ML021220536

From kanterella
Jump to navigation Jump to search
Emergency Planning Implementing Procedures, Revision 10
ML021220536
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 04/11/2002
From:
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML021220536 (16)


Text

S~En terigy Indian Point 3 AP-18.1 Attachment 1 Revision 10 Page 1 I CONTROLLED DOCUMENT TRANSMITTAL FORM TO: DISTRIBUTION DATE: 4/11/2002 TRANSMITTAL NO: 26763 FROM:IP3 DOCUMENT CONTROL GROUP EXTENSION: 2036 The Document(s) identified below are forwarded for use. In accordance with AP-18.2, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s). Sign and return the receipt acknowledgement below within fifteen (15) working days.

AFFECTED DOCUMENT: EMERGENCY PLAN DISTRIBUTION DOC# REV # TITLE INSTRUCTIONS

        • SEE ATTACHED INSTRUCTIONS ****
                      • PLEASE NOTE EFFECTIVE DATE***********

RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S)

IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S).

O SIGNATURE DATE CC#

NAME (PRINT) SGAUEDT C

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

Indian Point 3 NPP

~En tffgy P.O. Box 308 Buchanan, NY 10511 Tel 914 736 8000 TO: NRC CONTROL COPY NO.: U &e b-t Ix t FROM: EMERGENCY PLANNING DATE:04/9/02

SUBJECT:

Emergency Planning Implementing Procedures The enclosed revisions are for your controlled copy of the IP-3 Emergency Plan. Please discard old sheets, insert new sheets, initial/date this transmittal and return it to the IP-3 DOCUMENTS DEPARTMENT. If you have any questions regarding these changes, call Emergency Planning (x8318/271-7418).

Thank you.

Volume III - Emergency Planning Implementing Procedures OLD NEW Table of Contents 3/02 Table of Contents 4/02 IP-1050 Rev. 26 3/02 IP-1050 Rev. 27 4/02 I acknowledge the receipt of these revisions to the IP-3 Emergency Plan.

(Signature) (Date)

15-APR-02 Page: 15 DISTRIBUTION CONTROL LIST Ocument Name: EMER PLAN CC-NAME NAME DEPT LOCATION 0 ELLMERS J (TRANS. ONLY) APPRAISAL & COMPLIANCE WPO/14A 1 MONTANARELLO M ADMINISTRATION 45-3-B 2 TRAINING MANAGER TRAINING #48 3 RES DEPARTMENT MANAGER RES DEPARTMENT 45-4-A 4 REFERENCE LIBRARY RECORDS(TRNG BLDG) #48 8 PUBLIC RELATIONS MANAGER PUB. REL. (AP-ONLY) 46-2-C 9 JOINT NEWS CENTER EMERGENCY PLANNING EOF 10 SHIFT MGR. (LUB-001-GEN) OPERATIONS IP3 11 CONTROL ROOM & MASTER OPS(3PT-D001-D006 ONLY) IP3 12 COMPUTER SERVICES MANAGER COMPUTER SERVICES 45-2-E 13 I&C MANAGER I&C 45-2-A 14 EOF E-PLAN EOF 15 EOF E-PLAN EOF 16 AEOF/A.GROSJEAN E-PLAN (EOP'S ONLY) WPO-12D 17 AEOF/A.GROSJEAN E-PLAN (EOP'S ONLY) WPO-12D 19 NUC ENGINEERING LIBRARY WPO DOCUMENT CONTROL WPO/7A 22 RESIDENT INSPECTOR US NRC 45-2-B

