Emergency Plan Implementing Procedure RA-EP-01700, Revision 00, Alert
ML021300427
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/23/2002
From:
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
Download: ML021300427 (18)


Text

J -3<

  • Davis Besse Power Station Transmittal / Receipt Acknowledgement Control Copy Number: 1665 Transmittal Number:

0204-05327 Transmittal Date:

04-23-2002 To:

DOC. CONTROL DESK Mail Stop / Address:

USNRC DIVISION OF EMERGENCY PREPARDNESS WASHINGTON, D.C. 20555 Document holders are responsible for control and maintenance of documents in accordance with the actions specified by this transmittal. Outdated material shall either be removed and destroyed or marked to reflect that it is superseded or voided and is no longer considered controlled.

Note: Destroy Safeguard information by shredding.

File documents in tab order as identified on the Table of Contents Contact Document Control with any questions at (419)-321-7483

Avis Besse Power Station Transmittal / Receipt Acknowledgement TC("' 1 TChI1)

Tw) -

old EPIA PROC new EPIA PROC Control Copy Numb Transmittal Number Transmittal Date:

Sht/Sec Changes C99-1352, EO-1U-2778

/

C99-1352, E01-2778, E02-0701 RA-EP-01700 RA-EP-01700 per: 1665 0204-05327 04-23-2002 Rev Status 0000 APPROVED 0000 APPROVED M.-kp.... r mum

PROCEDURE DEVELOPMENT FORM P=D 7RPf5-1 8 SHEET PROCEDURE ACTIVITY TRACKING NO.

/OF II

.0-0701 SECTION 1 -.IDENTITY PROCEDURE NO. / CURRENT REVISION PROPOSED PROPOSED El NEW (N)

El CANCELLATION (CX)

RA-EP-01700/Revision 00 REVISION NO.

C or E NO.

El REVISION (R)

El INACTIVATION (IN)

El RESTRICTED SUPERSEDES CHANGE (C)

REACTIVATION (RA)

ESTIMATED EXPIRATION N/A E-2 El TEMPORARY APPROVAL (TA) 0 EDITORIAL CORRECTION (E)

(DATE / EVENT)

PROCEDURE TITLE Alert PROCEDURE CLASSIFICATION PAT / PCR NOS. CLOSED OUT OSR

[: QR E N-QR CHANGE TO?

rM YES

[ NQ PC R1-2667 El CONTINUED ACTIVITY

SUMMARY

/ PURPOSE Correct phasing of Step 6.5 to read "Initiate assembly in accordance with RA-EP-02520, Assembly and Accountability". Currently reads "Initiate accountability in with RA-EP-02520..

El CONTINUED SECTION 2 - CONCURRENT EFFECTIVE DOCUMENTS lCONTiNUED DOCUMENT NO.

REVISION DOCUMENT TITLE PAT NO. / CHANGE REQUEST N/A SECTION 3-REVIEW ORGANIZATIONS REQUIRED REQUESTED l[ CONTINUED

[E CONTINUED PROCEDURE PRE DATE QUALIFIED REVIEWER DATE B. W. Cope 2-/*'-d7-N/A SECTION 4 - ATTACHMENTS COMPLETED AND ATTACHED YES N/A YES N/A YES N/A

.[

El VALIDATION CHECKLIST

[

0 10CFR50.59 SCREEN NO.

0 0 5 REVISED CROSS REFERENCES LIST o

0 COMMITMENT VERIFICATION

SUMMARY

5 5 1 OCFR50.59 EVALUATION NO.

0 [1 [] PCRs o

[] REGULATORY APPLICABILITY DETERMINATION 5

0 DOCUMENT REVIEW SHEETS 0

0 OTHER NO.

FINAL QUALIFIED REVIEWER CONCURRENCE DATE N/A SECTION5t'6EMPORARY APPROVAL<

MANAGEMENT SR AEAPROVAL

ýAUTHORITY DATE N/A N/A "SECTION 6-.,CoNCURRENCE/ FINAL APPROVAL PROCEDURE SPONSOR DATE

[:ISRB DATE N/A N/A o MANAGER - NUCLEAR QUALITY ASSESSMENT (QA)

DATE

[I PLANT MANAGER DATE N/A N/A APPROVAL AUTHORITY DATE

_N/A SECTION 7R-ITRAINING PROCEDURE EFFECTITY TRAINING COMPLETE ALTERATION EFFECTIVE DATE IPRCEDURE SP*

-OR DAT ElYES 0 N/A

&.- S.-t

-.. --a-k LDA A

per-*,e 34+

PROCEDURE DEVELOPMENT FORM SHEET PROCEDURE ACTIVITY TRACKING NO.

