OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE STATION:

HOPE CREEK A--zj.h 1 5 wzt~s 4-he, an/jy ekhant-e 4-0 6OHb SYSTEM:

TASK:

TASK NUMBER:

JPM NUMBER:

Safety & Turbine Auxiliaries Cooling Respond To An Abnormal Release Of Gaseous Radioactivity/SACS Pump Auto Start Failure 4000270401

[SRO(U) B.1.b-RO B.1.f]

ALTERNATE PATH: W APPLICABILITY:

EO =

ROW-K/A NUMBER:

IMPORTANCE FACTOR:

STA =

SRO LXI 400000A4.01 3.1 RO 3.0 SRO EVALUATION SETTING/METHOD:

Simulator/Perform

REFERENCES:

HC.OP-SO.SM-0001(Q), Rev.: 12 HC.OP-SO.EG-0001(Q), Rev.: 27 TOOLS AND EQUIPMENT:

None VALIDATED JPM COMPLETION TIME:

(16) Minutes TIME PERIOD IDENTIFIED FOR TIME CRITICAL STEPS:

CAUTION:

No plant equipment shall be operated during the performance of a JPM without the following:

1. Permission from the OS or Unit CRS;
2. Direct oversight by a qualified individual (determined by the individual granting permission based on plant conditions).
3. Verification of the "as left" condition by a qualified individual.

Page I of 9 N/A ACTUAL JPM COMPLETION TIME:

Minutes ACTUAL TIME CRITICAL COMPLETION:

N/A JPM PERFORMED BY:

GRADE: D SAT n

UNSAT REASON, IF UNSATISFACTORY:

EVALUATOR'S SIGNATURE:

DATE:

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE NAME:

DATE:

SYSTEM:

TASK:

Safety & Turbine Auxiliaries Cooling Respond To An Abnormal Release Of Gaseous Radioactivity/SACS Pump Auto Start Failure TASK NUMBER:

4000270401 INITIAL CONDITIONS:

1. A Radiological Event has occurred on the Refuel Floor.
2. Refuel Floor Exhaust Ventilation Radiation Monitors are in ALERT and continuing to rise.
3. HC.OP-EO.ZZ-0103/104, Reactor Building and Rad Release Control, is being implemented.

INITIATING CUE:

When Refuel Floor Ventilation Exhaust radiation levels exceed 2.3E-3 pCi/ml, perform the Isolation Systems Automatic Initiation/Observation in accordance with HC.OP-SO.SM 0001.

Page 2 of 9 Successful Completion Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

SYSTEM:

TASK:

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE NAME:

DATE:

Safety & Turbine Auxiliaries Cooling Respond To An Abnormal Release Of Gaseous Radioactivity/SACS Pump Auto Start Failure STEP COMMENTS STEP STEP NO.

(*Denotes a Critical Step)

STANDARDEVAL (Required for UNSAT

(#Denotes a Sequential Step)

S/U evaluation)

Operator obtains and locates Operator obtains the correct procedure HC.OP-SO.SM-0001.

procedure.

Operator reviews precautions and Operator reviews precautions and limitations, limitations.

Examiner Cue: If excessive time is taken to review precautions and limitations, inform operator that all are satisfied.

Operator determines beginning step Operator determines correct beginning of the procedure.

step of procedure to be 5.2.

START TIME:

5.2.1 Upon receipt AND validation of Operator determines that TABLE SM Isolation signal, OBSERVE the 019 applies REFUEL FLOOR required actions for that particular EXHAUST RADIATION - HIGH and isolation, have occurred lAW Table observes that the Group 19 Dampers SM-001 through SM-020.

have closed and other Actions have occurred for Equipment listed as specified.

Examiner Cue: Respond as Equipment Operator to report status of GU-HD9395A, GU-HD9395B (closed), and Reactor Building Ventilation System (all fans secured) as required.

Page 3 of 9

SYSTEM:

TARIK.

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE Safety & Turbine Auxiliaries Cooling Piannnd T^ An Ahntnrm~nI AmIchnon Cf (Zcw~

D r4rv.-4hi+ /QZA('(

D~

A. U+r 4Z+

r+ I-;I NAME:

DATE:

II t,

V \\.

I I**./VII S l*J,

.1 ~

51 E-UkLl*.llll 5

I

\\U U,*]4~lS VlI..,I JI4*II LIJUO I

\\0 4U(SIJ*'.LIV ILy

%I/-*

I U lIE Ij.J I/-IULU

  • .JLOI I. I allUli ;

STEP COMMENTS STEPStp NO.

(*Denotes a Critical Step)

STANDARD EVAL (Required for UNSAT

(#Denotes a Sequential Step)

S/U evaluation) 5.2.2 IF all operations have not occurred, Examiner Note: Operator notices that PERFORM required operations lAW GU-BV206, FRVS VENT FAN B is not applicable SOP.

running. This fan is not required to be in service as long as GU-AV206, FRVS VENT FAN A is in operation. The operator may place the GU-BV206 in service in accordance with the applicable SOP.

Operator notices that EG-BP210, SAFETY AUXILIARIES COOLING PUMP B has failed to automatically start by observing its START pushbutton flashing and determines to start the pump in accordance with HC.OP-SO.EG-0001.

