ML021290192

From kanterella
Jump to navigation Jump to search

Ltr, Upcoming Steam Generator Tube Inservice Inspection (Tac No MB4961)
ML021290192
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/13/2002
From: Wang A
NRC/NRR/DLPM
To: Ridenoure R
Omaha Public Power District
Wang A, NRR/DLPM, 415-1445
References
TAC MB4961
Download: ML021290192 (7)


Text

May 13, 2002 Mr. R. T. Ridenoure Division Manager - Nuclear Operations Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

Post Office Box 550 Fort Calhoun, NE 68023-0550

SUBJECT:

FORT CALHOUN STATION, UNIT NO. 1 - UPCOMING STEAM GENERATOR TUBE INSERVICE INSPECTION (TAC NO. MB4961)

Dear Mr. Ridenoure:

Inservice inspections of steam generator (SG) tubes play a vital role in assuring that adequate structural integrity of the tubes is maintained. As required by the plants technical specifications, reporting requirements range from submitting a special report, within 15 days following completion of each inservice inspection of SG tubes, that identifies the number of tubes plugged and/or repaired; to submitting a special report, within 12 months following completion of the inspection, that provides complete results of the SG tube inservice inspection.

The special report containing the complete results of the inspection shall include the following:

1.

Number and extent of tubes inspected.

2.

Location and percent of wall-thickness penetration for each indication of an imperfection.

3.

Identification of tubes plugged and/or repaired.

A phone conference will be arranged with members of your staff to discuss the ongoing results of the SG tube inspections to be conducted during the upcoming Fort Calhoun Station, Unit 1 refueling outage. We would like to have this phone call after the majority of the tubes have been inspected, but before the SG inspection activities have been completed. The preferable time would be when the SG inspection is approximately 75% complete. Attached is a list of discussion points to facilitate this phone conference.

R. Ridenoure The staff plans to document a brief summary of the conference call as well as any material that you may have provided to the staff in support of the call.

Sincerely,

/RA/

Alan B. Wang, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-285

Enclosure:

List of Discussion Points cc w/encl: See next page

ML021290192 OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC NAME AWang EPeyton SDembek DATE 5/12/02 5/10/02 5/13/02

STEAM GENERATOR TUBE INSPECTION DISCUSSION POINTS PREPARED BY THE OFFICE OF NUCLEAR REACTOR REGULATION OMAHA PUBLIC POWER DISTRICT FORT CALHOUN STATION, UNIT 1 DOCKET NO. 50-285 The following discussion points have been prepared to facilitate the telephone conference to be arranged with the Omaha Public Power District (OPPD/the licensee) to discuss the results of the steam generator (SG) tube inspections to be conducted during the upcoming Fort Calhoun Station, Unit 1 refueling outage.

The staff plans to document a brief summary of the conference call as well as any material that you may have provided to the staff in support of the call.

1.

Discuss whether any primary to secondary leakage existed in this unit prior to shutdown.

2.

Discuss the results of secondary side hydrostatic tests.

3.

For each steam generator, provide a general description of areas examined, including the expansion criteria utilized and type of probe used in each area.

4.

For analyzed eddy current results, describe bobbin indications (those not examined with rotating pancake coil [RPC]) and RPC/Plus Point/Cecco indications. Include the following information in the discussion: location, number, degradation mode, disposition, and voltages/depths/lengths of significant indications.

5.

Describe the repair/plugging plans for the SG tubes that meet the repair/plugging criteria.

6.

Discuss the previous history of SG tube inspection results, including any "look backs" performed.

7.

Discuss, in general, the new inspection findings.

8.

Discuss your use or reliance on the X-probe, if applicable.

9.

Describe in-situ pressure test plans and results, if applicable and available, including tube selection criteria.

10.

Describe tube pull plans and preliminary results, if applicable and available; include tube selection criteria.

11.

Discuss the assessment of tube integrity for the previous operating cycle.

12.

Discuss the assessment of tube integrity for next operating cycle.

13.

Provide the schedule for steam generator related activities during the remainder of the current outage.

14.

Discuss what steps have been taken, or will be taken, in response to the lessons learned from the Indian Point Unit 2 tube failure. In addition, please be prepared to discuss the following:

(a)

Discuss the actions that are taken in response to identifying a new degradation mechanism, (b)

Discuss the actions taken to ensure that data noise levels are acceptable, and (c)

Address data quality issues and the need for criteria to address data quality.

Ft. Calhoun Station, Unit 1 cc:

Winston & Strawn ATTN: James R. Curtiss, Esq.

1400 L Street, N.W.

Washington, DC 20005-3502 Mr. Jack Jensen, Chairman Washington County Board of Supervisors Blair, NE 68008 Mr. Wayne Walker, Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 309 Fort Calhoun, NE 68023 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Ms. Julia Schmitt, Section Administrator Nebraska Health and Human Services Systems Division of Public Health Assurance Consumer Services Section 301 Cententiall Mall, South P. O. Box 95007 Lincoln, Nebraska 68509-5007 Mr. David J. Bannister Manager - Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant Post Office Box 550 Fort Calhoun, NE 68023-0550 Mr. Mark T. Frans Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

Post Office Box 550 Fort Calhoun, NE 68023-0550 Mr. Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health 401 SW 7th Street Suite D Des Moines, IA 50309