Text
FENOC FirstEnergy Nuclear Opeatng Company April 11, 2002 PY-CEIiNRR-263 IL United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the March 2002 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours,*
Gregory A. Dunn Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector Perry Nuclear Power Plant 10 Center Road PO. Box 97 Perry, Ohio 44081 Tlýýq
OPERATING DATA REPORT UNIT:
Perry DATE:
4/2/02
- 1.
Docket: 50-440
- 2.
Unit Name:
Perry Nuclear Power Plant
- 3.
Reporting Period: March 2002
- 4.
Utility
Contact:
T. Phelps
- 5.
Telephone: 440-280-7660
- 6.
Design Electrical Rating (Net MWe):
1260*
- 7.
Maximum Dependable Capacity (Net MWe):
1235**
This Month Yr-to-Date Cumulative
- 8.
Hours Reactor was Critical 744.0 2160.0 98,745.2
- 9.
Hours Generator On-Line 744.0 2160.0 96,233.0
- 10.
Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 11.
Net Electrical Energy (MWeH) 939,038.0 2,656,678.0 109,257,080.0 The New Design Electrical Rating is based on the 105% uprate which was completed April of 2001.
The new MDC was effective April 1, 2001.
"* *A new Design Electrical Rating is based on new net generation definitions 0
- The new MDC is 1235 MWe Page 1
UNIT SHUTDOWNS REPORT MONTH - MARCH 2002 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 04/02/02 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1
Hours 2
3
SUMMARY
- The Perry Plant remained on line the entire month.
- 1. TYPE:
F: Forced S: Scheduled
- 2. REASON:
A - Equipment Failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &
License Examination F -Administrative G - Operational Error (explain)
H - Other (explain)
- 3. METHOD:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2