ML021340189
| ML021340189 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/10/2002 |
| From: | Dennis Morey Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NEL-02-0112 | |
| Download: ML021340189 (6) | |
Text
Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 May 10, 2002 Docket Nos.:
50-348 50-364 SOUTHERN COMPANY Energy to Serve Your World"'
NEL-02-0112 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:
Enclosed are the April 2002 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 5.6.4 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted, Dave Morey RWC:mor
Enclosures:
- 1. April Monthly Operating Report for Plant Farley Unit 1
- 2. April Monthly Operating Report for Plant Farley Unit 2 Oave Morey Vice President Farley Project
Page 2 U. S. Nuclear Regulatory Commission cc:
Southern Nuclear Operating Company Mr. D. E. Grissette, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.
Mr. F. Rinaldi, Licensing Project Manager - Farley U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley
OPERATING DATA REPORT DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley - Unit 1 DATE:
May 3, 2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 OPERATING STATUS
- 1.
- 2.
3.
Reporting Period:
APRIL 2002 Design Electrical Rating (Net MWe):
854 Maximum Dependable Capacity (Net MWe):
833 Year to Date Cumulative Number Of Hours Reactor Was Critical:
Hours Generator On-line:
Unit Reserve Shutdown Hours:
Net Electrical Energy Generated (MWH):
719.0 719.0 0.0 601,780.0 2,879.0 175,124.9 2,879.0 172,847.2 0.0 0.0 2,434,894.0 136,787,840.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.
Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
El-i
- 4.
- 5.
- 6.
7.
This Month
UNIT SHUTDOWNS REPORTING PERIOD:
DOCKET NO.:
50-348 UNIT NAME: J. M. Farley - Unit 1 DATE:
May 3, 2002 COMPLETED BY:
W. L. Marlar APRIL 2002 TELEPHONE:
(334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/Corrective Actions No.
Date S: Scheduled (Hours)
(1)
(2)
Comments There were no unit shutdowns during the month.
(1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT E1-2 There were no significant power reductions this period.
OPERATING DATA REPORT DOCKET NO.:
50-364 UNIT NAME:
J. M. Farley - Unit 2 DATE:
May 3, 2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 OPERATING STATUS Reporting Period:
Design Electrical Rating (Net MWe):
Maximum Dependable Capacity (Net MWe):
APRIL 2002 855 842 This Month Number Of Hours Reactor Was Critical:
Hours Generator On-line:
Unit Reserve Shutdown Hours:
Net Electrical Energy Generated (MWH):
719.0 719.0 0.0 611,049.0 Year to Date Cumulative 2,879.0 158,364.6 2,879.0 156,424.8 0.0 0.0 2,460,457.0 125,042,536.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.
Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
E2-1
- 1.
- 2.
3.
- 4.
- 5.
- 6.
7.
UNIT SHUTDOWNS REPORTING PERIOD:
DOCKET NO.:
50-364 UNIT NAME: J. M. Farley - Unit 2 DATE:
May 3, 2002 COMPLETED BY:
W. L. Marlar APRIL 2002 TELEPHONE:
(334) 814-4554 (1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT E2-2 Type Method of F: Forced Duration Reason Shutting Down Cause/Corrective Actions No.
Date S: Scheduled (Hours)
(1)
(2)
Comments There were no unit shutdowns during the month.
There were no significant power reductions this period.