. 23 MCNAMARA N 24 MCNAMARA N 25 DOCUMENT CONTROL DESK NRC NRC NRC OFFSITE OFFSITE OFFSITE 28 AVRAKOTOS N J A FITZPATRICK OFFSITE 29 E-PLAN ENGINEER E-PLAN EOF 30 E-PLAN COORDINATOR E-PLAN EOF 31 BARANSKI J ST. EMERG. MGMT. OFFICE OFFSITE 32 MURPHY L - VOLUME #1 ONLY DISASTER & EMERGENCY WESTCHESTR 33 LONGO, N.-VOLUME #1 ONLY EMERGENCY SERVICES ROCKLAND 34 GREENE D - VOLUME #1 ONLY DISASTER & CIVIL DEFENSE ORANGE 35 RAMPOLLA M-VOLUME #1 ONLY OFFICE OF EMERG MANAGE PUTNAM 37 HP WATCH OFFICE LAURA EAGENS 45-4-A 38 SECURITY COMMAND POST SECURITY #44A 39 SECONDARY ALARM (SAS) SECURITY 44A 40 SECURITY MANAGER SECURITY 44-A 41 SIMULATOR TRAINING 48-2-A 42 CONTROL ROOM & MASTER OPS(3PT-DO01-D006 ONLY) IP3 106 SIMULATOR INSTRUCT AREA TRG/3PT-DO01-D006 ONLY) #48 107 QA MANAGER QA TRL #2A 128 O.R.G. DEPT. MANAGER O.R.G. DEPARTMENT 46-2-B 158 SYSTEM ENGINEERING MGR. SYSTEM ENGINEERING 45-3-H 211 D&A MANAGER DESIGN ENGINEERING TRL-#31-A 308 HUGHES J IP-1011 ONLY E-PLAN CON ED 309 HUGHES J IP-1011 ONLY E-PLAN CON ED 319 C.STELLATO NRQ-OPS / TRAINING #48 354 L.GRANT LRQ-OPS / TRAINING #48 TRAINING - OPS OFFICE 48-2-A

. 357 D. PITT 376 EOF 424 OPS-INSTR (LL'S 1 COPY)

E-PLAN J. CHIUSANO/TRAINING EOF

  1. 48 510 L.GRANT LRQ-OPS / TRAINING #48 511 L.GRANT LRQ-OPS / TRAINING #48 512 C.STELLATO NRQ-OPS / TRAINING #48

VOLUME III TABLE OF CONTENTS 04/02 ENTERGY NUCLEAR NORTHEAST INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN - VOLUME III IMPLEMENTING PROCEDURES TABLE OF CONTENTS PROCEDURE TITLE REV. DATE PROCEDURE #

Dose Assessment Determining the Magnitude of Release 17 03/00 IP-1001 Post-Accident Monitoring of Noble Gas 4 02/99 IP-1002 Concentration in Plant Vent Obtaining Meteorological Data 18 03/00 IP-1003 IP-1004 Midas Computer System 16 03/00 Environmental Monitoring IP-1011 Offsite Monitoring/Site Perimeter Surveys 24 05/99 IP-1012 Emergency Airborne Activity Determination 4 02/99 Post-Accident Environmental Sampling and 7 12/98 IP-1015 Counting Protective Actions Protective Action Recommendations for 13 12/98 IP-1017 the Offsite Population Emergency Use of Potassium Iodide (KI) 9 11/97 IP-1019 Personnel Injury IP-1021 Radiological Medical Emergency 25 06/98 IP-1023 Use and Set Up of the IP3 Personnel Decon VOID N/A Suite Damage Assessment Repair and Corrective Action Teams 12 12/98 IP-1025 IP-1027 Emergency Personnel Exposure 12 12/97 Core Damage Assessment 9 06/98 IP-1028 Notification and Communication IP-1038 Offsite Emergency Notifications 26 09/01 IP-1039 Emergency Response Data System (ERDS) 4 02/01 Activation and Testing i

VOLUME III TABLE OF CONTENTS 04/02 ENTERGY NUCLEAR NORTHEAST INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN - VOLUME III IMPLEMENTING PROCEDURES TABLE OF CONTENTS PROCEDURE # PROCEDURE TITLE REV. DATE Emergency Response Facilities IP-1040 Habitability of the Emergency Response 16 11/97 Facilities and Assembly Areas IP-1041 Personnel Monitoring for EOF, TSC, OSC VOID N/A and Control Room Personnel Accountability and Evacuation IP-1050 Accountability 27 04/02 IP-1053 Evacuation of Site 13 03/02 IP-1054 Search and Rescue Teams 10 12/97 Non-Radiological Emergencies IP-1052 Hazardous Waste Emergency 7 07/97 IP-1055 Fire Emergency Response 14 03/00 IP-1056 Directing Fire Fighting Personnel in VOID N/A Controlled Area IP-1057 Natural Phenomena Emergency 8 10/01 IP-1058 Earthquake Emergency VOID N/A IP-1059 Air Raid Alert 7 05/01 H.P. Release Surveys and Decontamination IP-1060 Personnel Radiological Check and 11 02/98 Decontamination IP-1063 Vehicle/Equipment Radiological Check 11 11/97 and Decontamination Emergency Equipment and Maintenance IP-1070 Periodic Inventory of Emergency Plan 31 02/01 Equipment IP-1076 Roster Notification Methods 25 09/01 IP-1080 Conduct of Emergency Exercises and Drills VOID N/A IP-1085 Maintenance of Emergency Preparedness VOID N/A at IP-3 ii

a E-Etergy EMERGENCY PLAN PROCEDURES REV. 27 PROCEDURE NO. IP-1050 TITLE: ACCOUNTABILITY THIS PROCEDURE IS TSR THIS PROCEDURE IS NOT TSR Io*

