March 2002 Monthly Operating Report for Limerick Units 1 & 2
ML021140308
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 04/15/2002
From: Braun R
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002
Download: ML021140308 (7)


Text

Exelon Nuclear Limerick Generating Station P.O. Box 2300 Pottstown, PA 19464 www.exeloncorp.com Nuclear T.S. 6.9.1.6 April 15, 2002 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555 Limerick Generating Station, Unit 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353

Subject:

Limerick Generating Station Monthly Operating Report For Units 1 and 2 Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of March 2002 forwarded pursuant to Technical Specification 6.9.1.6 and the guidance of GL 97

02.

If you have any questions or require additional information, please do not hesitate to contact us.

Sincerely, Robert C. Braun Plant Manager Attachments cc:

H. J. Miller, Administrator, Region I, USNRC A. L. Burritt, LGS USNRC Senior Resident Inspector S~Exelon.

ýýPq

Docket No. 50-352 Attachment to Monthly Operating Report for March 2002 Limerick Generating Station Unit 1 March 1 through March 31, 2002 Narrative Summary of Operatinq Experience Unit 1 began the month of March 2002 at 86% of rated thermal power (RTP) in end-of cycle coastdown.

Throughout the month, unless specified below, when the unit operated at less than 100% RTP, it was due to end-of-cycle coastdown, 1 R09 refuel outage, or post 1 R09 power ascension.

On March 4th at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />, reactor power was reduced in preparation for the 1R09 refuel outage. At 1249 hours0.0145 days <br />0.347 hours <br />0.00207 weeks <br />4.752445e-4 months <br />, the turbine was manually tripped due to high vibration during 1R09 shutdown. At 1503 hours0.0174 days <br />0.418 hours <br />0.00249 weeks <br />5.718915e-4 months <br />, the reactor was manually scrammed, from 24%

RTP to begin refueling outage 1 R09.

On March 19 th at 1734 hours0.0201 days <br />0.482 hours <br />0.00287 weeks <br />6.59787e-4 months <br />, reactor criticality was achieved.

On March 21st at 1838 hours0.0213 days <br />0.511 hours <br />0.00304 weeks <br />6.99359e-4 months <br />, the main generator was synchronized to the grid at 18%

RTP. At 1948 hours0.0225 days <br />0.541 hours <br />0.00322 weeks <br />7.41214e-4 months <br />, the main generator was tripped for voltage regulator testing. At 2147 hours0.0248 days <br />0.596 hours <br />0.00355 weeks <br />8.169335e-4 months <br />, the main generator was again synchronized to the grid at 18% RTP.

On March 2 3 th at 0912 hours0.0106 days <br />0.253 hours <br />0.00151 weeks <br />3.47016e-4 months <br />, during power ascension, reactor power was reduced from 62% to 30% RTP to support maintenance to the 1C condensate pump. On March 25 h at 0337 hoLrs, power ascension was reestablished.

On March 2 7 th at 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br />, reactor power was restored to 100% RTP.

Unit 1 ended the month of March 2002 at 100% RTP.

I1.

Challenges to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of March. There have been no challenges to the Main Steam Safety Relief Valves year to-date.

OPERATING DATA REPORT DOCKET NO.

50-352 DATE APRIL 15,2002 COMPLETED BY G. J. LEE TELEPHONE (610) 718-3707 OPERATING STATUS UN IT NA M E:

R E P O R T IN G PE R IO D :

DESIGN ELECTRICAL RATING (NET MWE):

MAXIMUM DEPENDABLE CAPACITY (NET MWE):

THIS MONTH NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON-LINE UNIT RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 381.5 328.2 0.0 272,088 YR-TO-DATE 1,797.5 1,744.2 0.0 1,811,977 LIMERICK UNIT 1 MARCH 2002 1 1 3 4......

1134 CUMULATIVE 123,352.7 121,408.3 0.0 124,293,976

UNIT SHUTDOWNS REPORT MONTH DOCKET NO.

50-352 UNIT LIMERICK UNIT 1 DATE APRIL 15, 2002 COMPLETED BY G. J. LEE MARCH 2002 TELEPHONE (610) 718-3707 GENERATOR OFF LINE DATE TYPE DURATION REASON METHOD OF SHUTTING NO.

(YYMMDD)

(1)

(HOURS)

(2)

DOWN REACTOR (3)

CORRECTIVE ACTION/COMMENTS 1

020304 5

415.8 C

2 1 R09 Refuel Outage (2)

Reason A -- Equipment Failure (Explain)

B -- Maintenance or Test C -- Refueling D -- Regulatory Restriction E -- Operational Training & License Examination F -- Administrative G -- Operational Error (Explain)

H -- Other (Explain)

(3)

Method 1 -- Manual 2 -- Manual Trip/Scram 3 -- Automatic Trip/Scram 4 -- Continuation 5 -- Other (Explain)

(1)

Type F -- Forced S -- Scheduled

Docket No. 50-353 Attachment to Monthly Operating Report for March 2002 Limerick Generating Station Unit 2 March 1 through March 31, 2002 Narrative Summary of Operatingq Experience Unit 2 began the month of March 2002 at 100% of rated thermal power (RTP).

On March 2 41h at 0129 hours0.00149 days <br />0.0358 hours <br />2.132936e-4 weeks <br />4.90845e-5 months <br />, reactor power was reduced to 78% RTP to cleanout the 2C condenser water box. At 0543 hours0.00628 days <br />0.151 hours <br />8.978175e-4 weeks <br />2.066115e-4 months <br />, reactor power was restored to 100% RTP.

Unit 2 ended the month of March 2002 at 100% of RTP.

Challenges to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of March. There have been no challenges to the Main Steam Safety Relief Valves year-to-date.

OPERATING DATA REPORT DOCKET NO.

50-353 DATE APRIL15,2002 COMPLETED BY G. J. LEE TELEPHONE (610) 718-3707 OPERATING STATUS UNIT NAME:

REPORTING PERIOD:

DESIGN ELECTRICAL RATING (NET.MWE).-.

MAXIMUM DEPENDABLE CAPACITY (NET MWE):

THIS MONTH NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON-LINE UNIT RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 744.0 744.0 0.0 870,259 YR-TO-DATE 2,160.0 2,160.0 0.0 2,536,195

__LIM E.RICK..UNIT 2.

MARC.H-2.00.2.

1134 S.........................................

CUMULATIVE 99,593.0 97,922.9 0.0 104,160,919

UNIT SHUTDOWNS REPORT MONTH DOCKET NO.

50-353 UNIT LIMERICK UNIT 2 DATE APRIL 15, 2002 COMPLETED BY G. J. LEE MARCH 2002 TELEPHONE (610) 718-3707 GENERATOR OFF LINE DATE TYPE DURATION REASON METHOD OF SHUTTING NO.

(YYMMDD)

(1)

(HOURS)

(2)

DOWN REACTOR (3)

CORRECTIVE ACTION/COMMENTS (2)

Reason A - Equipment Failure (Explain)

B -- Maintenance or Test C -- Refueling D -- Regulatory Restriction E -- Operational Training & License Examination F -- Administrative G -- Operational Error (Explain)

H -- Other (Explain)

(3)

Method 1 -- Manual 2 -- Manual Trip/Scram 3 -- Automatic Trip/Scram 4 -- Continuation 5 -- Other (Explain)

(1)

Type F -- Forced S -- Scheduled