April 2002 Monthly Operating Report for Point Beach, Units 1 & 2
ML021340524
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/03/2002
From: Webb T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NRC 2002-0034
Download: ML021340524 (6)


Text

Kewaunee Nuclear Power Plant N490 Highway 42 Kewaunee, WI 54216-9511 920.388.2560 Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241 920.755.2321 Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC 2002-0034 GL 97-02 May 03, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units 1 And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of April 2002.

Sincerely, T. J. Webb Regulatory Affairs Manager KML Attachment cc:

J. D. Loock, PSCW NRC Region III NRC Senior Resident Inspector NRC Project Manager Committed to Nuclear Excellen>

--c"4

- Docket 50-266 and 50-301 NRC-2002-0034 ATTACHMENT 1 Letter from Thomas J. Webb (NMC)

To Document Control Desk (NRC)

Dated May 03, 2002 Re: Monthly Operating Report - April 2002

OPERATING DATA REPORT DATE: 05/02/02 COMPLETED BY: Kim M. Locke TELEPHONE: 920-755-6,420 OPERATING STATUS UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES REPORTING PERIOD: April - 2002 LICENSED THERMAL POWER (MWT): 1,518.5 NAMEPLATING RATING (GROSS MWE): 537.7 DESIGN ELECTRICAL RATING (NET MWE): 515.0 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 530.0 MAXIMUM DEPENDABLE CAPACITY (NET MWE): 510.0 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): n/a

10. REASONS FOR RESTRICTIONS, (IF ANY):

n/a HOURS IN REPORTING PERIOD NUMBER OF HOURS REACTOR WAS CRITICAL REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ONLINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH)

GROSS ELECTRICAL ENERGY GENERATED NET ELECTRICAL ENERGY GENERATED (MWH)

UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR UNIT CAPACITY FACTOR (USING MDC NET)

UNIT CAPACITY FACTOR (USING DER NET)

UNIT FORCED OUTAGE RATE THIS MONTH 719.0 719.0 0.0 719.0 0.0 1,091,081.0 379,740.0 363,661.0 100.0%

100.0%

99.2%

98.2%

0.0%

YEAR TO DATE 2,879.0 2,879.0 0.0 2,879.0 0.0 4,357,162.0 1,514,260.0 1,451,271.5 100.0%

100.0%

98.8%

97.9%

0.0%

CUMULATIVE 275,974.0 226,488.8 667.3 222,973.0 846.9 318,359,613.0 108,056,360.0 103,026,791.5 80.8%

81.1%

76.3%

74.8%

4.4%

DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED MAY 15, 1997

1.
2.
3.
4.
5.
6.
7.

8.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

DOCKET NO. 50-266

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

(1) Reason A. Equipment Failure (Explain)

B. Maintenance or Test C. Refueling D. Regulatory Restriction E. Operator Training/license Examination F.Administrative G.Operational Error (Explain) H.Other (Explain) 50-266 Point Beach, Unit 1 05/02/02 Kim M. Locke 755-6420 (2) Method 1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram

4. Continuation
5. Other (Explain)

SUMMARY

Unit 1 average daily power for the month of March was 500.4 MWe.

There were no Licensee Event Reports (LERs) submitted to the NRC.

There were no Significant Operating Events.

REPORTING PERIOD:

April 2002 (Month/Year)

NO.

DATE TYPE DURATION REASON (1)

METHOD OF CAUSE/CORRECTIVE ACTIONS F:

FORCED (HOURS)

SHUTTING S:

SCHEDULED DOWN (2)

COMMENTS N/A N/A N/A N/A N/A N/A N/A

OPERATING DATA REPORT DATE: 05/02/02 COMPLETED BY: Kim M. Locke TELEPHONE: 920-755-6,420 OPERATING STATUS UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 NOTES REPORTING PERIOD: April - 2002 LICENSED THERMAL POWER (MWT): 1,518.5 NAMEPLATING RATING (GROSS MWE): 537.7 DESIGN ELECTRICAL RATING (NET MWE): 515.0 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 532.0 MAXIMUM DEPENDABLE CAPACITY (NET MWE): 512.0 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): n/a

10. REASONS FOR RESTRICTIONS, (IF ANY):

n/a HOURS IN REPORTING PERIOD NUMBER OF HOURS REACTOR WAS CRITICAL REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ONLINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH)

GROSS ELECTRICAL ENERGY GENERATED NET ELECTRICAL ENERGY GENERATED (MWH)

UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR UNIT CAPACITY FACTOR (USING MDC NET)

UNIT CAPACITY FACTOR (USING DER NET)

UNIT FORCED OUTAGE RATE THIS MONTH 719.0 286.6 0.0 284.4 0.0 424,563.0 149,230.0 141,924.0 39.6%

39.6%

38.6%

38.3%

0.0%

YEAR TO DATE 2,879.0 2,385.9 0.0 2,372.7 0.0 3,539,519.0 1,236,500.0 1,183,401.5 82.4%

82.4%

80.3%

79.8%

2.9%

CUMULATIVE 260,759.0 220,167.5 233.9 217,226.9 302.2 313,587,936.0 106,964,540.0 101,966,908.5 83.3%

83.4%

79.7%

78.4%

2.2%

DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETIER DATED MAY 15, 1997

1.
2.
3.
4.
5.
6.
7.

8.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

DOCKET NO. 50-301

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-301 Point Beach, Unit 2 05/02/02 Kim M. Locke 755-6420 REPORTING PERIOD: April 2002 (Month/Year)

(1) Reason A. Equipment Failure (Explain)

B.

Maintenance or Test C.

Refueling D. Regulatory Restriction E. Operator Training/license Examination F.Administrative G.Operational Error (Explain) H.Other (Explain)

(2) Method 1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram

4. Continuation
5. Other (Explain)

SUMMARY

Unit 2 average daily power for the month of March was 197.8 MWe.

Licensee Event Report (LER) 301/2002-001-00, Completion Of Nuclear Plant Shutdown Required By LCO 3.5.2 Required Action B.1, was submitted to the NRC for the Unit 2 shutdown on Feb. 22, 2002.

There were no Significant Operating Events.

NO.

DATE TYPE DURATION REASON (1)

METHOD OF CAUSE/CORRECTIVE ACTIONS F:

FORCED (HOURS)

SHUTTING S:

SCHEDULED DOWN (2)

COMMENTS 3

04/12/02 S

432.4 C

1