March 2002 Monthly Operating Report for Vogtle Electric Generating Plant Units 1 & 2
ML021130484
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/11/2002
From: Beasley J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LCV-1593-C
Download: ML021130484 (7)


Text

J. Barnie Beasley, Jr., P.E.

Southern Nuclear Vice President Operating Company. Inc.

Vogtle Project 40 Inverness Center Parkway P.. Box 1295 Birmingham, Alabama 35201 Tel 205.992.7110 Fax 205.992.0403 SOUTHERNWN...

April 11, 2002 COMPANY Energy to Serve Your World S LCV-1593-C Docket Nos.

50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - MARCH 2002 Enclosed are the March 2002 monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.

Sincerely, JBB/JLL Enclosures El-VEGP Unit 1 Monthly Operating Report - March 2002 E2-VEGP Unit 2 Monthly Operating Report - March 2002 cc:

Southern Nuclear Operating Company Mr. M. Sheibani SNC Document Management U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. R. R. Assa, Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle I

ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR MARCH 2002 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page El-i UNIT SHUTDOWNS and NARRATIVE REPORT Page E1-2

UNIT SHUTDOWNS Reporting Period:

Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-424 VEGP UNIT 1 April 1, 2002 Andrew R. Cato (706) 826-3823 March - 2002 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No.

Date S: Scheduled (Hours)

Reason (1)

Down (2)

Comments 2002-01 3/6/02 S

622.5 C

1 See Below (1) REASON:

(2) METHOD:

A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative
2. Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain)
3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/CORRECTIVE ACTIONICOMMENTS:

EVENT:

2002-01 CAUSE:

Scheduled Refueling Outage CORRECTIVE ACTION:

Cooldown to 110 deg. F, vessel disassembly, fuel off load, mid-loop maintenance, re-load in core, reassemble vessel, fill and vent reactor vessel, and complete prerequisites for mode changes.

CRITICAL PATH WAS:

Vessel disassembly, fuel off load, mid-loop work, fuel load and vessel reassembly, Turbine Rotor replacement, and Main Generator rewind.

NARRATIVE REPORT El-2 March 01, 2002 00:00 Unit 1 at 97.7% power in coastdown with no operating problems.

March 05, 2002 08:37 Unit 1 at 97% power with ramp down for refueling outage beginning.

March 06, 2002 01:31 Unit 1 Main Turbine tripped at 10.5% power per Unit Operating Procedure.

March 06, 2002 01:37 Unit 1 entered Mode 2.

March 06, 2002 01:43 Unit 1 entered Mode 3.

March 06, 2002 15:13 Unit 1 entered Mode 4.

March 06, 2002 20:10 Unit 1 entered Mode 5.

March 13, 2002 12:40 Unit 1 entered Mode 6. Reactor Head detensioned.

March 16, 2002 21:19 Unit 1 is defueled.

March 28, 2002 14:49 Unit 1 entered Mode 6. First fuel assembly in core.

March 31, 2002 23:59 Unit 1 in Mode 6. Reactor fuel load complete and preparing for Mode 5 entry.

1. Reporting Period:
2. Design Electrical Rating (Net MWe):
3. Maximum Dependable Capacity (Net MWe):
4. Number Of Hours Reactor Was Critical:
5. Hours Generator On Line:
6. Unit Reserve Shutdown Hours:
7. Net Electrical Energy Generated (MWHe):

50-424 VEGP UNIT 1 April 1, 2002 Andrew R. Cato (706) 826-3823 March - 2002 1169 1148 This Month 121.5 121.5 0.0 125,937 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES E1-1 OPERATING DATA REPORT Operatina Status Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

Year To Date 1537.5 1537.5 0.0 1,804,012 Cumulative 116,147.0 114,690.1 0.0 128,250,078 Date Tag No.

Event Description N/A N/A N/A

ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR MARCH 2002 TABLE OF CONTENTS OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2

OPERATING DATA REPORT 50-425 VEGP UNIT 2 April 1, 2002 Andrew R. Cato (706) 826-3823 Operating Status

1. Reporting Period:
2. Design Electrical Rating (Net MWe):
3. Maximum Dependable Capacity (Net MWe):
4. Number Of Hours Reactor Was Critical:
5. Hours Generator On Line:
6. Unit Reserve Shutdown Hours:
7. Net Electrical Energy Generated (MWHe):

March-2002 1169 1149 This Month 744.0 744.0 0.0 877,657 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES E2-1 Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

Year To Date 2160.0 2160.0 0.0 2,561,711 Cumulative 103,213.8 102,400.7 0.0 115,354,177 Date Tag No.

Event Description N/A N/A N/A

UNIT SHUTDOWNS Reporting Period:

Docket No.:

Unit Name:

Date:

Completed By:

Telephone:

50-425 VEGP UNIT 2 April 1, 2002 Andrew R. Cato (706) 826-3823 March - 2002 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No.

Date S: Scheduled (Hours)

Reason (1)

Down (2)

Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:

(2) METHOD:

A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative
2. Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain)
3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSEICORRECTIVE ACTIONICOMMENTS:

EVENT:

CAUSE:

CORRECTIVE ACTION:

CRITICAL PATH WAS:

NARRATIVE REPORT March 01, 2002 00:00 Unit 2 at 100% power with no significant operating problems.

March 31, 2002 23:59 Unit 2 at 100% power with no significant operating problems.

E2-2