ML021330590

From kanterella
Jump to navigation Jump to search
Revision 14 to Procedure No. EI-4.1, Technical Support Center Activation.
ML021330590
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/30/2002
From: Brunet J
Consumers Energy
To: Mcknight J
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML021330590 (4)


Text

Date Entered: Apr 30, 2002 TO: USNRC/WASHINGTON JMCKNIGHT Copy Number: 145 TRANSMITAL NUMBER: 216250 PROCEDURE NUMBER: EI-4.1 TITLE: TECHNICAL SUPPORT CENTER ACTIVATION TRANSMITTAL: LISTED BELOW ARE NEW/REVISED PROCEDURES WHICH MUST BE IMMEDIATELY INSERTED INTO OR DISCARDED FROM YOUR PROCEDURE MANUAL.

Action Required Section or Description REMOVE AND DESTROY EI-4.1, R/14, COVERSHEET AND ATTACHMENT 4, PAGES 1-2 REPLACE WITH EI-4.1, R/14, COVERSHEET AND ATTACHMENT 4, PAGES 1-2 EDITORIAL SIGN, DATE, AND RETURN THE ACKNOWLEDGEMENT FORM WITHIN 10 DAYS TO THE PALISADES PLANT DOCUMENT CONTROL.

SIGNATURE OR INITIALS DATE kl) 4-1;

Procedure No EI-4.1 Revision 14 Issued Date 4/30/02 PALISADES NUCLEAR PLANT EMERGENCY IMPLEMENTING PROCEDURE TITLE: TECHNICAL SUPPORT CENTER ACTIVATION Proi-dr Sonsor date JBBurnett / 12/5/01 Technical Reviewer Date DLM*Ilins / 12/5/01 User Reviewer Date

Proc No EI-4.1 Attachment 4 Revision 14 Page 1 of 3 TECHNICAL SUPPORT CENTER ENGINEERING AND MAINTENANCE SUPPORT GROUP RESPONSIBILITIES The Engineering and Maintenance Support Group is responsible for providing a) Engineering Support for the TSC staff, b) interface with the Operational Support Center to coordinate dispatch of maintenance repair teams.

ACTIVATION Upon arrival at the TSC, the Engineering and Maintenance Support Group should initiate the following actions:

1. Group Leader:
a. Sign in on the TSC Activation Status Board.
b. Maintain a log of key activities.
c. Assign responsibilities to group members.
d. Prior to site evacuation, establish shift coverage requirements and notify Engineering Group personnel.
e. Indicate on the TSC Activation Status Board when the Engineering and Maintenance Support Group is ready.
2. Group Members:
a. Establish communication with the OSC Maintenance Communicator at Extension #2243, or using sound powered phone.

NOTE: Active LAN jacks in the TSC are labeled "LJB."

b. Move the Personnel Computer, located on the SED table, to the Engineering/Maintenance table, and log on.
c. Maintain a log of key activities.
d. Obtain copy of Els from procedure shelf.
e. Obtain P&IDs from cabinet or bring from desks.

Proc No EI-4.1 Attachment 4 Revision 14 Page 2 of 3 TECHNICAL SUPPORT CENTER ENGINEERING AND MAINTENANCE SUPPORT GROUP OPERATIONAL

1. Group Leader:
a. Be cognizant of Plant conditions as they apply to emergency classification (Emergency Implementing Procedure El-i, "Emergency Classification and Actions"), and advise the SED of any need to reclassify the emergency.
b. Advise the SED of any need to change emergency priorities.
c. Provide Engineering/Maintenance updates during TSC facility briefings using the TSC Briefing Check List Job Aid.
2. Maintenance Support:
a. Maintain communications with the OSC Maintenance Communicator to coordinate dispatch of maintenance repair teams.
b. Maintain the Emergency Priorities/Vital Equipment Out of Service Status Board.
c. Track OSC Maintenance and Auxiliary Operator resources available for dispatch.
d. Ensure that emergency priorities are consistent between the TSC and OSC.