ML021370038
| ML021370038 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 05/16/2002 |
| From: | Ernstes M Division of Reactor Safety II |
| To: | Stall J Florida Power & Light Co |
| References | |
| 50-335/2002-301, 50-389/2002-301 | |
| Download: ML021370038 (7) | |
See also: IR 05000335/2002301
Text
May 16, 2002
Florida Power and Light Company
ATTN: Mr. J. A. Stall, Senior Vice President
Nuclear and Chief Nuclear Officer
P. O. Box 14000
Juno Beach, FL 33408-0420
SUBJECT:
ST. LUCIE NUCLEAR PLANT - SENIOR REACTOR OPERATOR RETAKE
EXAMINATION REPORT 50-335/02-301 AND 50-389/02-301
Dear Mr. Stall:
On April 22, 2002, the NRC authorized your staff to administer two Senior Reactor Operator
(SRO) retake written examinations to employees of your company who had applied for licenses
to operate the St. Lucie Nuclear Plant, Units 1 and 2. The NRC waived the operating
examination for the SRO applicants. At the conclusion of the examination, the examiner
discussed the examination questions and preliminary findings with those members of your staff
identified in the enclosed report.
The two SRO applicants passed the initial retake written examination, representing a 100
percent pass rate.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document Room
or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
Should you have any questions concerning this letter, please contact me at (404) 562-4638.
Sincerely,
/RA/
Michael E. Ernstes, Chief
Operator Licensing and
Human Performance Branch
Division of Reactor Safety
Docket Nos. 50-335, 50-389
Enclosure: (See page 2)
2
Enclosure: Examination Report
cc w/encl:
D. E. Jernigan
Site Vice President
St. Lucie Nuclear Plant
Florida Power & Light Company
Electronic Mail Distribution
Plant General Manager
St. Lucie Nuclear Plant
Electronic Mail Distribution
T. L. Patterson
Licensing Manager
St. Lucie Nuclear Plant
Electronic Mail Distribution
Don Mothena, Manager
Nuclear Plant Support Services
Florida Power & Light Company
Electronic Mail Distribution
Mark Dryden
Administrative Support & Special Projects
Florida Power & Light Company
Electronic Mail Distribution
Rajiv S. Kundalkar
Vice President - Nuclear Engineering
Florida Power & Light Company
Electronic Mail Distribution
M. S. Ross, Attorney
Florida Power & Light Company
Electronic Mail Distribution
William A. Passetti
Bureau of Radiation Control
Department of Health
Electronic Mail Distribution
Craig Fugate, Director
Division of Emergency Preparedness
Department of Community Affairs
Electronic Mail Distribution
J. Kammel
Radiological Emergency
Planning Administrator
Department of Public Safety
Electronic Mail Distribution
Douglas Anderson
County Administrator
St. Lucie County
2300 Virginia Avenue
Ft. Pierce, FL 34982
C. A. Pell, Training Manager
St. Lucie Nuclear Plant
6351 South Ocean Drive
Jensen Beach, FL 34957
3
Distribution w/encl:
B. Moroney, NRR
RIDSNRRDIPMLIPB
PUBLIC
OFFICE
RII:DRS
RII:DRS
RII:DRP
RII:DRS
SIGNATURE
/RA/
/RA/
/RA/
/RA/
NAME
SRose:pmd
GHopper
RMusser
MErnstes
DATE
5/15/02
5/15/02
5/16/02
5/16/02
E-MAIL COPY?
YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO
OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML021370038.wpd
Enclosure
U.S. NUCLEAR REGULATORY COMMISSION
REGION II
Docket Nos:
50-335, 50-389
License Nos:
Report Nos:
50-335/02-301, 50-389/02-301
Licensee:
Florida Power & Light Company (FPL)
Facility:
St. Lucie Nuclear Plant, Units 1 & 2
Location:
6351 S. Ocean Drive
Jensen Beach, FL 34957
Date:
April 22, 2002
Examiner:
Steven D. Rose, Operations Engineer
Approved by:
Michael E. Ernstes, Chief
Operator Licensing and Human Performance Branch
Division of Reactor Safety
SUMMARY OF FINDINGS
ER 50-335/2002-301 and ER 50-389/2002-301 on 4/22/2002, Florida Power & Light Company,
St. Lucie Plant, Units 1 & 2, Licensed Operator Examinations.
The NRC authorized your staff to administer the Senior Reactor Operator retake written
examination in accordance with the guidance of Examination Standards, (ES) NUREG-1021,
Revision 8, Supplement 1. This examination implemented the Senior Operator licensing
requirements of 10 CFR §55.43. No significant issues were identified.
Report Details
4
OTHER ACTIVITIES
4OA5 Other
a.
Scope
The licensee administered a retake written examination to two SRO applicants on
April 22, 2002. The licensee developed the examination in accordance with NUREG 1021, Revision 8, Supplement 1. The two SRO applicants were granted waivers for the
operating examinations previously passed during the initial examination conducted in
May 2001.
b.
Findings
No findings of significance were identified. All applicants passed the examination.
The written examination and answer key may be accessed in ADAMS system under
ADAMS Accession Number ML021340626.
4OA6 Management Meetings
Exit Meeting Summary
The NRC was not on site for the administration of the initial retake written examination.
The results were discussed via telephone conversation between Mr. Steven D. Rose,
Operations Engineer, and Mr. Larry Rich, St. Lucie Operations Training Instructor. No
proprietary information was identified.
PARTIAL LIST OF PERSONS CONTACTED
Licensee
Larry Rich, St. Lucie Operations Training Instructor