I OFI1 IZJ fvouD"I I

OF. I I

SECTION 1,- IDENTITY PROCEDURE NO. / CURRENT REVISION PROPOSED PROPOSED El NEW (N)

El CANCELLATION (CX)

RA-EP-01700 REVISION NO.

C or E NO.

[

REVISION (R)

[I INACTIVATION (IN)

(CERESTRI SUPERSEDES

[I CHANGE (C)

El REACTIVATION (RA)

ESTIMATED EXPIRATION E-1 El TEMPORARY APPROVAL (TA) 0 EDITORIAL CORRECTION (E)

(DATE/EVENT)

PROCEDURE TITLE Alert PROCEDURE CLASSIFICATION HAS PROCEDURE BEEN EXEMPTED PAT / PCR NOS. CLOSED OUT M SR El OR El N-QR FROM REGULATORY APPLICABILITY?

CHANGE TO? E-YES 10 NO El YES 0 NO El CONTINUED ACTIVITY

SUMMARY

I PURPOSE

1. Correct titles of Shift Supervisor, Assistant Shift Supervisor, and Shift Manager
2. Step 6.1.1 - Add reason for Alert to announcement.

El CONTINUED SECTION 2-CONCURRENT EFFECTIVE DOCUMENTS EICONTINUED DOCUMENT NO. / REVISION DOCUMENT TITLE PAT NO. / CHANGE REQUEST SECTION 3 - REVIEW ORGANIZATIONS REQUIRED REQUESTED El CONTINUED

[I CONTINUED PROCED

PBEEA, DATE QUALIFIED REVIEWER DATE SECTION 4-ATTACHMENTS COMPLETED AND ATTACHED YES N/A YES N/A YES N/A EO [I VALIDATION CHECKLIST El D 10CFR50.59 SCREEN NO.

[

REVISED CROSS REFERENCES LIST El 0 COMMITMENT VERIFICATION

SUMMARY

El El 10CFR50.59 EVALUATION NO.

Dl PCRs

[1 El REGULATORY APPLICABILITY DETERMINATION Q

El DOCUMENT REVIEW SHEETS Q

Q OTHER NO.

FINAL QUALIFIED REVIEWER CONCURRENCE DATE SECTION 5 -TEMPORARY APPROVAL MANAGEMENT SRO DATE APPROVAL AUTH IR/2 DATE SECTION 6-CONCURRENCE I FINAL APPROVAL SW U

PONSOR DATE

[SRB DATE

[I MANAGER - NUCLEAR QUI"Y ASSESSME10 (QA)

DATE 0l PLANT MANAGER DATE IvA A,114 APPROVAL AUTHORITY DATE SECTION 7-TRAINING I PROCEDURE EFFECTIVITY TRAINING COMPLETE ALTERATION EFF CTIVE DATE PROCEDURE SPONSOR DATE

[IYES 4N/A iz/9

//m/

PROCEDUREo "

'7ACTIVITY TRACKING NO.

SHEET

I SHEET PROCEDURE DEVELOPMENT FORM PROCEDURE ACTIVITY TRACKING NO.

1OF,"',_./4-J1*//',i 99-1352

\\j I

I SECTION I-,

DENTIT.

PROCEDURE NO. / CURRENT REVISION PROPOSED PROPOSED

[l NEW El CANCELLATION RA-EP-01700 ROO REVISION NO.

CHANGE NO.

C REVISION E] INACTIVATION El RESTRICTED SUPERSEDES E CHANGE Q[ REACTIVATION EXPIRES 01 El TEMPORARY APPROVAL (DATE / EVENT)

PROCEDURE TITLE Alert PROCEDURE CLASSIFICATION PAT I PCR NOS. CLOSED OUT Z SR El QR El N-QR 0l CHANGE TO? E) YES 0 NO 0 CONTINUED ACTIVITY

SUMMARY

/ PURPOSE Incorporate changes necessitated by the new CANS El CONTINUED SECTION 2 - CONCUJRRENT EFFECTIVE DOCMENTS S CONTINUED DOCUMENT NO. I REVISION DOCUMENT TITLE PAT NO. I CHANGE REQUEST RA-EP-01600 Unusual Event 99-1549 RA-EP-01800 Site Area Emergency 99-1351 RA-EP-01900 General Emergency 99-1350 SECTION 3 - EVIEW ORGANIZATIONS_________

REQUIRED REQUESTED F1 CONTINUED

[]CONTINUED COMPLETED AND ATTACHED YES N/A YES N/A YES NIAI 1

I* VALIDATION CHECKLIST 9

0 SAFETY REVIEW REVISED CROSS REFERENCES LIST

[] COMMITMENT VERIFICATION

SUMMARY

1 0 DOCUMENT REVIEW SHEETS 0

J PCRs o

C SAP VALUATION NO.

