ML021360334

From kanterella
Jump to navigation Jump to search

Tech Spec Pages, Amendment No. 150 Dated May 14, 2002
ML021360334
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/14/2002
From:
NRC/NRR/DLPM
To:
References
TAC MB1304
Download: ML021360334 (1)


Text

Control Rod Scram Times 3.1.4 SURVEILLANCE REQUIREMENTS


NOTE -------------------------------------

During single control rod scram time Surveillances, the control rod drive (CRD) pumps shall be isolated from the associated scram accumulator.

SURVEILLANCE FREQUENCY 4

SR 3.1.4.1 Verify each control rod scram time is Prior to within the limits of Table 3.1.4-1 with exceeding reactor steam dome pressure Ž 950 psig. 40% RTP after fuel movement within the reactor pressure vessel AND Prior to exceeding 40% RTP after each reactor shutdown

Ž 120 days SR 3.1.4.2 Verify, for a representative sample, each tested control rod scram time is within the 200 days cumulative I limits of Table 3.1.4-1 with reactor steam operation in dome pressure Ž 950 psig. MODE 1 SR 3.1.4.3 Verify each affected control rod scram time Prior to is within the limits of Table 3.1.4-1 with declaring any reactor steam dome pressure. control rod OPERABLE after work on control rod or CRD System that could affect scram time (continued)

GRAND GULF 3.1-13 Amendment No. 42-9, 150