April 29, 2002 Mr. Michael R. Kansler Senior Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
ELECTRIC POWER RESEARCH INSTITUTE (EPRI) REPORT TR-113594, RESOLUTION OF GENERIC LETTER 96-06 WATERHAMMER ISSUES, VOLUMES 1 AND 2 - INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 (TAC NOS. M96822 AND M96823)
Dear Mr. Kansler:
In Generic Letter (GL) 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions, dated September 30, 1996, the U.S. Nuclear Regulatory Commission (NRC) requested that licensees evaluate the susceptibility of (1) containment air cooler cooling water systems waterhammer and two-phase flow conditions during postulated accident conditions and (2) piping systems that penetrate containment to overpressurization from the thermal expansion of fluid.
In a letter dated January 28, 1997, as supplemented on September 15, 1998, and September 12, 2000, Consolidated Edison Company of New York, Inc. (Con Edison, the former licensee), in part, provided its assessment for the waterhammer and two-phase flow issues for Indian Point Nuclear Generating Unit No. 2 (IP2). Similarly, in a letter dated January 28, 1997, as supplemented on March 3 and October 14, 1997, and October 23, 1998, the New York Power Authority (NYPA, the former licensee) provided its response for Indian Point Nuclear Generating Unit No. 3 (IP3). In these letters, Con Edison and NYPA stated their participation in an industry initiative to address the waterhammer concerns and deferred the remaining actions to fully address these concerns pending NRC review and approval of EPRI Report TR-113594, Resolution of Generic Letter 96-06 Waterhammer Issues, Volumes 1 and 2, dated December 2000.
The NRC staff has completed its review of EPRI Report TR-113594 and has determined that the use of the information in the report for evaluating the GL 96-06 waterhammer issues is acceptable to the extent specified and with the limitations delineated in the EPRI Report and the NRC safety evaluation (SE) of the report. Therefore, you are now requested to complete your actions to address GL 96-06 at IP2 and 3 and to submit by July 30, 2002, the supplemental information referenced in Section 3.3 of the NRC SE. If you are unable to meet this schedule,
M. Kansler you should contact us to make alternate arrangements. A copy of the April 3, 2002, NRC acceptance letter to EPRI, which includes the NRC SE, is enclosed for your information.
If you have any questions, please call me at (301) 415-1457.
Sincerely,
/RA/
Patrick D. Milano, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosure:
As stated cc w/encl: See next page
M. Kansler you should contact us to make alternate arrangements. A copy of the April 3, 2002, NRC acceptance letter to EPRI, which includes the NRC SE, is enclosed for your information.
If you have any questions, please call me at (301) 415-1457.
Sincerely,
/RA/
Patrick D. Milano, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosure:
As stated cc w/encl: See next page DISTRIBUTION:
PUBLIC PDI-1 R/F R. Laufer P. Milano J. Tatum B. Wetzel S. Little B. Platchek, RGN I OGC ACRS Package: ML021230013 ACCESSION NO.: ML021090199
Enclosure:
ML021190358 OFFICE PDI-1/PM PDI-1/LA PDI-1/SC NAME PMilano SLittle RLaufer DATE 4/29/02 4/29/02 4/29/02 OFFICIAL RECORD COPY
Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
Mr. Jerry Yelverton Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213 Mr. Fred Dacimo Vice President Operations Entergy Nuclear Operations, Inc.
Indian Point Nuclear Generating Units 1 & 2 295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Robert J. Barrett Vice President - Operations Entergy Nuclear Operations, Inc.
Indian Point Nuclear Generating Unit 3 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308 Mr. Dan Pace Vice President Engineering Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. James Knubel Vice President Operations Support Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Lawrence G. Temple General Manager Operations Entergy Nuclear Operations, Inc.
Indian Point Nuclear Generating Unit 2 295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Joseph DeRoy General Manager Operations Entergy Nuclear Operations, Inc.
Indian Point Nuclear Generating Unit 3 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308 Mr. John Kelly Director of Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene Fiason Manager, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John McCann Manager, Nuclear Safety and Licensing Indian Point Nuclear Generating Unit 2 Entergy Nuclear Operations, Inc.
295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Harry P. Salmon, Jr.
Director of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John Donnelly Licensing Manager Entergy Nuclear Operations, Inc.
Indian Point Nuclear Generating Unit 3 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308
Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
Mr. Thomas Walsh Secretary - NFSC Entergy Nuclear Operations, Inc.
Indian Point Nuclear Generating Unit 2 295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector, Indian Point 2 U. S. Nuclear Regulatory Commission 295 Boradway, Suite 1 P.O. Box 38 Buchanan, NY 10511-0038 Resident Inspectors Office, Indian Point 3 U.S. Nuclear Regulatory Commission 295 Broadway, Suite 3 P.O. Box 337 Buchanan, NY 10511-0337 Mr. John M. Fulton Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.
639 Loyola Avenue Mail Stop: L-ENT-15E New Orleans, LA 70113 Mr. William M. Flynn, President New York State Energy, Research, and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399 Mr. J. Spath, Program Director New York State Energy, Research, and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399 Mr. Paul Eddy Electric Division New York State Department of Public Service 3 Empire State Plaza, 10th Floor Albany, NY 12223 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Ronald Schwartz SRC Consultant 64 Walnut Drive Spring Lake Heights, NJ 07762 Mr. Ronald J. Toole SRC Consultant Toole Insight 605 West Horner Street Ebensburg, PA 15931 Mr. Charles W. Hehl SRC Consultant Charles Hehl, Inc.
1486 Matthew Lane Pottstown, PA 19465 Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. Ray Albanese Executive Chair Four County Nuclear Safety Committee Westchester County Fire Training Center 4 Dana Road Valhalla, NY 10592
Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
Alex Matthiessen Executive Director Riverkeeper, Inc.
25 Wing & Wing Garrison, NY 10524 Paul Leventhal The Nuclear Control Institute 1000 Connecticut Avenue NW Suite 410 Washington, DC, 20036 Karl Copeland Pace Environmental Litigation Clinic 78 No. Broadway White Plains, NY 10603 Jim Riccio Greenpeace 702 H Street, NW Suite 300 Washington, DC 20001