ML021090170

From kanterella
Jump to navigation Jump to search
Public Mtg Point Beach to Discuss Preliminary Red Finding Concerning the Potential Common Mode Failure of Auxiliary Feedwater
ML021090170
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/18/2002
From: Caniano R
Division of Reactor Safety III
To:
Nuclear Management Co
References
EA-02-031
Download: ML021090170 (3)


Text

April 18, 2002 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee:

Nuclear Management Company, LLC Name of Facility:

Point Beach Nuclear Plant EA No:

EA-02-031 Docket Nos:

50-266; 50-301 Date and Time of Meeting:

Monday, April 29, 2002 9:00 a.m. - 12:00 p.m. (CDT) 10:00 a.m. - 1:00 p.m. (EDT)

Location of Meeting:

U. S. Nuclear Regulatory Commission Region III 801 Warrenville Road Lisle, IL 60532-4351 Video Conference Location: U. S. Nuclear Regulatory Commission Room O-3B4, One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Purpose of Meeting:

To discuss the preliminary Red finding concerning the potential common mode failure of auxiliary feedwater at the Point Beach Nuclear Plant. The finding involved inadequate procedural guidance for addressing loss of instrument air to the auxiliary feedwater pump recirculation valves. NRC inspection findings are evaluated with a four step assessment of their safety significance, ranging from Green for a finding of minor significance, through White and Yellow to Red, for a finding of high safety significance.

Notice of Significant Licensee Meeting NRC Attendees:

M. Johnson, Chief, Probabilistic Safety Assessment Branch, NRR C. Carpenter, Chief, Inspection Program Branch, NRR J. Dyer, Regional Administrator J. Caldwell, Deputy Regional Administrator J. Grobe, Director, Division of Reactor Safety G. Grant, Director, Division of Reactor Projects J. Jacobson, Chief, Mechanical Engineering Branch R. Langstaff, Reactor Inspector, Mechanical Engineering Branch Others as designated Licensee Attendees:

Roy Anderson, Chief Nuclear Officer John Paul Cowan, Senior Vice President - Operations Mark Warner, Site Vice President, Kewaunee and Point Beach Nuclear Plants Others as designated NOTE:

Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Ron Langstaff at (630) 829-9747 by COB April 26, 2002.

/RA by Roy Caniano Acting For/

Approved by:

John A. Grobe, Director Division of Reactor Safety

Notice of Significant Licensee Meeting Distribution:

F. Congel, Director, Office of Enforcement J. Dixon-Herrity, Office of Enforcement D. Dambly, Assistant General Counsel for Material Litigation and Enforcement, OGC B. W. Sheron, Associate Director for Projects Licensing and Technical Review, NRR J. Zwolinski, Director, Division of Licensing and Project Management, NRR M. Banerjee, NRR G. Tracy, Chief, Division of Inspection Program Management, IOLB, NRR H. Nieh, Region III Coordinator, OEDO S. Bajwa, Project Directorate, Division of Licensing and Project Management, NRR B. Wetzel, Project Manager, Project Directorate, Division of Licensing and Project Management, NRR D. Spaulding, Acting Project Manager, Project Directorate, Division of Licensing and Project Management, NRR G. E. Grant, Director, Division of Reactor Projects, RIII S. A. Reynolds, Deputy Director, Division of Reactor Projects, RIII J. A. Grobe, Director, Division of Reactor Safety, RIII R. J. Caniano, Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief P. Krohn, SRI, Point Beach DRS Branch Chiefs (RNG, DEH, JMJ3, WJS2)

B. Clayton, Enforcement/Investigations Officer, RIII R. M. Lickus, State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2; VTM)

J. Kweiser, ORA P. Buckley, ORA OEMAIL OEWEB