May 22, 2002 Mr. A. C. Bakken III Senior Vice President Nuclear Generation Group American Electric Power Company 500 Circle Drive Buchanan MI 49107
SUBJECT:
ASSESSMENT FOLLOW-UP LETTER - D. C. COOK NUCLEAR POWER PLANT
Dear Mr. Bakken:
On May 6, 2002, the NRC staff forwarded a letter concerning the final significance determination of a White inspection finding in the mitigating systems cornerstone. The finding involved your staffs failure to take corrective actions to preclude a repetitive failure of the Unit 2 Turbine Driven Auxiliary Feedwater Pump, a significant condition adverse to quality.
As a result, we have assessed D. C. Cook performance to be in the Regulatory Response column of the NRCs Action Matrix. Therefore, we plan to conduct Supplemental Inspection Procedure 95001 during the week of June 17, 2002. This inspection procedure is conducted to provide assurance that the root causes and contributing causes of risk significant performance issues are understood, the extent of condition is identified, and the corrective actions are sufficient to prevent recurrence.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Mr. David Passehl at (630) 829-9872 with any questions you may have regarding this letter.
Sincerely,
/RA/
Geoffrey E. Grant, Director Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 See Attached Distribution
See Previous Concurrences DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML021430391.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII RIII NAME SOrth:dtp DPassehl AVegel GGrant DATE 05/22/02 05/22/02 05/22/02 05/22/02 OFFICIAL RECORD COPY
A. C. Bakken III cc w/encl:
J. Pollock, Site Vice President M. Finissi, Plant Manager R. Whale, Michigan Public Service Commission Michigan Department of Environmental Quality Emergency Management Division MI Department of State Police D. Lochbaum, Union of Concerned Scientists
A. C. Bakken III cc w/encl:
J. Pollock, Site Vice President M. Finissi, Plant Manager R. Whale, Michigan Public Service Commission Michigan Department of Environmental Quality Emergency Management Division MI Department of State Police D. Lochbaum, Union of Concerned Scientists ADAMS Distribution:
WDR DFT JFS2 RidsNrrDipmIipb GEG HBC BJK1 DRPIII DRSIII PLB1 JRK1