0

[1 OTHER FINA[ *QUALIF EVIEWER ONC RENCE DATE SECTION 5 - TEMPORARY APPROVAL MANAGEMENT SRO DATE APPROVAL AUTHORITY DATE N/A N/A

-SECT'ION 8 - CONCURRENCE IFNALAPPROVAL PROC S*ONSOR DATE MANAGER - BUSINESS SERVICES DATE S.N/A I.TOR-NA DATE 0 SRB A

0 DIRECTOR - E&S DATE 0 PLANT MANAGE NIA 0 DIRECTOR-NSSý DATE ROVA I

N/A I:A_,d

~SECTION 7 - TRAINING JPRbCPEDQl REFFECTIVITY TRAINING COMPLFT ALTERATIOJEFF NCTIVE DATE IPROCEIREP P

PAT r

e 41 ED+

7635-13++*++++

+++ + +*+"-++I+I~*R

  • +m

++++..

YES++++

+,+ [2+

N/........A...........

&j /

I

IAA 6?-

/*L-

ia JUN 1 ID1NTJTY fltdTlJU1fll SECTION 2 - CO'NCUIRRENT EFFECTIVE DOCUMENTS ýCONTIINUED)

DOCUMENT NO. I REVISION DOCUMENT TITLE PAT NO. I CHANGE REQUEST RA-EP-021 10 Emergency Notification 99-1491 SECTiON 3 - REVIEW ORGAN*ZATIONS (CONTIN.UED)

REQUESTED I-iLL I.1 A

ZrtTlrlKl I - lr'ir-MTITV fCONTIMT jr-t-1 REQUIRED

Page 1 of 12 Davis-Besse Nuclear Power Station EMERGENCY PLAN IMPLEMENTING PROCEDURE RA-EP-01700 (Supersedes HS-EP-1700 R3)

ALERT REVISION 00

LL

/

0 Sponsor:

Mngr--

Regla* **tyfi Manager - P66egulatory Affa-irs Date' Date Date Approved by:

Approved by:

Director - Engineering and Services Al lant Manager Al Effective Date:

Procedure Classification:

X Safety Related Quality Related UG 2 0 1996 Non-Quality Related Prepared by:

2 ALERT LIST OF EFFECTIVE PAGES RA-EP-01700 Revision 00 E-2 Page Change No.

2 E-2 3

4 5

E-1 6

E-1 7

E-2 8

9 C-1 10 11 12 Page Page Change No.

Change No.

i

+

11, Change No.

3 RA-EP-01700 Revision 00 ALERT TABLE OF CONTENTS Pule 1.0 PURPOSE.........................................................................................................

4

2.0 REFERENCES

4 3.0 DEFINITIONS.................................................................................................

4 4.0 RESPONSIBILITIES.......................................

5 5.0 INITIATING CONDITIONS...........................................................................

5 6.0 PROCEDURE...................................................................................................

6 7.0 FINAL CONDITIONS.....................................................................................

11 8.0 RECORDS..............................................

11 COMM ITM ENTS.........................................................................................................

12

ti 4

RA-EP-01700 Revision 00 1.0 PURPOSE This procedure outlines the course of action and protective measures required to mitigate an Alert.

2.0 REFERENCES

2.1 Developmental 2.1.1 Davis-Besse Nuclear Power Station Emergency Plan 2.2 Implementation 2.2.1 RA-EP-01500, Emergency Classification 2.2.2 RA-EP-01600, Unusual Event 2.2.3 RA-EP-0 1800, Site Area Emergency 2.2.4 RA-EP-01900, General Emergency 2.2.5 RA-EP-02010, Emergency Management 2.2.6 RA-EP-021 10, Emergency Notification 2.2.7 HS-EP-02240 (RA-EP-02240), Offsite Dose Assessment 2.2.8 RA-EP-02520, Assembly and Accountability 2.2.9 RA-EP-02710, Reentry 2.2.10 RA-EP-02720, Recovery Organization 3.0 DEFINITIONS 3.1 ALERT - Events are in progress or have occurred which involve an actual or potential substantial degradation of the level of safety of DBNPS. Any releases are expected to be limited to small fractions of the EPA Protective Action Guidelines exposure levels.

