ML021190370

From kanterella
Jump to navigation Jump to search
2001 Annual Environmental Operating Report (Nonradiological)
ML021190370
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/25/2002
From: Dennis Morey
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NEL-02-0098
Download: ML021190370 (4)


Text

Southern Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 SOUTHERNA COMPANY Energy to Serve Your World April 25, 2002 Docket Nos.:

NEL-02-0098 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 - 0001 Joseph M. Farley Nuclear Plant 2001 Annual Environmental Operating Report (Nonradiological)

Ladies and Gentlemen:

In accordance with subsection 5.4.1 of the Joseph M. Farley Nuclear Plant Environmental Protection Plan (Units 1 & 2), Appendix B to Facility Operating License Nos. NPF-2 and NPF-8, please find enclosed the Annual Environmental Operating Report for 2001.

If you have any questions, please advise.

Respectfully submitted, Dave Morey ABG/sl: 2001 Annual Environmental Operation Report.doc

Attachment:

1. Annual Environmental Operating Report for 2001 (Nonradiological) 0_'

Dave Morey Vice President Farley Project

Page 2 U. S. Nuclear Regulatory Commission cc:

Southern Nuclear Operating Company Mr. D. E. Grissette, General Manager - Farley U. S. Nuclear Regulatory Commission, Washington, D. C.

Mr. F. Rinaldi, Licensing Project Manager - Farley U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley

ATTACHMENT 1 SOUTHERN NUCLEAR OPERATING COMPANY JOSEPH M. FARLEY NUCLEAR PLANT - UNITS 1 AND 2 NRC DOCKET NOS. 50-348 AND 50-364 FACILITY OPERATING LICENSE NOS. NPF-2 AND NPF-8 ANNUAL ENVIRONMENTAL OPERATING REPORT FOR 2001 (NONRADIOLOGICAL)

JOSEPH M. FARLEY NUCLEAR PLANT - UNITS 1 AND 2 ANNUAL ENVIRONMENTAL OPERATING REPORT FOR 2001 (NONRADIOLOGICAL)

INTRODUCTION In accordance with Subsection 5.4.1 of the Joseph M. Farley Nuclear Plant Environmental Protection Plan, Appendix B to Facility Operating License Nos. NPF-2 and NPF-8, this report is submitted summarizing implementation of the Environmental Protection Plan for calendar year 2001.

REPORTING REQUIREMENTS A.

Summaries and Analyses of Results of Environmental Protection Activities Required by Subsection 4.2 of the Environmental Protection Plan (EPP) for the Reporting Period

1. Aerial Remote Sensing - Aerial Remote Sensing is no longer required.
2. Herbicide Application - There is no reporting requirement associated with this condition.
3. Land Management - There is no reporting requirement associated with this condition.

B.

Comparison of the 2001 Monitoring Activities with Preoperational Studies, Operational Controls, and Previous Non-Radiological Monitoring Reports These comparisons were not required because no nonradiological environmental monitoring programs were conducted during the reporting period beyond those performed in accordance with NPDES Permit No. AL0024619.

C.

Assessment of the Observed Impacts of Plant Operation on the Environment There were no significant adverse environmental impacts associated with plant operation during 2001.

D.

EPP Noncompliance and Corrective Actions There were no EPP noncompliances during 2001.

E.

Changes in Station Design or Operation, Tests, or Experiments Made in Accordance with EPP Section 3.1 Which Involved a Potentially Significant Unreviewed Environmental Question There were no changes in station design or operation, tests, or experiments in 2001 which involved a potentially significant unreviewed environmental question.

F.

Nonroutine Reports Submitted in Accordance with EPP Section 5.4.2 There were no nonroutine reports submitted in 2001.