En 'ergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Tel 914 272 3200 Fax 914 272 3205 SAFEGUARDS INFORMATION Michael R. Kansler Senior Vice President &
Chief Operating Officer May 15, 2002 ENO 1.2.02.046 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Mail Stop O-Pl-17 Washington, DC 20555-0001
SUBJECT:
REFERENCES:
Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Supplemental Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures
- 1. NRC letter to Michael R. Kansler from Samuel J. Collins dated February 25, 2002,regarding "Issuance of Order for Interim Safeguards and Security Compensatory Measures" for Pilgrim Nuclear Power Station
- 2. Entergy letter to USNRC, dated March 18, 2002 (ENGC 1.2.02.024) regarding "Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures."
Dear Sir or Madam:
On March 18, 2002, Entergy submitted its response to the Interim Safeguards and Security Compensatory Measures Order (Order, Reference 1) issued by the United States Nuclear Regulatory Commission (NRC) on February 25, 2002. As a result of telephone discussions with the NRC staff, Entergy is clarifying its prior response (Reference 2) to include additional information.
Pursuant to the requirements of 10 CFR § 50.4 the attachment to this letter contains Entergy's supplemental responses to Sections B.1.c and B.5.d of the Order. These responses supercede and replace the responses submitted with Reference 2. The attached responses also identify the current schedule dates for completion of the Order requirements based upon the latest available information. As required by the Order the actions to implement the Order have been started and unless relief has been requested all of the actions will be completed no later than August 31, 2002. Attachment 1 to this response contains safeguards information, as defined in 10 CFR § 73.21. Entergy therefore requests that this attachment be withheld from public disclosure.
NOTICE: contains "Safeguards Information".
Upon separation of Attachment I from this letter it becomes "DECONTROLLED"
SAFEGUARDS INFORMATION Pursuant to the requirements of 10 CFR § 2.202(a)(2), the answer to the Order, was transmitted to the Secretary of the Commission under separate cover. Also transmitted under separate cover to the Director, Office of Nuclear Reactor Regulation was a request for an extension of time in which to request a hearing. A copy of the supplemental responses is also being provided to the Secretary of the Commission and the Director, Office of Nuclear Reactor Regulation.
As required by Condition C.2 of the Order, Entergy will notify the Commission when full compliance has been achieved.
If you have any questions or require additional information, please contact Ms. Charlene Faison at 914-272-3378.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 14 th day of May, 2002.
Very truly yours, M*Michael R. Kansler Senior Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.
Attachment:
- 1.
Supplemental Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures - Pilgrim, Revision to Sections B.1.c and B.5.d.
cc: Next page
cc:
Mr. Samuel J. Collins, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 05-E-07 Washington, DC 20555-0001 Secretary Office of the Secretary U.S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, DC 20555-001 Mr. Dennis C. Dambly Assistant General Counsel for Materials Litigation and Enforcement U.S. Nuclear Regulatory Commission Mail Stop 15-D-21 Washington, DC 20555-0001 Mr. Hubert Miller Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Travis L. Tate, Project Manager Project Directorate I Division of Licensing Project Management U.S. Nuclear Regulatory Commission Mail Stop 0-8-BIA Washington, DC 20555-0001 Senior Resident Inspector, M/S 66 Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360