3.2 TRANSITORY EVENT - An event which is classifiable in accordance with RA-EP-0 1500, Emergency Classification, but becomes a lower - classification or non-classifiable event before being declared.

ti.

5 RA-EP-01700 Revision 00 E-1 4.0 RESPONSIBILITIES 4.1 The Emergency Director shall be responsible for the implementation of this procedure.

4.1.1 The Shift Manager shall become the Emergency Director during activation of the Davis-Besse Emergency Plan and shall be responsible for coordinating the actions of the emergency organization until relieved.

4.1.2 The Unit Supervisor may assume the Emergency Director duties only if the Shift Manager is not in the Control Room, or is incapable of performing those duties.

4.1.3 The Shift Engineer (Shift Technical Advisor) may assume the Emergency Director duties only if neither the Shift Manager nor the Unit Supervisor is in the Control Room and capable of performing those duties.

4.1.4 Upon arrival in the Control Room, the Emergency Assistant Plant Manager or Emergency Plant Manager may relieve the Emergency Director.

4.1.5 The Emergency Plant Manager may assume the Emergency Director duties from the Technical Support Cpnter (TSC) if the TSC and Emergency Control Center (ECC) are activated.

4.1.6 The Emergency Director shall remain in the Control Room until the TSC and ECC have been activated..

5.0 INITIATING CONDITIONS This procedure shall be utilized whenever an Alert has been classified in accordance with RA-EP-01500, Emergency Classification.

LII 6

RA-EP-01700 Revision 00 E-1 NOTE 6.0 The following procedure steps may be performed simultaneously.

6.0 PROCEDURE DATE:

TIME INITIALS The Emergency Director shall direct performance of the following:

CAUTION 6.1

1.

If the Alert is due to a security event, obtain security management concurrence prior to sounding the Station alarm.

2.

If there is potential for an airborne radiological release, consider announcing that there shall be no eating, smoking, or drinking in the area.

6.1 Sound the appropriate Station alarm (fire, access evacuation, and/or initiate emer gency procedures) and make the following announcement over the public address system, TWICE.

6.1.1 Upgrading

"ATTENTION ALL PERSONNEL; ATTEN TION ALL PERSONNEL: AN ALERT HAS BEEN DECLARED. ALL MEMBERS OF THE ONSITE EMERGENCY ORGANIZATION REPORT TO YOUR DESIGNATED EMERGENCY RESPONSE FACILITIES.

ALL NONESSENTIAL PERSONNEL GO TO THE DESIGNATED EMERGENCY ASSEMBLY AREA STAND BY. THE REASON FOR THE ALERT IS:

(STATE REASON)

7 RA-EP-01700 Revision 00 E-2 DATE:

TIME INITIALS 6.1.2 If there is a localized emergency (e.g., fire) announce its type and location and instruct personnel to stand clear of the area.

6.1.3 Downgrading

"ATTENTION ALL PERSONNEL. THE EMERGENCY CONDITION HAS BEEN DOWN GRADED TO AN ALERT.

I REPEAT, THE EMERGENCY CONDITION HAS BEEN DOWNGRADED TO AN ALERT."

6.2 Notify the Emergency Response Organization (ERO) in accordance with RA-EP-021 10, Emergency Notification.

6.3 Notify Ottawa County, Lucas County and the State of Ohio within 15 minutes of any' emergency classification using the*'

Initial Notification Form in accordance'with RA-EP-021 10, Emergency Notification":

6.4 Notify the NRC within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> using the Event Notification Worksheet in accordance with RA-EP-02110, Emergency Notification.,

6.5 Initiate personnel assembly in accordance with RA-EP-02520, Assembly and Accountability.

6.6 Terminate all radwaste releases.

6.7 Ensure the following emergency response.

facilities are activated: (Not applicable if downgrading.)

6.7.1 The Operations Support Center 6.7.2 The Technical Support Center:_

6.7.3 The Emergency Control Center 6.7.4 The Joint Public Information Center

8 RA-EP-01700 Revision 00 DATE:

TIME INITIALS 6.8 Continue dose assessment activities in accordance with RA-EP-02240, Offsite Dose Assessment, with increased emphasis on determining the need for protective actions.