HC.OP-SO.EG-0001 Operator obtains and locates Operator obtains the correct procedure HC.OP-SO.EG-0001.

procedure.

Operator reviews precautions and Operator reviews precautions and limitations, limitations.

Examiner Cue: If excessive time is taken to review precautions and limitations, inform operator that all are satisfied.

Operator determines beginning step Operator determines correct beginning of the procedure.

step of procedure to be 5.2.

Page 4 of 9

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE NAME:

DATE:

Safety & Turbine Auxiliaries Cooling Respond To An Abnormal Release Of Gaseous Radioactivity/SACS Pump Auto Start Failure STEP STEP COMMENTS NO.

(*Denotes a Critical Step)

STANDARD EVAL (Required for UNSAT

(#Denotes a Sequential Step)

S/U evaluation) 5.2 Placing SACS in Service Examiner Note: There are numerous steps In this procedure, which provide guidance on starting a SACS pump. It is NOT critical to use this section of the procedure.

5.2.1 ENSURE all prerequisites of Section Operator reviews prerequisites.

2.2 are satisfied.

Examiner Cue: If excessive time is taken to review the prerequisites, inform operator that all are satisfied.

Operator determines steps that are not applicable and marks them as N/A.

Examiner Cue: SRO approval is given for those steps marked as N/A.

Page 5 of 9 SYSTEM:

TASK:

Safety & Turbine Auxiliaries Cooling OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE NAME:

DATE-

,.puiu I u AnAbnormalt Reiease r aseous Hadioactivlty/,SAC;S P'ump Auto Start Failure STEP COMMENTS NO.P

(*Denotes a Critical Step)

NO.

(*Denotes a Sqetial Step)

STANDARD EVAL (Required for UNSAT

(#Denotes a Sequential Step)

STANS/U evaluation) 5.2.3 PLACE SACS Loop A(B) in service as follows:

A. PERFORM the following (10C651):

Operator observes that LOOP B ISLN

1. PLACE LOOP A(B) ISLN TACS TACS CLG/HYDRO PNEU ACC AIR CLG/HYDRO PNEU TACS INBD SPLY/RTN, HV2522B /

ACC AIR TACS INBD SPLY/RTN, HV2496B are in AUTO HV2522A1HV2496A (HV2522B/

HV2496B) in AUTO.

2. PLACE LOOP A(B) ISLN TACS Operator observes that LOOP B ISLN CLG/HYDRO PNEU TACS CLG/HYDRO PNEU ACC AIR ACC AIR TACS OUTBD TACS OUTBD SPLY/RTN, HV2522D I SPLY/RTN, HV2522C/HV2496C HV2496D are in AUTO (HV2522D / HV2496D) in AUTO.

5.2.3 B. PLACE SACS Loop A(B) in service as follows:

Operator observes that the REMOTE 1.OBSERVE LOOP A(B) PUMP push-button is OFF for BP210.

A(B) REMOTE push-button is OFF.

2.PLACE LOOP A(B) PUMP A(B)

Operator depresses the BP210 MAN in MAN control.

push button and observes that the MAN push button is illuminated and the AUTO push button is extinguished.

Examiner Note: The pump will start if the START push button is pressed in AUTO or MAN control.

Page 6 of 9 SYSTEM:

TA V.

SYSTEM:

TASK:

OPERATOR TRAINING PROGRAM JOB PERFORMANCE MEASURE NAME:

DATE:

Safety & Turbine Auxiliaries Cooling Respond To An Abnormal Release Of Gaseous Radioactivity/SACS Pump Auto Start Failure STEP COMMENTS ENO.

(*Denotes a Critical Step)

EVAL (Required for UNSAT

(#Denotes a Sequential Step)

STANDARD S/U evaluation)

3. START LOOP A(B) PUMP A(B)

Operator depresses the BP210 START AND PERFORM the following:

push button and observes that the START push button is illuminated and

a. OBSERVE that LOOP A(B) the STOP push button is extinguished.

PUMP A(B) LOW DIFF PRESS light extinguishes.

Examiner Note: Pressing the START push button is critical.

b. IF EGHV-2491A(B), SACS Operator observes EGHV-2491B, FOOP A(B) HEAT SACS LOOP B HEAT EXCHANGER EXCHANGER INLET INLET ISOLATION VALVE, is open.

ISOLATION VALVE, is closed, THEN OBSERVE that it auto opens.

STOP TIME:_

Terminating Cue: Repeat back message from the operator on the status of the JPM, and then state "This JPM is complete" Page 7 of 9

JOB PERFORMANCE MEASURE SIMULATOR INSTRUCTIONS Reset to IC-1.

Insert the following malfunctions.

MALFUNCTION

SUMMARY

Initial I Description Delay Ramp Remote/Event Init Final 1.32 2.32

1. RM9627 RFE VENT A RADIATION MONITOR 120 E-3 E-3 1.46 2.46
2. RM9628 RFE VENT B RADIATION MONITOR 120 E-3 E-3 1.36 2.42
3. RM9629 RFE VENT C RADIATION MONITOR 120 E-3 E-3
4. CW25B BP210 SACS PUMP FAIL TO AUTO START
5.

Take the Simulator to RUN, acknowledge RM-1 1 alarms, and then place the Simulator in FREEZE.

Keep the Simulator in Freeze until the operator has acknowledged the Initiating Cue.

Page 9 of 9