ML021290213

From kanterella
Jump to navigation Jump to search

Amendment Regarding Anticipated Transient Without Scram Recirculation Pump Trip Instrumentation Setpoint
ML021290213
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 05/08/2002
From: Vissing G
Office of Nuclear Reactor Regulation
To:
Vissing G
Shared Package
ML021330077 List:
References
TAC MB3153
Download: ML021290213 (2)


Text

JAFNPP TABLE 3.2-7 ATWS RECIRCULATION PUMP TRIP INSTRUMENTATION REQUIREMENTS Minimum Number of Operable Instrument Channels Per Trip System (Notes I & 2) 2 2

Trip Function Reactor Pressure - High Reactor Water Level - Low Low Trig Level Setting

s 1155 psig

> 105.4 in.

above TAF Applicable Modes Run Run Amendment No. 22 7T2 3 7, 26 4,

2 7 3 76a

JAFNPP THIS PAGE INTENTIONALLY BLANK Amendment No. 237, 2 7 3 76c