Jump to navigation Jump to search
Submittal of Physical Security Plan Revision 23
ML021280460
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 04/30/2002
From: Barrett R
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
IPN-02-036
Download: ML021280460 (2)


Text

S-Entergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

Indian Point Energy Center RO. Box 308 Buchanan, NY 10511 Tel 9147368001 Fax 914 736 8012 Robert J. Barrett Vice President, Operations Indian Point 3 April 30, 2002 IPN-02-036 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-P1 -17 Washington, D.C. 20555-0001

SUBJECT:

Indian Point 3 Nuclear Power Plant Docket No. 50-286 License No. DPR-64 Submittal of Physical Security Plan Revision 23

Dear Sir:

Enclosed is the Physical Security Plan, Revision 23, which is being submitted in accordance with 10 CFR 50.4(b)(4). In accordance with the requirements of 10 CFR 50.54(p), the changes incorporated into this revision were evaluated and determined not to decrease the safeguards effectiveness of the plan. Enclosure 1 provides the changes being submitted as Revision 23 to the Physical Security Plan, including a "Summary of Changes" detailing the changes incorporated. The Physical Security Plan is being revised to reflect changes resulting from the deletion of the administrative separation between Indian Point Unit 2 and Unit 3 because the units are now owned and operated by Entergy. contains SAFEGUARDS INFORMATION and should be controlled pursuant to 10 CFR 73.21. This letter transmits SAFEGUARDS INFORMATION and should be controlled in accordance with 10 CFR 73.21, unless separated from the enclosures.

Please review to verify receipt, sign and return the receipt acknowledgment form provided in. There are no new commitments associated with this letter.

If you have any questions regarding this revision, please call Mr. Patrick J. Asendorf at (914) 736-8922.

Er 7.arret§ Vice President, Operations Indian Point 3 Nuclear Power Plant cc: See next page

Docket No. 50-286 IPN-02-036 Page 2 of 2 Physical Security Plan, Revision 23 Document Receipt Form cc:

U.S. Nuclear Regulatory Commission (w/3 copies)

ATTN: Docket Control Desk Washington, D.C. 20555-0001 Hubert J. Miller (w/2 copies)

Regional Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406-1415