ML021350663

From kanterella
Jump to navigation Jump to search
Notice of Meeting with Entergy Nuclear Operations, Inc. to Conduct a Regulatory Performance Meeting to Review Entergy'S Performance Improvement Efforts as Described in the Indian Point Unit 2 Fundamentals Improvement Plan (FIP)
ML021350663
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 05/15/2002
From: Eselgroth P
Reactor Projects Branch 2
To:
References
Download: ML021350663 (3)


Text

May 15, 2002 U.S. NUCLEAR REGULATORY COMMISSION REGION I No.02-029 NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee: Entergy Nuclear Operations, Inc.

Facility: Indian Point Unit 2 Docket No.: 50-247 Time and Date: 3:00 p.m., May 30, 2002 Location: Verplanck Fire House Broadway and 8th Street (Approximately 200 Yards West of Broadway)

Verplanck, NY 10596

Purpose:

To conduct a regulatory performance meeting to review Entergys performance improvement efforts as described in the Indian Point Unit 2 Fundamentals Improvement Plan (FIP). This is a working level meeting that will discuss various areas of the FIP including equipment reliability, design and configuration control, human performance, and problem identification and resolution.

NRC Attendees: H. J. Miller, Regional Administrator, Region I B. E. Holian, Deputy Director, Division of Reactor Projects P. W. Eselgroth, Chief, Projects Branch 2, Division of Reactor Projects P. J. Habighorst, Senior Resident Inspector, Indian Point 2 D. Screnci, Senior Public Affairs Office, Region I Et. Al.

Licensee Attendees: F. Dacimo, Vice President - Operations - Indian Point 2 L. Temple, General Manager - Operations - Indian Point 2 G. Schwartz, Director - Engineering, Indian Point 2 P. Rubin, Operations Manager, Indian Point 2 Et. Al.

NOTE: This meeting is open to the public for observation. The NRC will answer questions from the public after the meeting has concluded. Attendance by additional NRC personnel should be made known by May 24, 2002, via telephone call to Peter W. Eselgroth at (610) 337-5234. Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known no later than two business days prior to the meeting.

/RA/

Prepared by: _____________________________

Peter W. Eselgroth, Chief Projects Branch 2 Division of Reactor Projects Distribution:

Mr. F. Dacimo, Vice President - Operations

2 J. McCann, Manager, Nuclear Safety and Licensing P. Eselgroth, DRP S. Barber, DRP R. Junod, DRP Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist Region I Docket Room (w/concurrences)

State of New York

3 Distribution (Via E-Mail):

W. Travers, Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

W. Kane, Deputy Executive Director for Reactor Programs, OEDO S. Collins, Director, Office of Nuclear Reactor Regulation, NRR C. Grimes, Director, Division of Regulatory Improvement Programs, NRR B. Boger, Director, Division of Inspection Program Management, NRR F. Congel, Director, Office of Enforcement J. Johnson, Deputy Director, Office of Nuclear Regulatory Research (NRR/OD)

J. Zwolinski, Director, Division of Licensing Project Management T. Bergman, RI EDO Coordinator, OEDO S. Richards, Project Directorate I-1 (PD1/2), NRR P. Milano, NRR G. Vissing, NRR, (Backup)

R. Clark, NRR W. Lanning, DRS R. Crlenjak, DRS D. Screnci, Public Affairs, RI N. Sheehan, Field Public Affairs Officer, RI R. Bores, ORA P. Habighorst - Indian Point 2 G. Matakas, ORA PMNS NRCWEB OEWEB OEMAIL DOCUMENT NAME: C:\ORPCheckout\FileNET\ML021350663.WPD After declaring this document An Official Agency Record it will/will not be released to the Public. To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP N RI/DRP E NAME SBarber/SB PEselgroth/PWE DATE 05/15/02 05/15/02 OFFICIAL RECORD COPY