0 qt*o PROCEDURE USE IS REFERENCE

Volume III IP-1050 Rev. 27 ACCOUNTABILITY TABLE OF CONTENTS SECTION TITLE PAGE 1.0 Purpose 1 2.0 Responsibilities 1 3.0 References 1 4.0 Procedure 2 5.0 Attachments 5.1 IP-3 Assembly Areas and Evacuation Routes 5.2 Lead Accountability Officer (LAO) 5.3 Emergency Response Facility Accountability 5.4 Radiological Meter Checklist

Volume III IP-1050 Rev. 27 Page 1 of 2 IP-1050 ACCOUNTABILITY 1.0 PURPOSE account for all Indian This procedure describes actions to be taken to Point Energy Center (IPEC) personnel during an emergency.

2.0 RESPONSIBILITIES Alarm is 2.1 To initiate the accountability process, the Site Assembly General Control Room (CR) at the Site Area Emergency, sounded by the (ED).

Emergency Director Emergency, or at the discretion of the Accountability 2.2 The Security Shift Supervisor is designated Lead for accounting for all IPEC Officer (LAO) and is responsible personnel.

for 2.3 In accordance with this procedure, Clerks are responsible Area and/or performing accountability in their assigned Assembly Emergency Response Facility (ERF).

personnel, 2.4 Security is responsible for accounting for Security owner control area dispatching a security officer to canvas the IP3 and the Indian to ensure all personnel are reporting to their ERF's off-hours.

during Point Training Center (IPTC), unlocking the IPTC IPTC point of contact Security will also serve as the if (Accountability Officer) with the LAO during off-hours, available.

been activated, 2.5 When an ALERT has been declared or when ERFs have specific who do not have non-essential personnel (personnel are responsible emergency response duties at IPEC) and Contractors (EEC).

to the IPTC or the Energy Education Center for reporting (ERO) 2.6 Upon arrival to the ERF, Emergency Response Organization to the ERF personnel are responsible for carding-in and/or reporting Clerk.

3.0 REFERENCES

3.1 IP-1053, "Evacuation of Site" Telephone List" 3.2 Volume II, Appendix C, "Emergency Response Facility

Volume III IP-1050 Rev. 27 Page 2 of 2 4.0 PROCEDURE NOTE The steps in this procedure are not required to be performed in sequence.

4.1 At the ALERT Emergency or when the ERFs have been activated, REPORT to your ERF, the IPTC or EEC.

NOTE Repair and Corrective Action Teams and Nuclear Plant Operators (NPOs) performing critical work in the field, and the NPO in the Primary Auxiliary Building (PAB) are not required to report to their ERF. Instead, they shall contact their ERF and report their location. For telephone numbers, see Volume II, Appendix C, " Emergency Response Facility Telephone List".

4.2 Accountability will be initiated at the Site Area or General Emergency or at the discretion of the Emergency Director (ED).

4.3 USE the appropriate attachment, listed below, for specific Assembly Area/ERFs accountability functions.

A. Attachment 5.2, "Lead Accountability Officer (LAO)"

B. Attachment 5.3, "Emergency Response Facility Accountability" C. Attachment 5.4, "Radiological Meter Checklist" 5.0 ATTACHMENTS 5.1 Unit 3 Assembly Areas and Evacuation Routes 1K 5.2 Lead Accountability Officer (LAO) 5.3 Emergency Response Facility Accountability 5.4 Radiological Meter Checklist END OF TEXT

Volume III IP-1050 Rev. 27 Page I of 1 ATTACHMENT 5.1 MAINEfi GATIE 1AtICE ttrPA EINIft w

IFACUIIYI

<D LEGENDBASES SECURITY BLDG. GUARD tlOUJSE ETC.

SOUTHERLY ROUTE (WIND FROM SOUTH) () PARKING AREAS

  1. - PnOPERTY LItaE DIVISION CON EDINYPA

-- EXISTING FENCItKG

-NORTIIERLY EVACUATION nI E


SOUtrIERLY EVACUATION RTE.

Volume III IP-1050 Rev. 27 Page 1 of 2 ATTACHMENT 5.2 LEAD ACCOUNTABILITY OFFICER (LAO)

NOTE II, Appendix C.

