March 2002 Monthly Operating Report for Indian Point 3
ML021230471
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 04/12/2002
From: Barrett R
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
IPN-02-029
Download: ML021230471 (6)


Text

SEntergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

Indian Point Energy Center P.O. Box 308 Buchanan, NY 10511 Tel 914 736 8001 Fax 914 736 8012 Robert J. Barrett Vice President, Operations Indian Point 3 April 12, 2002 IPN-02-029 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-P1-17 Washington, D.C. 20555-0001

Subject:

Indian Point 3 Nuclear Power Plant Docket No. 50-286 License No. DPR-64 Monthly ODeratina Reaort for March 2002

Dear Sir:

The attached monthly operating report, for the month of March 2002, is hereby submitted in accordance with Indian Point 3 Nuclear Power Plant Technical Specification 5.6.4.

Indian Point 3 is making no commitments in this letter.

very trul Vice resident, Operations Indi In Point 3 Nuclear Power Plant cc: See next page

Docket No. 50-286 IPN-02-029 Page 2 of 2 Attachment cc:

Mr. Hubert J. Miller Regional Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406-1415 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point 3 Nuclear Power Plant P.O. Box 337 Buchanan, NY 10511-0337 U.S. Nuclear Regulatory Commission ATTN: Director, Office of Information Resource Management Washington, D.C. 20555 INPO Records Center 700 Galleria Parkway Atlanta, Georgia 30339-5957

OPERATING DATA REPORT DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE NO:

LETTER NO:

50-286 Indian Point 3 4-04-02 T. Orlando (914) 736-8340 IPN-02-029 ATTACHMENT PAGE 1 of 4 OPERATING STATUS Unit Name:

Indian Point No. 3 Nuclear Power Plant Reporting Period:

March 2002 Licensed Thermal Power (MWt):

3025 Nameplate Rating (Gross MWe):

1013 Design Electrical Rating (Net MWe):

965 Maximum Dependable Capacity (Gross MWe):

1000 Maximum Dependable Capacity (Net MWe):

965 If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report Give Reasons:

9.

Power Level to Which Restricted, If Any (Net MWe):

10.

Reasons for Restrictions, If Any:

Hours In Reporting Period Number Of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 744 744 0

744 0

2,247,881 758,735 735,676 100 100 102.5 102.5 0

Yr-to-Date 2160 2160 0

2160 0

6,529,510 2,203,745 2,136,594 100 100 102.5 102.5 0

Cumulative 224,681 139,767.73 0

136,957 0

393,360,450 126,087,208 121,740,819 61.0 61.0 56.8*

56.2 23.7

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

25.

If Shut Down At End Of Report Period. Estimated Date of Startup:

26.

Units In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Weighted Average Forecast

1.
2.
3.
4.
5.
6.
7.

8.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

Achieved

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE NO:

LETTER NO:

50-286 Indian Point 3 4-04-02 T. Orlando (914) 736-8340 IPN-02-029 ATTACHMENT PAGE 2 of 4 MONTH March 2001 AVERAGE DAILY POWER 976 989 989 989 988 989 990 989 989 990 989 989 988 988 989 989 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL (MWe-Net) 990 989 990 990 990 990 989 990 989 990 990 990 990 990 989 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

DAY 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16

DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE NO.

LETTER NO:

50-286 Indian Point 3 4-04-02 T. Orlando (914) 736-8340 IPN-02-029 ATTACHMENT PAGE 3 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH March 2002 1

F: Forced S: Scheduled 2

3 Reason:

Method:

A-Equipment 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain)

E-Operator Training & Licensee Examination F-Administrative G-Operational Error H-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG - 0161) 5 Exhibit 1 Same Source METHOD OF NO.

DATE TYPE DURATION REASON SHUTTING LICENSEE EVENT SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO 1

(HOURS) 2 DOWN REPORT #

CODE CODE PREVENT RECURRENCE REACTOR 3 4

5 None

DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE NO.:

LETTER NO.

50-286 Indian Point 3 4-04-02 T. Orlando (914) 736-8340 IPN-02-029 ATTACHMENT PAGE 4 of 4

SUMMARY

OF OPERATING EXPERIENCE March 2002 The Indian Point Unit No. 3 Nuclear Power Plant was synchronized to the bus for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a gross electrical energy generation of 758,735 MWH.

On March 1, at 1702 hours0.0197 days <br />0.473 hours <br />0.00281 weeks <br />6.47611e-4 months <br />, a planned load reduction commenced in order to perform surveillance test 3PT-Q107, "Main Turbine Stop and Control Valve Exercise and Vibration Monitoring Test." The unit was stabilized at 940 MWE at 1756 hours0.0203 days <br />0.488 hours <br />0.0029 weeks <br />6.68158e-4 months <br />. Following successful completion of the test, a load escalation commenced at 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br />, and the unit achieved full load at 2210 hours0.0256 days <br />0.614 hours <br />0.00365 weeks <br />8.40905e-4 months <br />.