ML021190398

From kanterella
Jump to navigation Jump to search
March 2002 Monthly Operating Report for Salem, Unit 2
ML021190398
Person / Time
Site: Salem PSEG icon.png
Issue date: 04/12/2002
From: Garchow D
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N02-0158
Download: ML021190398 (4)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 APR 1 2 2002 LR-N02-0158 0 PSEG Nu clear LL C U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 2 DOCKET NO. 50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 2 Technical Specifications, the operating statistics for March 2002 are being forwarded.

Sincerely, D. Ff.Gar how Vice President - Operations RAR Attachments C Distribution 95-2168 REV. 7/99

INDEX NUMBER SECTION OF PAGES Operating Data Report...............................................................................

1 Monthly Operating Summary......................................................................

1

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-311 Salem 2 04/12/02 F. Todd (856) 339-1316 Reporting Period March 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH) 1131 1092 Month Year-to-date Cumulative 744 2054 114767 744 2032 111370 0

0 0

837548 2235970 113057511 UNIT SHUTDOWNS NO.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS)

(1)

SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)

(1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

I

DOCKET NO.: 50-311 UNIT: Salem 2 DATE: 04/12/02 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience

  • Salem 2 began the month at 100% power.
  • Salem 2 operated for the entire month with no significant power reductions.
  • At the end of the month, Salem 2 completed 75 days of continuous operation.