.Z=
" Ent-rgy---
William J. Riggs Director, Nuclear Assessment April 9, 2002 Attention: Document ControlMDsk Washington, DC 20555-0001
SUBJECT:
Entergy Nuclear Generation Company Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Personnel and Man-Rem by Work and Job Function (CY-2001)
LETTER NUMBER:
2.02.027 The enclosed table, "Number of Personnel and Man-Rem by Work and Job Function," for the year 2001 is submitted in accordance with Technical Specification 5.6.1, and as recommended by Regulatory Guide 1.16. The tabulation supplements the reporting requirement of 10 CFR 20.2206.
The total dose measured by Self-Indicating Dosimeter (SID) was 180.609 man-rem. SID measurements are used for tracking dose assigned by job functions. In part, Technical Specification 5.6.1 specifies that in the aggregate, at least 80% of the total whole body dose received from external sources should be assigned to specific major work functions. The total dose was accounted for via radiation work permits assigned to specific major work functions.
Please feel free to contact Douglas Ellis, (508) 830-8160, if there are any questions regarding this subject.
e.-.J. R is DWE/
Enclosure:
(as stated) cc:
Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior NRC Resident Inspector 202027 Entergy Nuclear Generation Co.
Pigrim Station 600 Rocky Hill Road Plymouth, MA 02360
ALL PERSONNEL*
TOTAL MAN-REM WORK & JOB FUNCTION Station Utility Contractors Station Utility Contractors Employees Employees and Others Employees Employees and Others WASTE PROCESSING
-Maintenance 45 1
5 0.595 0.000 0.020
-Operations Personnel 28 1
9 0.890 0.000 0.348
-Health Physics 25 1
2 0.317 0.003 0.001
-Supervisory Personnel 8
0 2
0.051 0.000 0.204
-Engineering Personnel 1
0 0
0.000 0.000 0.000 REFUELING
-Maintenance 91 1
46 4.181 0.002 4.978
-Operations Personnel 57 0
14 0.970 0.000 0.008
-Health Physics 19 3
16 0.660 0.524 2.450
-Supervisory Personnel 17 1
4 0.404 0.000 0.313
-Engineering Personnel 18 2
47 0.202 0.001 4.966 1UiAL_
13 Y JOB FUNCTIOUN
-Maintenance
-Operations Personnel
-Health Physics
-Supervisory Personnel
-Engineering Personnel GRAND TOTALS**
401 287 134 144 267 1233 18 17 30 11 28 104 880 210 164 72 245 1571 38.201 20.744 11.375 3.938 5.170 79.428 1.575 0.389 2.196 0.045 0.045 4.251 61.443 4.374 16.365 1.290 13.459 96.930 Workers may be counted in more than one category.
Total dose by self-indicating dosimeter is 180.609 rem. Actual record dose by TLD is 179.410. Total TEDE dose is 179.585 rem.
- ~
NRC Operability Concerns with MOVs Design Basis Issues with Torus Downcomers Seismic Analysis Issues in Drywell
ENTERGY NUCLEAR GENERATION COMPANY PILGRIM NUCLEAR POWER STATION ANNUAL REPORT YEAR OF 2001 NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION ALL PERSONNEL*
TOTAL MAN-REM WORK & JOB FUNCTION Station Utility Contractors Station Utility Contractoi Employees Employees and Others Employees Employees and Other REACTOR OPERATION &
SURVEILLANCES
-Maintenance 83 4
161 1.237 0.028 3.018
-Operations Personnel 108 4
109 15.386 0.375 3.700
-Health Physics 41 19 58 5.908 1.476 2.338
-Supervisory Personnel 60 2
28 1.239 0.005 0.399
-Engineering Personnel 107 10 58 1.396 0.018 2.122 ROUTINE MAINTENANCE
-Maintenance 153 10 529 31.099 1.423 44.927
-Operations Personnel 90 12 75 3.213 0.014 0.307
-Health Physics 40 7
86 4.281 0.193 11.110
-Supervisory Personnel 54 8
36 2.173 0.040 0.341
-Engineering Personnel 129 15 129 3.171 0.025 5.820 INSERVICE INSPECTION
-Maintenance 8
0 123 0.025 0.000 8.236
-Operations Personnel 4
0 3
0.285 0.000 0.010
-Health Physics 6
0 0
0.118 0.000 0.000
-Supervisory Personnel 2
0 2
0.025 0.000 0.032
-Engineering Personnel 11 1
7 0.382 0.001 0.480 SPECIAL MAINTENANCE***
-Maintenance 21 2
16 1.062 0.122 0.263
-Operations Personnel 0
0 0
0.000 0.000 0.000
-Health Physics 3
0 2
0.092 0.000 0.466
-Supervisory Personnel 3
0 0
0.045 0.000 0.000
-Engineering Personnel 1
0 4
0.018 0.000 0.071 2,