Assembly Area telephone numbers are listed in Volume or as soon as

1. PERFORM the following actions at an ALERT Emergency accountability is initiated:

IF card readers

a. ENSURE the accountability card readers are activated.

are inoperable, THEN request the Visitor List from Security.

b. VERIFY the phones and fax machines are functional.
c. SET UP and TEST radiological equipment in accordance with Attachment 5.4, "Radiological Meter Checklist".

(P.A.) System.

d. LISTEN for announcements over the Public Address THEN call
e. IF the P.A. cannot be heard and/or equipment is inoperable,telephone the OSC Manager for repair (see Volume II, Appendix C for numbers.)

the Protected

f. ENSURE personnel staffing the EOF are permitted to exit Area without delay.
2. When accountability is called for, commence performing accountability as follows:

NOTE are the Assembly The Indian Point Training Center and Energy Education Center Security Officer to personnel. During off-hours, send a Areas for non-essential LAO, if available.

the Training Building to be the point of contact with the and Energy Education During on-hours, contact one of the IPTC Hallway Monitors C for telephone Center Assembly Area Coordinators (see Volume II, Appendix numbers).

area

a. DISPATCH a Security vehicle to canvas the Unit 3 owner-controlled the IPTC or to ensure all individuals have gone to and check buildings their ERF and ensure Site access is secured.

either physical

b. When card reader activity level has decreased (noted by no later than 15 minutes observation or card reader indication), but for Assembly Alarm, GENERATE an 'unaccounted after sounding of the Site personnel list', from the POSA computer, sorted by Unit 2 personnel or badge numbers and FAX to the Unit 2 Emergency Plant Manager, Unit 2 2 OSC Manager) during on hours or the designee, (via the Unit communications Shift Manager (Control Room) during off hours. Establish for to ensure fax was received. Then GENERATE a Unit 3 'unaccounted personnel list'.

Volume III IP-1050 Rev. 27 Page 2 of 2 ATTACHMENT 5.2 LEAD ACCOUNTABILITY OFFICER (LAO) (CON'T).

NOTE Once Unit 3 has generated the missing persons list for Unit 3 and the Unit 2 Emergency Plant Manager during on hours or the Unit 2 Shift Manager (Control Room) during off hours declares that Unit 2 has generated the missing persons list for Unit 2, accountability is COMPLETE. This list must be generated within 30 minutes of the initiation of Accountability.

c. Request a fax of the Unit 2 missing persons list, if required.
d. NOTIFY the Unit 3 ED (via the Unit 3 EOF Onsite Radiological Communicator) or the Unit 2 Emergency Plant Manager (via the Unit 2 OSC Manager) during on hours or the Unit 2 Shift Manager (Control Room) during off hours if there are any persons not accounted for in the protected area. See Volume II, Appendix C for the telephone numbers.
3. Attempt to locate the missing persons by:

"* calling the Unit 2 OSC Manager to make PA announcements

"* using the PA system

"* calling the Unit 3 OSC/TSC/Control Room

4. INFORM the following when/if the missing persons have been found. (see Volume II, Appendix C for telephone numbers.)

"* ED (via EOF Onsite Radiological Communicator) or

"* Unit 2 Emergency Plant Manager (EPM) (via the Unit 2 OSC Manager) during on hours or the Unit 2 Shift Manager (Control Room) during off hours.

5. UPDATE the IPTC Hallway Monitor and Energy Education Center Assembly Area Coordinator of the plant status and radiological conditions (see Volume II, Appendix C for telephone numbers.)
6. If radiation levels in the Assembly Area are greater than 10 mR/hr, then CONTACT the H.P. Team Leader in the OSC for direction (see Volume II, Appendix C for telephone numbers.)
7. REVIEW IP-1053, "Evacuation of Site".

Volume III IP-1050 Rev. 27 Page 1 of 2 ATTACHMENT 5.3 EMERGENCY RESPONSE FACILITY ACCOUNTABILITY NOTE Clerk.

The steps in this Attachment are typically completed by the Facility at an ALERT The following Emergency Response Facilities (ERFs) are staffed or higher. These ERFs are the Assembly Areas for the personnel listed Emergency Operations The Control Room (CR), Technical Support Center (TSC) and below.

are equipped with accountability card readers.

Support Center (OSC)

CR - All Watch and non-watch Operations personnel, report to the CR and card into the accountability card reader.

If you experience problems while carding in, THEN REPORT to the Facility Clerk.

and TSC (2nd Floor Administration Building) - All TSC designated trained personnel report to the TSC, card into the accountability card reader.

