ML021480342
| ML021480342 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 05/10/2002 |
| From: | Pace P Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML021480342 (5) | |
Text
Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 10 CFR 50.4 MAY 1 0 2002 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C. 20555 Gentlemen:
Docket Nos.
In the Matter of Tennessee Valley Authority 50-390 WATTS BAR NUCLEAR PLANT (WBN)
APRIL 2002 MONTHLY OPERATING REPORT Enclosed is the April 2002 Monthly Operating Report as required by WBN Technical Specification Section 5.9.4.
If you have any questions concerning this matter, please call me at (423) 365-1824.
Sincerely, P.
L. 'ace Manager, Site Licensing and Industry Affairs Enclosure cc:
See page 2 V
Pnnted on reoycled paper
) )
U.S. Nuclear Regulatory Commission Page 2 MAY 1 0 2002 cc (Enclosures):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr.
L.
Mark Padovan, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St.,
SW, Suite 23T85 Atlanta, Georgia 30303
'K ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)
MONTHLY OPERATING REPORT APRIL 2002 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1
OPERATING DATA REPORT Docket No.
50-390 Unit Name:
WBN Unit 1 Date:
May 2, 2002 Completed By:
D. K. Floumoy Telephone:
(423) 365-3803 Reporting Period:
April 2002
- 1.
Design Electrical Rating (MWe-Net):
1155
- 2.
Maximum Dependable Capacity (MWe-Net):
1125 Month Year-to-Date
- 3.
Number of Hours Reactor was Critical 719 2330.3
- 4.
Hours Generator On-Line 719 2289.3
- 5.
Unit Reserve Shutdown Hours 0.0 0.0
- 6.
Net Electrical Energy Generated (MWh) 828559 2611103 Cumulative 47429.2 47189.8 0.0 51997818.6 E-2
UNIT SHUTDOWNS DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-390 WBN-1 May 2, 2002 D. K. Flournoy (423) 365-3803 The unit operated at or near full power for the entire month of April 2002. No significant power reductions or shutdowns occurred during this reporting period.
'F: Forced
'Reason:
3 Method 4 Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Trip/Scram Event Report (LER)
C-Refueling 3-Automatic Trip/Scram (NUREG - 1022)
D-Regulatory Restriction 4-Continuation Outage E-Operator Training / License Examination 5-Other (Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
Summary:
The unit operated at or near full power for the entire month of April 2002. No significant power reductions or shutdowns occurred during this reporting period.
There were no challenges to the pressurizer power operated relief valves or pressurizer safety valves during the month of April 2002.
E-3 REPORT PERIOD: May 2002