ML021360334

From kanterella
Jump to navigation Jump to search

Tech Spec Pages, Amendment No. 150 Dated May 14, 2002
ML021360334
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/14/2002
From:
NRC/NRR/DLPM
To:
References
TAC MB1304
Download: ML021360334 (1)


Text

Control Rod Scram Times 3.1.4 SURVEILLANCE REQUIREMENTS


NOTE -------------------------------------

During single control rod scram time Surveillances, the control rod drive (CRD) pumps shall be isolated from the associated scram accumulator.

SURVEILLANCE SR 3.1.4.1 Verify each control rod scram time is within the limits of Table 3.1.4-1 with reactor steam dome pressure

Ž 950 psig.

FREQUENCY 4

Prior to exceeding 40% RTP after fuel movement within the reactor pressure vessel AND Prior to exceeding 40% RTP after each reactor shutdown

Ž 120 days SR 3.1.4.2 Verify, for a representative sample, each 200 days tested control rod scram time is within the cumulative limits of Table 3.1.4-1 with reactor steam operation in dome pressure

Ž 950 psig.

MODE 1 SR 3.1.4.3 Verify each affected control rod scram time Prior to is within the limits of Table 3.1.4-1 with declaring any reactor steam dome pressure.

control rod OPERABLE after work on control rod or CRD System that could affect scram time (continued)

Amendment No.

42-9, 150 I

GRAND GULF 3.1-13