If you experience problems while carding in, THEN REPORT to the Facility Clerk.

OSC (2nd Floor Administration Building) - All OSC designated and trained personnel report to the OSC, card into the accountabi.lity card reader.

If you experience problems while carding in, THEN REPORT to the Facility Clerk.

EOF (Service Center) - All EOF designated and trained personnel report to the EOF and sign in.

ALERT

1. PERFORM the following actions in the CR, TSC and OSC at the Emergency or as soon as accountability is initiated:
a. ENSURE operability of the card reader.
1) SWIPE Security badge through slot at bottom of the reader.
2) WATCH top red light change from red to green and then back to red.
b. VERIFY the accountability phone is functional.
2. PERFORM accountability as follows:
a. If necessary, IDENTIFY yourself as the Accountability Officer/Clerk.
b. ENSURE all personnel entering the ERF card into the accountability card reader (CR, TSC and OSC only).

Volume III IP-1050 Rev. 27 Page 2 of 2 ATTACHMENT 5.3 EMERGENCY RESPONSE FACILITY ACCOUNTABILITY (CON'T.)

c. ACCOUNT for personnel. CONTACT supervisors to account for their personnel.
d. NOTIFY LAO of personnel on teams (if any) dispatched during the accountability process.

Call the LAO if anyone experiences card reader problems. (CR, TSC e.

and OSC only).

f. CALL the LAO if you hear a page for someone you know is in your area (CR, TSC and OSC only).

access point.

g. CONTROL Assembly Area/ERF accountability at a single as
3. IF the card readers are inoperable, CONDUCT manual accountability follows:

NOTE 20 Manual accountability should be completed as soon as possible/within minutes of the call for accountability.

Identify who is missing by using the Accountability List (located a.

in your position book).

b. When manual accountability is completed, NOTIFY the LAO.

Volume III IP-1050 Rev. 27 Page 1 of 2 "ATTACHMENT 5.4 RADIOLOGICAL METER CHECKLIST CALL THE LAO IF ANY READING IS GREATER THAN 10 mR/HR. ON ANY METER.

(See Volume II, Appendix C for telephone numbers)

THE FIXED LOCATION LUDLUM 300 G.M. METER

1. VERIFY operability of the Ludlum-300 meter by observing illumination of the green light on the front panel. This light may flash to red periodically but this is normal.
2. IF meter ALARMS, THEN:
a. UNLOCK cabinet (combination is 8-5-6-8).
b. PUSH the lock in and then pull out to unlock.
c. OPEN cabinet.
d. PUSH button marked RESET.
e. CALL the LAO for any readings greater than 10 mR/hr.

THE FRISKER (RM-14)

1. VERIFY operability of the frisker as follows:
a. PLUG into standard wall outlet or use internal battery.
b. MOVE switch clockwise to BATT.
c. CHECK that the needle moves into the BATT OK range. IF it does not, THEN CALL the LAO.
d. MOVE switch to the Xl position.
e. ENSURE the following:
1) TURN UP volume control all the way right (clockwise).
2) PLACE switch marked RESPONSE in the SLOW position.
3) VERIFY operability by holding the probe next to the source (on side of frisker) until the alarm sounds. The alarm should sound when the frisker reads approximately 250. IF this is not the case, THEN lower the frisker alarm setpoint (on back of frisker.)
4) NOTE background reading.
5) PLACE the probe on its side next to the frisker.
2. IF radiological conditions exist, THEN do the following:
a. INSTRUCT all personnel to frisk prior to entering Assembly Area.
1) FRISK hands first before picking up probe.
2) START at head and work down the body keeping the probe about a 1/2" away from body.
3) MOVE probe slowly (about 3"/second).

Volume III IP-1050 Rev. 27 Page 2 of 2 ATTACHMENT 5.4 RADIOLOGICAL METER CHECKLIST

4) FRISK bottom of feet last.
b. CONTACT LAO concerning contaminated personnel who show count rates greater than 100 cpm above background.

PORTABLE SURVEY INSTRUMENT (E-520/E-530 GEIGER COUNTER)

1. CHECK operability of the meter as follows:
a. MOVE the switch clockwise to the position marked BATT.
b. CHECK that the needle moves into the BATT OK range on the bottom scale.

IF it does not, THEN CALL the LAO.

2. SURVEY Assembly Area as follows:
a. MOVE the switch to the Xl position if battery is good.
b. WALK around the area while watching the meter.
c. READ the top scale (0-20 mR/hr).
d. IF any reading is GREATER THAN 10 mR/hr., THEN CALL the LAO.