6.9 Make periodic updates to offsite agencies as conditions change, or hourly at a minimum, using the Periodic Update Form in accordance with RA-EP-02 110, Emergency Notification. These updates may be omitted by mutual agreement with the offsite agencies.

6.10 When plant conditions change review RA-EP-01500, Emergency Classification, to determine if the event should be reclassified.

6.10.1 Once an Alert has been declared the event shall NOT be downgraded with out concurrence of the Control Room, the Technical Support Center, and the Emergency Control Center.

6.10.2 If the event is reclassified, then implement the appropriate procedure.

6.11 When the Alert is downgraded make the following notifications in accordance with RA-EP-02 110, Emergency Notification:

6.11.1 Ottawa County, Lucas County, and the State of Ohio using the Initial Notification Form.

6.11.2 The NRC using the Event Notification Worksheet.

6.12 If a Transitory Alert condition has occurred notify Ottawa County, Lucas County, the State of Ohio, and the NRC in accordance with RA-EP-02 110, Emergency Notification.

  • II

9 RA-EP-01700 Revision 00 C-1 DATE:

TIME INITIALS 6.13 The individual assuming the responsibilities of Emergency Director shall complete Emergency Director Turnover Data Sheet.

contained in RA-EP-02010, Emergency Management, using information provided by the Control Room log unit log, and status boards.

6.14 If the emergency situation is mitigated and completely declassified, then perform, the following:

6.14.1 Make this announcement over the public address system:

"ATTENTION ALL PERSONNEL; ATTENTION ALL PERSONNEL: THE EMERGENCY SITUATIQN HAS, BEEN TERMINATED. I REPEAT,-JHE EMERGENCY SITUATION HAS BEEN."..

TERMINATED."

6.14.2 Notify Ottawa County, Lucas County, and the State of Ohio using the Initial, Notification Form in accordan.ce-with RA-EP-02 110, Emergency Notification.

6.14.3 Notify the Nuclear Regulatory.

Commission using the Event Notification.

Worksheet in accordance with RA-EP-02 110, Emergency Notification...

6.14.4 Notify the Emergency Response Organization (ERO) in accordance with-RA-EP-02 110, Emergency Notification.

6.15 Perform reentry actions in accordance with RA-EP-027 10, Reentry.

6.16 Perform recovery actions in accordance with RA-EP-02720, Recovery Organiiation.

1I-

10 RA-EP-01700 Revision 00 DATE:

TIME INITIALS 6.17 Records, other than Safeguards Records, shall be collected and forwarded to the Emergency Preparedness Supervisor who shall submit them to Nuclear Records Management.

Safeguards Records shall be collected and forwarded to the Supervisor - Security Shift.

Section 6.0 completed by:

Date:

Section 6.0 completed by:

Date:

11 RA-EP-01700 Revision 00 7.0 FINAL CONDITIONS 7.1 The emergency condition has been downgraded and actions are being taken in accordance with RA-EP-01600, Unusual Event.

OR 7.2 Emergency conditions no longer exist and actions are being taken in accordance with either RA-EP-02710, Reentry, and/or RA-EP-02720, Recovery'Organization.

OR 7.3 The emergency condition has been upgraded to a higher classification and actions are being taken in accordance with RA-EP-0 1800, Site Area Emergency, or RA-EP-01900, General Emergency.

8.0 RECORDS 8.1 The following quality assurance records are completed by this procedure and shall be listed on the Nuclear Records List, captured, and submitted to Nuclear Records Management in accordance with NG-NA-00 106:

8.1.1 None 8.2 The following non-quality assurance records are completed by this procedure and may be captured and submitted to Nuclear Records Management, in accordance with NG-NA-00106:

8.2.1 RA-EP-0 1700, Alert (when steps have been completed) 8.2.2 Emergency Director Turnover Data Sheet 8.2.3 Initial Notification Form 8.2.4 Periodic Update Form

RA-EP-01700 Revision 00 COMMITMENTS Reference TERMS 0 13532, TERMS 0 13969 TERMS 0 15211, TERMS 0 15212 TERMS 0 13670 TERMS 0 15209 TERMS Q 00785 TERMS Q 03113 Comments Addresses 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notification capability Specifies conditions under which the STA may assume Emergency Director duties Dose Assessment Sounding Station Alarms Activating the ERO Section 6.3, 6.4, 6.9 4.1.3 6.8 6.1 ALL 12 END