Electric Power Research Institute (EPRI) Report TR-113594, Resolution of Generic Letter 96-06 Waterhammer Issues, Volumes 1 and 2
ML021150154
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 04/25/2002
From: John Lamb
NRC/NRR/DLPM/LPD3
To: Warner M
Nuclear Management Co
References
TAC MB96824 GL-96-006, TR-113594, Vol 1, TR-113594, Vol 2
Download: ML021150154 (4)


Text

April 25, 2002 Mr. Mark Warner Site Vice President Kewaunee and Point Beach Nuclear Plants Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

ELECTRIC POWER RESEARCH INSTITUTE (EPRI) REPORT TR-113594, RESOLUTION OF GENERIC LETTER 96-06 WATERHAMMER ISSUES, VOLUMES 1 AND 2 (TAC NO. M96824)

Dear Mr. Warner:

Generic Letter (GL) 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions, dated September 30, 1996, requested that licensees evaluate (among other things) waterhammer and two-phase flow concerns associated with containment air cooler cooling water systems. Your remaining actions to fully address these concerns were deferred pending Nuclear Regulatory Commission (NRC) review and approval of EPRI Report TR-113594, Resolution of Generic Letter 96-06 Waterhammer Issues, Volumes 1 and 2. The purpose of this letter is to inform you that we have completed our review, and we have determined that use of EPRI Report TR-113594 for evaluating the GL 96-06 waterhammer issues is acceptable to the extent specified and within the limitations delineated in the report and NRC safety evaluation. We request that you complete your actions to address GL 96-06 and submit the information referred to in Section 3.3 of the NRC safety evaluation by July 30, 2002.

Please contact us to make alternate arrangements if you are unable to meet this schedule. A copy of our April 3, 2002, acceptance letter to EPRI, which includes the NRC safety evaluation, is enclosed for your information.

Sincerely,

/RA/

John G. Lamb, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-305

Enclosure:

Safety Evaluation cc w/encl: See next page

April 25, 2002 Mr. Mark Warner Site Vice President Kewaunee and Point Beach Nuclear Plants Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

ELECTRIC POWER RESEARCH INSTITUTE (EPRI) REPORT TR-113594, RESOLUTION OF GENERIC LETTER 96-06 WATERHAMMER ISSUES, VOLUMES 1 AND 2 (TAC NO. M96824)

Dear Mr. Warner:

Generic Letter (GL) 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions, dated September 30, 1996, requested that licensees evaluate (among other things) waterhammer and two-phase flow concerns associated with containment air cooler cooling water systems. Your remaining actions to fully address these concerns were deferred pending Nuclear Regulatory Commission (NRC) review and approval of EPRI Report TR-113594, Resolution of Generic Letter 96-06 Waterhammer Issues, Volumes 1 and 2. The purpose of this letter is to inform you that we have completed our review, and we have determined that use of EPRI Report TR-113594 for evaluating the GL 96-06 waterhammer issues is acceptable to the extent specified and within the limitations delineated in the report and NRC safety evaluation. We request that you complete your actions to address GL 96-06 and submit the information referred to in Section 3.3 of the NRC safety evaluation by July 30, 2002.

Please contact us to make alternate arrangements if you are unable to meet this schedule. A copy of our April 3, 2002, acceptance letter to EPRI, which includes the NRC safety evaluation, is enclosed for your information.

Sincerely,

/RA/

John G. Lamb, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-305

Enclosure:

Safety Evaluation cc w/encl: See next page DISTRIBUTION:

PUBLIC PDIII-1 Reading JLamb THarris OGC ACRS JTatum RLanksbury, RIII ADAMS Accession no.: ML021150154 OFFICE PDIII-1/PM PDIII-1/LA PDIII-1/SC NAME JLamb THarris LRaghavan DATE 04/25/02 04/25/02 04/25/02 OFFICIAL RECORD COPY

Kewaunee Nuclear Power Plant cc:

Foley & Lardner Nuclear Asset Manager ATTN: Bradley D. Jackson Wisconsin Public Service Corporation One South Pinckney Street 600 N. Adams Street P.O. Box 1497 Green Bay, WI 54307-9002 Madison, WI 53701-1497 Plant Manager Chairman Kewaunee Nuclear Power Plant Town of Carlton Nuclear Management Company, LLC Route 1 North 490, Highway 42 Kewaunee, WI 54216 Kewaunee, WI 54216-9511 Mr. Gerald Novickis, Chairman Kewaunee County Board Kewaunee County Courthouse 613 Dodge Street Kewaunee, WI 54216 Attorney General 114 East, State Capitol Madison, WI 53702 U.S. Nuclear Regulatory Commission Resident Inspectors Office Route #1, Box 999 Kewaunee, WI 54216 Regional Administrator - Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4531 James D. Loock, Chief Engineer Public Service Commission of Wisconsin 610 N. Whitney Way Madison, WI 53707-7854 Mr. Roy A. Anderson Executive Vice President and Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016