Category:Request for Additional Information (RAI)
MONTHYEARML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23116A1462023-04-26026 April 2023 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Final RAI for Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23059A0742023-02-27027 February 2023 Information Request, Security IR 2023402 ML22353A6122022-12-19019 December 2022 March 2023 Emergency Preparedness Exercise Inspection - Request for Information ML22271A8572022-10-0303 October 2022 Notification of Commercial Grade Dedication Inspection (05000416/2023011) and Request for Information ML22110A1172022-04-19019 April 2022 (GG) 2022 Emergency Preparedness (EP) Program Inspection RFI Sdh 041922 ML21179A1202021-06-28028 June 2021 Notification of NRC Supplemental Inspection of Action Matrix Column 3 (Degraded Performance) Inputs and Request for Information ML21074A0822021-03-15015 March 2021 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000416/2021002) and Request for Information ML20363A1462020-12-22022 December 2020 Request for Information: Grand Gulf EP Exercise Inspection - March 2021 ML20258A0202020-09-0909 September 2020 EP Program Inspection RFI, Request for Information to Support and Prepare for Emergency Preparedness (EP) Program Inspection Scheduled to Occur the Week of November 16, 2020 ML20260H4422020-09-0808 September 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Official RAIs for RR Associated with Updating ASME Code RR SEs with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML20155K7172020-06-0303 June 2020 Notification of NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000416/2020013) and Request for Information ML20150A6012020-05-29029 May 2020 NRR E-mail Capture - Grand Gulf - Official RAI for LAR Associated with Containment ILRT Interval Change from 10 Years to 15 Years ML19302E1082019-10-29029 October 2019 Document Request - GG 95001 - August 2 2019 ML19078A3772019-03-19019 March 2019 NRR E-mail Capture - Grand Gulf - Official Rais for Relief Request GG-ISI-023, Inservice Inspection Impracticality, Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval ML19063B4882019-03-0404 March 2019 Notification of NRC Triennial Heat Sink Performance Inspection (05000416/2019002) and Request for Information ML18304A4602018-10-31031 October 2018 NRR E-mail Capture - Final Request for Additional Information - TSTF-425 (L-2018-LLA-0106) ML18250A3042018-08-30030 August 2018 NRR E-mail Capture - Final Request for Additional Information - Emergency Action Level Scheme Change (L-2018-LLA-0116) ML18250A3032018-08-0101 August 2018 NRR E-mail Capture - Correction: Draft RAI - EAL Scheme Change (L-2018-LLA-0116) ML18187A3292018-07-20020 July 2018 Request for Additional Information, Request to Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML18138A4682018-05-23023 May 2018 Supplemental Information Needed for Acceptance of Request for Licensing Action Adoption of TSTF-425, Relocate Surveillance Frequencies to License Control ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update) ML17257A1422017-09-14014 September 2017 NRR E-mail Capture - Grand Gulf - Official Requests for Additional Information (Rais) for RR GG-ISI-020 to Use BWRVIP Guidelines ML17235B1752017-08-23023 August 2017 NRR E-mail Capture - Grand Gulf - Official RAI for Relief Request GG-ISI-021 Associated with Fourth Interval Inservice Inspection Using Code Case N-702 ML17214A0992017-08-0202 August 2017 NRR E-mail Capture - Grand Gulf - Official RAIs for LAR Associated with One Cycle Extension of Appendix J Type a ILRT and Drywell Bypass Test Interval ML17142A2582017-05-19019 May 2017 Notification of NRC Design Bases Assurance Inspection (05000416/2017007) and Initial Request for Information ML16181A1122016-07-12012 July 2016 Request for Additional Information on Severe Accident Mitigation Alternatives for the Review of the Grand Gulf Nuclear Station, Unit 1, License Renewal Application Environmental Review ML16117A1862016-04-26026 April 2016 Entergy Fleet Relief Request EN-ISI-15-1 Request for Additional Information - 04/26/16 Email from R. Guzman to G. Davant (CAC Nos. MF7133-MF7136) ML16013A0642016-01-13013 January 2016 NRR E-mail Capture - Request for Additional Information Entergy CNRO-2015-00023 - Revision to Entergy Quality Assurance Program Manual (Fleet Submittal CAC Nos. MF7086-MF7097) ML15341A1662015-12-0707 December 2015 NRR E-mail Capture - Entergy Fleet RR-EN-15-1, Request for Additional Information (CACs MF6341-MF6349) ML15286A1082015-10-28028 October 2015 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station, License Renewal Application ML15261A5652015-09-24024 September 2015 Request for Additional Information Regarding Proposed Revision of Technical Specifications for Containment Leak Rate Testing ML15085A4932015-04-0606 April 2015 Request for Additional Information for the Review of the Grand Gulf Nuclear Station License Renewal Application, Set 52 GNRO-2015/00002, Response to Electronic Request for Additional Information Regarding Modification of Technical Specification (TS) 3.8.4, DC Sources Operating Surveillance Requirements (Srs) 3.8.4.2 and 3.8.4.5. Amendment Request Dated 12/9/20142015-03-27027 March 2015 Response to Electronic Request for Additional Information Regarding Modification of Technical Specification (TS) 3.8.4, DC Sources Operating Surveillance Requirements (Srs) 3.8.4.2 and 3.8.4.5. Amendment Request Dated 12/9/2014 ML15036A5642015-02-18018 February 2015 Updated Fluence Methodology License Amendment Request Unacceptable