY.
FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
N
TAB 12 EP-PS-1 04-12 EMERGENCY EXPOSURE EXTENSION REQUEST DATE I
TIME TYPE OF DOSE EXTENSION (V,):
TEAM El Extend to 25 Rem El Extend to Rem Approved by/date (RPC/DASU):
Approved by/date (ED/RM):
Name Soc Sec # Sianature I
I Current
- year, dose, Signature of volunteer denotes an understanding and an awareness of the risks involved, including the numerical levels of dose at which acute effects of radiation will be incurred and numerical estimates of the risk of delayed effects.
Lifetime
- dose, mrnpr E-plan IP nn,'inn EP-AD-000-135, Revision 5, Page 1 of 3
TAB 12 EP-PS-1 04-12 ALARA REVIEW Check v A. PERSON-REM ESTIMATION
- 1. Assess the number of workers required.
- 2.
Evaluate the use of fewer workers.
- 3.
Investigate experience of workers selected.
- 4. Assure all workers have essential, productive tasks.
- 5. Assure workers have available exposure.
- 6.
Evaluate criteria for emergency exposure.
B. PLANNING S1. Preplanning meeting with supervisors and/or workers required.
- 2. Access to and exit from work are planned.
- 3. Evaluate staging/setup in accessible low dose rate area.
- 4. Prefabrication considered.
- 5.
Evaluate use of remote handling devises or other special tools.
- 6. Cold equipment "mockups", rehearsals, or other practical exercise.
C. EXPOSURE REDUCTION CONTROLS-
- 1. Evaluate need for timekeeping.
- 2. Consider use of water bucket shielding for carrying hot parts.
- 3. Consider use of shielded drums or lead "pigs" for carrying hot parts.
- 5.
Consider use of shadow shields utilizing a portable curtain shield.
- 6. System or equipment to be filled with water.
- 7. System or equipment to be drained and flushed.
- 8. Assess exposure reduction by permitting decay of radiation sources during reactor shutdown or system isolation.
- 9. Assess the need of communication devices such as head sets, TV cameras, others.
- 10. Assess practicality of removing component from radiation area.
- 11. Evaluate use of photographs of "as installed equipment" to aid in worker briefings.
D. AIRBORNE/CONTAMINATION CONTROL
- 1. Assess need for respiratory protection usage against effectiveness of engineering controls.
- 2. Assess individual's history of internal DAC-Hr exposure to airborne contamination.
- 3. Assess necessity of area decon before commencement of work.
- 4. Containment structure (tent) required.
- 5. Portable ventilation system required.
- 6. Assess need for flooding or draining rooms.
- 7. Assess hot particle or fuel fragment migration.
Performed by EP-AD-000-135, Revision 5, Page 2 of 3
TAB 12 EP-PS-1 04-12 Provided below are the instructions on how to retrieve an individual's occupational exposure information.
- 1.
Log into NIMS, go to RPDPERX screen.
- 2.
Query the individual.
- 3.
Click on DOSE SUMMARIES button.
- 4.
The screen in Figure 1 will appear.
- 5.
The individual's YEAR-TO-DATE (YTD) dose will be provided as 'NRC PERIOD EXPOSURE' for the current calendar year.
LRPD~~< ~~jj Dose Sumrnmaies P
So Reae f-..
.1*
Person Name ID~
TV e Dose Summ, iies MR DDE LDE.
SDEWB SDEIIAE CEDE.
,TEDE TODE--
- j......
Cr
- x...........f**
- i.
- l l.5+/-!' *..2*I~*4l' L.
Lifetime Exposure I
52 52 62 62
- 0.
0!
52152 I
.f et ime L e el 1 45000]
i002 lRc Period Available :]
201 200 40000,1 40000f ___
__T__
j 00120 FT002FRC *Peri od Exposure 0-o a]-
05 F0TI T-o 200_21+RC Period Level 2000 120001 4 0oo 400*1 2* 2000 (202wn S.SES Exposure___I I-2002ISSES Expýosure 1
__°iL 0
0 0
07 IL it 11 Figure 1 EP-AD-000-135, Revision 5, Page 3 of 3 4-
! ; :?i
TAB 12 Affected Unit Control No.
EP-PS-104-12 PROTECTIVE ACTION RECOMMENDATION FORM 0l This is a Drill 0 This is not a Drill
- 1.
This is of the Susquehanna Steam Electric Station.
- 2.
The EMERGENCY CLASSIFICATION is:
El Unusual Event 01 Alert 0 Site Area Emergency 0 General Emergency This represents 0 Initial 0 Escalation 0 Reduction 0 No Change in the Classification Status.
- 3.
Emergency Action(s) implemented onsite:
0 None 0 Evacuation of non-essential personnel O Local Area Evacuation 0 Issuance of KI to emergency workers O Site Accountability 0 Other
- 4.
The PUBLIC PROTECTIVE ACTION RECOMMENDATION is:
"El No Protective Action Recommendation Required "El Shelter miles 0 Contamination Controls/Decontamination "El Evacuation "El Divert Danville Drinking Water Supply Expected arrival of release at Danville "El Relocation 0l Control of Access El Other This represents: 0 Initial 0 Change 0 No Change in the PUBLIC PROTECTIVE ACTION RECOMMENDATION.
- 5.
The BASIS for the recommendation is:
A.
Plant Status and Prognosis EP-AD-000-110, Revision 6, Page 1 of 2 (duplex)
TAB 12 EP-PS-104-12 B.
STATUS OF RADIOACTIVE REL.EASES.
AIRBORNE:
0 Less than Tech Requirements Limit (Routine) 0 At or greater than Tech Requirements Limit (Event Related)
LIQUID: 0 Less than Tech Requirements Limit (Routine) 0 At or greater than Tech Requirements Limit (Event Related)
C.
Weather Conditions D.
Dose Projections E.
Other
- 6.
Other information transmitted or received:
- 7.
APPROVAL TIME/DATE (RPC or DAS if no action or change in the recommendation; ED or RM if action or change is recommended)
- 8.
TRANSMITTAL:
0 Verbal 0 Electronic 0 Both TO:
NAME AGENCY DATE/TIME EP-AD-000-110, Revision 6, Page 2 of 2 (duplex)