May 28, 2002 MEMORANDUM TO: File FROM:
Jack N. Donohew, Senior Project Manager, Section 2 Project Directorate IV
/RA/
Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
CLOSEOUT OF FIRE PROTECTION PROGRAM PLAN CHANGES FOR CALLAWAY PLANT (TAC NO. MB2919)
By letter dated September 5, 2001, the licensee submitted a request for the NRC staff to approve changes to the fire protection program for Callaway Plant, Unit 1. The requested changes involved the design configuration of Fire Areas A-1, A-18, and A-27. The licensee provided supplemental information in its letter of December 13, 2001. This request was related to NRC Inspection Report 50-483/00-13 dated October 30, 2000.
By letter dated May 13, 2002, the licensee withdrew its request for the NRC staff to approve the fire protection program changes. In the letter, the licensee stated that it had decided to withdraw its application for economic reasons and planned to pursue a plant modification. As described in the attached e-mail, the licensee will be installing a 1-hour fire wrap on one of the redundant circuits in each of the above fire areas. The licensee stated that this fire wrap will bring the plant in accordance with commitments made in Section III.G, "Fire Protection of Safe Shutdown Capability," of Final Safety Analysis Report (FSAR) Appendix 9.5E, which provides the plant design comparison to 10 CFR Part 50, Appendix R, "Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979."
Docket No. 50-483
Attachment:
E-mail dated May 14, 2002
ML021360596 OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC NAME JDonohew:as EPeyton SDembek DATE 5/24/02 5/24/02 5/24/02
E-MAIL DATED MAY 14, 2002 From:
"Shafer, David E" <DShafer@ameren.com>
To:
"Jack Donohew" <JND@nrc.gov>
Date:
5/14/02 11:29AM
Subject:
RE: Fire Protection Program Plan Changes Closeout Letter We have decided to install a 1-hour fire wrap. This fire wrap will be placed on one of the redundant circuits in each fire area thereby bringing Callaway Plant in accordance with commitments made in FSAR Appendix 9.5E, to Section III.G., Design Comparison to 10CFR50, Appendix R. Completion of the modifications will close out the finding by placing the plant in compliance with our licensing commitments. Since the corrective action for this finding does not require NRC approval, we will track the finding to closure using our corrective action program. We will be maintaining compensatory measures (hourly fire watches) until the modifications are completed.
Dave Shafer Phone 314-554-3104 Fax 314-554-3558 Email dshafer@ameren.com
Original Message-----
From: Jack Donohew [1]
Sent: Tuesday, May 14, 2002 9:11 AM To: david_e_shafer@ameren.com
Subject:
Fire Protection Program Plan Changes Closeout Letter In the letter of May 13, 2002, it is stated that the application dated September 5, 2001, for the Fire Protection Program Plan changes was being withdrawn. You are pursuing a plant modification. What is the plant modification to be done and the current schedule to complete the work?
<JND>
CC:
"Eitel, Lee E." <leeitel@cal.ameren.com>, "Reidmeyer, Mark A."
<mareidmeyer@cal.ameren.com>, "Hermann, Tim D." <tdhermann@cal.ameren.com>,
"Blosser, John D." <jdblosser@cal.ameren.com>