with Opportunity to Supplement GNRO-2014/00079, Request for Additional Information Regarding Request for Adoption of TSTF-423, Revision 1, Change in Technical Specification End States (CE-NPSD-1186)2014-11-13013 November 2014 Request for Additional Information Regarding Request for Adoption of TSTF-423, Revision 1, Change in Technical Specification End States (CE-NPSD-1186) GNRO-2014/00076, Response to Request for Additional (RAI) Set 51 Dated September 11, 20142014-11-0606 November 2014 Response to Request for Additional (RAI) Set 51 Dated September 11, 2014 GNRO-2014/00031, Response to Electronic Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 3/18/20142014-04-11011 April 2014 Response to Electronic Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 3/18/2014 ML13318A8052014-01-0202 January 2014 Request for Additional Information for the Review of the Grand Gulf Nuclear Station, License Renewal Application (TAC No. ME7493) - Set 50 ML13353A6572013-12-19019 December 2013 Licensed Operator Positive Fitness-For-Duty Test ML13345A1822013-12-19019 December 2013 Supplemental Information Needed for Acceptance of Licensing Action, Request to Revise Technical Specification to Allow Operation in Expanded Maximum Extended Load Line Limit Analysis Plus (Mellla+) Domain ML13316B9862013-11-25025 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML13263A2252013-11-21021 November 2013 LRA Draft RAI Set 48 ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13260A0062013-09-16016 September 2013 Email, Request for Additional Information, Round 3, Request to Revise Technical Specifications and Surveillance Requirements to Support Operation with a 24-Month Fuel Cycle in Accordance with Generic Letter 91-04 ML13238A2342013-09-12012 September 2013 Requests for Additional Information for the Review of the Grand Gulf Nuclear Station, License Renewal Application (TAC No. ME7493) - Set 49 ML13227A3942013-08-28028 August 2013 Request for Additional Information for the Review of the Grand Gulf Nuclear Station, License Renewal Application (TAC No. ME7493) - Set 47 ML13226A1902013-08-14014 August 2013 Request for Additional Information Email, Round 2, Request to Revise FOL to Delete 2.C(32), Partial Feedwater Heating, to Allow Plant to Operate with Final Feedwater Temperature Reduction at End of Fuel Cycle ML13207A1242013-07-30030 July 2013 Request for Additional Information, Overall Integrated Plan in Response to 3/12/2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) ML13149A3662013-05-29029 May 2013 Request for Additional Information Email Decommissioning Funding Status Report 2023-04-26
[Table view] |
Text
Page 1 of 1 Grand Gulf Nuclear Station (GGNS)
License Amendment Request re: Emergency Diesel Generator (EDG)
Extended Allowed Out-of-Service Time (Ref. GNRO-2002/00007 dated January 31, 2002)
During review of the proposed changes in the referenced submittal, the NRC Electrical Engineering Section (EEIB) staff has prepared the following DRAFT questions for discussion and clarification during a forthcoming telephone conference. Responses to these questions are required in order for the EEIB staff to proceed further with its review:
- 1. Discuss and provide information on the reliability and availability of offsite power sources relating to the proposed change. The discussion should include duration, cause, date and time of each loss-of-offsite power (partial or complete) event.
2 It is the staff's understanding that the purpose of the requested amendment is to allow an increased outage time during plant power operation for performing EDG inspection, maintenance, and overhaul, which would include disassembly of the EDG. EDG operability verification after a major maintenance or overhaul may require a full load rejection test. If a full load rejection test is performed at power, please address the following:
- a. What would be the typical and worse-case voltage transients on the 4160-V safety buses as a result of a full-load rejection?
- b. If a full-load rejection test is used to test the EDG governor after maintenance, what assurance would there be that an unsafe transient condition on the safety bus (i.e.,
load swing or voltage transient) due to improperly performed maintenance or repair of a governor would not occur?
- c. Using maintenance and testing experience on the EDGs, identify possible transient conditions caused by improperly performed maintenance on the EDG governor and voltage regulator. Discuss the electrical system response to these transients.
- d. Provide the tests to be performed after the overhaul to declare the EDG operable and provide justification of performing those tests at power.
- 3. What type of communication has been established between the control room operator of Grand Gulf Nuclear Station and the System Load Dispatcher? Is the System Load Dispatcher notified in advance that the EDG is going to be out of service for an extended period of time?
- 4. It is stated that the Division 3 EDG can be cross-connected to either Division 1 or Division 2 AC buses to provide an alternate AC power source in the event of a station blackout. In this regard provide the following information:
- a. Is this a permanent cross-connection? How long would it take to accomplish this connection?
- b. Demonstrate that the Division 3 EDG has enough capacity to power loads that are needed for a station blackout and a loss of offsite power.
- c. Can this EDG be qualified as an alternate AC source according to the recommendation of Regulatory Guide 1.155," Station Blackout?