MONTHYEARML0210600062002-04-18018 April 2002 Federal Notice Memo Re; Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing Project stage: Other ML0211901512002-04-25025 April 2002 Supplement to License Amendment Request for Battery Surveillance Requirement Project stage: Supplement ML0211506952002-04-26026 April 2002 License Amendment, Revises the Surveillance Requirements for the Train AB, and Cd Batteries in TS 4.8.2.3.2.c.1 Project stage: Acceptance Review ML0214104312002-05-17017 May 2002 Additional Information Regarding Emergency License Amendment Request for Unit 2 Train AB & Cd Battery Surveillance Requirements Project stage: Request ML0212805022002-05-30030 May 2002 License Amendment, Re Modifying the Requirements to Verify Battery Cells, Cell Plates and Racks Project stage: Acceptance Review 2002-04-26
[Table View] |
Similar Documents at Cook |
---|
Category:Letter
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] |
Text
Indiana Michigan Power Company Cook Nudear Planl One Cook Plame Bndgman, MI 49106 6164655&%1 INDIANA MICHIGAN POWER May 17, 2002 AEP:NRC:2382-02 10 CFR 50.4 Docket No.: 50-316 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-Pl-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Unit 2 ADDITIONAL INFORMATION REGARDING THE EMERGENCY LICENSE AMENDMENT REQUEST FOR UNIT 2 TRAIN AB AND CD BATTERY SURVEILLANCE REQUIREMENTS (TAC No.: MB4928)
References:
- 1) Letter from John F. Stang, Nuclear Regulatory Commission (NRC), to A. Christopher Bakken III, Indiana Michigan Power Company (I&M), "Donald C. Cook Nuclear Plant, Unit 2 Issuance of Amendment Re: Battery Surveillance Requirements (TAC No. MB4928)," dated April 26, 2002
- 2) Letter from J. E. Pollock, (I&M) to NRC Document Control Desk, "Donald C. Cook Nuclear Plant Unit 2, Docket No.:
50-316 Supplement to License Amendment Request for Battery Surveillance Requirement TAC Nos. MB4760 and MB4761,"
AEP:NRC:2382-01, dated April 25, 2002 This letter provides a written follow-up to an April 26, 2002, conversation between I&M and NRC personnel concerning the Donald C. Cook Nuclear Plant Unit 2 Train AB station battery.
Between April 3, 2002, and April 23, 2002, I&M replaced five Unit 2 Train AB battery cells whose cell covers were found cracked. I&M determined that the cracking was common to battery cells in a lot purchased from C&D Technologies, Inc. (C&D) in 1994. The battery cells were subsequently installed in the Unit 2 Train AB battery system.
AEP.: Anerica's bnergy Partner9e
U. S. Nuclear Regulatory Commission AEP:NRC:2382-02 Page 2 In Reference 1, the NRC approved I&M's emergency Technical Specification amendment request (Reference 2) that revised Surveillance Requirement 4.8.2.3.2.c.1 for the Unit 2 Train AB and CD batteries only. The change allows batteries exhibiting physical damage or abnormal deterioration to be evaluated to determine if the damage or deterioration impacts battery performance.
Since battery cells from the lot purchased in 1994 remain in the Unit 2 Train AB battery system, additional cell covers may crack in the future. As such, I&M is committing to replacing and/or repairing those battery cells exhibiting cover cracking during the next Unit 2 outage of convenience, when sufficient time and the appropriate parts are available. Battery cell repairs will be performed in accordance with C&D approved methods.
If you have any questions or require additional information, please contact Mr. Gordon P. Arent, Manager of Regulatory Affairs, at (616) 697-5553.
Sincerely, S. A Greenlee Director, Nuclear Technical Services RV/dmb Attachment c: K. D. Curry, w/o attachment J. E. Dyer MDEQ - DW & RPD, w/o attachment NRC Resident Inspector R. Whale, w/o attachment
U. S. Nuclear Regulatory Commission AEP:NRC:2382-02 Page 3 bc: G. P. Arent A. C. Bakken III P. B. Cowan R. W. Gaston S. A. Greenlee S. B. Haggerty D. W. Jenkins J. E. Pollock J. F. Stang, Jr., - NRC Washington, DC T. R. Stephens
Attachment to AEP:NRC:2382-02 COMMITMENT The following table identifies the action committed to by Indiana Michigan Power Company (I&M) in this submittal. Other actions discussed in the submittal represent intended or planned actions by I&M. They are described to the Nuclear Regulatory Commission (NRC) for the NRC's information and are not regulatory commitments.
Commitment Date I&M will replace and/or repair those battery cells exhibiting cover cracking. Battery cell repairs will be performed in accordance with C&D Technologies, Inc. approved methods.
The replacement and/or repair of the affected battery cells will be performed during the next Unit 2 outage of convenience, when sufficient time and the appropriate parts are available.