EPRI Report TR-113594, Resolution of GL 96-06 Waterhammer Issues, Volumes 1 & 2
ML021150171
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/25/2002
From: Moroney B
NRC/NRR/DLPM
To: Stall J
Florida Power & Light Co
Moroney B, NRR/DLPM, 415-3974
Shared Package
ML021150198 List:
References
GL-96-006, TR-113594
Download: ML021150171 (3)


Text

April 25, 2002 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420

SUBJECT:

EPRI REPORT TR-113594, RESOLUTION OF GENERIC LETTER 96-06 WATERHAMMER ISSUES, VOLUMES 1 AND 2

Dear Mr. Stall:

Generic Letter (GL) 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions, dated September 30, 1996, requested that licensees evaluate (among other things) waterhammer and two-phase flow concerns associated with containment air cooler cooling water systems. Your remaining actions to fully address these concerns for the St. Lucie Plant, Units 1 and 2, were deferred pending U. S. Nuclear Regulatory Commission (NRC) review and approval of the Electric Power Research Institute (EPRI) Report TR-113594, Resolution of Generic Letter 96-06 Waterhammer Issues, Volumes 1 and 2. The purpose of this letter is to inform you that we have completed our review, and we have determined that use of EPRI Report TR-113594 for evaluating the GL 96-06 waterhammer issues is acceptable to the extent specified and within the limitations delineated in the report and NRC safety evaluation. We request that you complete your actions to address GL 96-06 and submit the information referred to in Section 3.3 of the NRC safety evaluation by July 30, 2002. Please contact us to make alternate arrangements if you are unable to meet this schedule. A copy of our April 3, 2002, acceptance letter to EPRI, which includes the NRC safety evaluation, is enclosed for your information.

Sincerely,

/RA/

Brendan T. Moroney, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-335 and 50-389

Enclosure:

NRC ltr to EPRI, 4/3/02 cc w/enclosures: See next page

Letter ML021150171 Package ML021150198 Enclosure ML020940132 OFFICE PDII-2/PM PDII-2/LA PDII-2/SC NAME BMoroney BClayton TKoshy DATE 04/23/02 04/23/02 04/24/02

Mr. J. A. Stall ST. LUCIE PLANT Florida Power and Light Company cc:

Senior Resident Inspector St. Lucie Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, Florida 34957 Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 M. S. Ross, Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Douglas Anderson County Administrator St. Lucie County 2300 Virginia Avenue Fort Pierce, Florida 34982 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Mr. Donald E. Jernigan, Site Vice President St. Lucie Nuclear Plant 6501 South Ocean Drive Jensen Beach, Florida 34957 Mr. R. G. West Plant General Manager St. Lucie Nuclear Plant 6501 South Ocean Drive Jensen Beach, Florida 34957 Mr. T. L. Patterson Licensing Manager St. Lucie Nuclear Plant 6501 South Ocean Drive Jensen Beach, Florida 34957 Mr. Don Mothena Manager, Nuclear Plant Support Services Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. J. Kammel Radiological Emergency Planning Administrator Department of Public Safety 6000 SE. Tower Drive Stuart, Florida 34997