May 7, 2002 APPLICANT: Florida Power and Light Company (FPL)

FACILITIES:

St. Lucie Nuclear Plant, Units 1 and 2

SUBJECT:

PUBLIC EXIT MEETING WITH FLORIDA POWER AND LIGHT COMPANY ON THE SCOPING METHODOLOGY AUDIT FOR ST. LUCIE UNITS 1 AND 2 LICENSE RENEWAL APPLICATION The staff of the Nuclear Regulatory Commission held a public meeting on April 18, 2002, at the Florida Power and Light Company (FPL) Energy Encounter, 6501 South Ocean Drive, Jensen Beach, Florida. The purpose of the meeting was to present the preliminary results of the staffs audit of the scoping and screening methodology used to develop the St. Lucie Units 1 and 2 license renewal application. The list of attendees is attached.

Mr. Richard McIntyre, NRC, summarized the purpose of the audit and the material reviewed.

He identified two requests for additional information and a confirmatory issue. The requests for additional information pertained to the recently issued staff interim guidance on:

1.

Evaluating non-safety-related structures and components located near safety-related components to determine which additional structures or components meet the 10 CFR 54.4(a)(2) license renewal scoping criteria.

2.

Evaluating, in the context of the station blackout rule, what portion of the offsite power system are within the scope of license renewal.

The confirmatory issue pertained to including a statement in the supplemental Updated Final Safety Analysis Report that license renewal activities would conform to 10 CFR Part 50 Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants. Mr. McIntyre concluded that the scoping and screening methodology appeared to be consistent with 10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants.

Prior to issuance, the staff provided a draft of this meeting summary to the applicant for comment.

/RA/

Noel Dudley, Senior Project Manager License Renewal Section License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos. 50-335 and 50-389

Attachment:

As stated cc w/

Attachment:

See next page

APPLICANT: Florida Power and Light Company (FPL)

FACILITIES:

St. Lucie Nuclear Plant, Units 1 and 2

SUBJECT:

PUBLIC EXIT MEETING WITH FLORIDA POWER AND LIGHT COMPANY ON THE SCOPING METHODOLOGY AUDIT FOR ST. LUCIE UNITS 1 AND 2 LICENSE RENEWAL APPLICATION The staff of the Nuclear Regulatory Commission held a public meeting on April 18, 2002, at the Florida Power and Light Company (FPL) Energy Encounter, 6501 South Ocean Drive, Jensen Beach, Florida. The purpose of the meeting was to present the preliminary results of the staffs audit of the scoping and screening methodology used to develop the St. Lucie Units 1 and 2 license renewal application. The list of attendees is attached.

Mr. Richard McIntyre, NRC, summarized the purpose of the audit and the material reviewed.

He identified two requests for additional information and a confirmatory issue. The requests for additional information pertained to the recently issued staff interim guidance on:

3.

Evaluating non-safety-related structures and components located near safety-related components to determine which additional structures or components meet the 10 CFR 54.4(a)(2) license renewal scoping criteria.

4.

Evaluating, in the context of the station blackout rule, what portion of the offsite power system are within the scope of license renewal.

The confirmatory issue pertained to including a statement in the supplemental Updated Final Safety Analysis Report that license renewal activities would conform to 10 CFR Part 50 Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants. Mr. McIntyre concluded that the scoping and screening methodology appeared to be consistent with 10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants.

Prior to issuance, the staff provided a draft of this meeting summary to the applicant for comment.

/RA/

Noel Dudley, Senior Project Manager License Renewal Section License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos. 50-335 and 50-389

Attachment:

As stated cc w/

Attachment:

See next page DISTRIBUTION: See next page Document Name: C:\\ORPCheckout\\FileNET\\ML021280114.wpd

  • See attached sheets for concurrences.

OFFICE PM:RLSB LA SC: RLEP BC:RLEP NAME NDudley*

EHylton*

SHoffman PTKuo DATE 5/ 6/02 5/ 6/2 5/7/02 5/7/02 OFFICIAL RECORD COPY

DISTRIBUTION:

HARD COPY RLEP RF E. Hylton E-MAIL:

PUBLIC J. Johnson W. Borchardt D. Matthews F. Gillespie C. Grimes RidsNrrDe R. Barrett E. Imbro G. Bagchi K. Manoly W. Bateman J. Calvo C. Holden P. Shemanski H. Nieh G. Holahan S. Black B. Boger D. Thatcher G. Galletti C. Li J. Moore R. Weisman M. Mayfield A. Murphy W. McDowell S. Droggitis S. Duraiswamy RLEP Staff R. McIntyre G. Galletti P. Balmain D. McCain

Scoping Methodology Audit Meeting Participants St. Lucie Units 1 and 2 April 18, 2002 NRC Rich McIntyre NRR/DIPM/IQMB Audit Team Leader Greg Galletti NRR/DIPM/IQMB Operations Engineer Peter Balmain NRR/DIPM/IQMB Operations Engineer Thierry Ross RII Senior Resident Inspector Noel Dudley NRR/DRIP/RLEP Sr. Project Manager Florida Power and Light Company Don Jernigan FPL, Site Vice President, St. Lucie Nuclear Plant Steve Hale FPL Jack Hoffman FPL T.L. Patterson FPL T.V. Abbatiello FPL Jim Chrulski FPL Chris Wasik FPL Attachment

Mr. J. A. Stall ST. LUCIE PLANT Florida Power and Light Company cc:

Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company 700 Universe Boulevard P.O. Box 029100 Juno Beach, FL 33408-0420 Senior Resident Inspector St. Lucie Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, Florida 34957-2000 Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 M. S. Ross, Attorney Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Douglas Anderson County Administrator St. Lucie County 2300 Virginia Avenue Fort Pierce, Florida 34982 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. Donald E. Jernigan, Site Vice President St. Lucie Nuclear Plant Florida Power and Light Company 6351 South Ocean Drive Jensen Beach, Florida 34957-2000 Mr. Steve Hale St. Lucie Nuclear Plant Florida Power and Light Company 6351 South Ocean Drive Jensen Beach, Florida 34957-2000 Mr. R. G. West Plant General Manager St. Lucie Nuclear Plant Florida Power and Light Company 6351 South Ocean Drive Jensen Beach, Florida 34957-2000 Mr. T.L. Patterson Licensing Manager St. Lucie Nuclear Plant Florida Power and Light Company 6351 South Ocean Drive Jensen Beach, Florida 34957-2000 Mr. Don Mothena Manager, Nuclear Plant Support Services Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. J. Kammel Radiological Emergency Planning Administrator Department of Public Safety 6000 SE. Tower Drive Stuart, Florida 34997 Mr. Alan P. Nelson Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, DC 20006-3708 APN@NEI.ORG David Lewis Shaw Pittman, LLP 2300 N Street, N.W.

Washington, D.C. 20037