EPRI Report TR - 113594, Resolution of Generic Letter 96-06 Waterhammer Issues, Volumes 1 and 2 - R. E. Ginna Nuclear Power Plant
ML021090162
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/26/2002
From: Clark R
NRC/NRR/DLPM
To: Mecredy R
Rochester Gas & Electric Corp
Clark R, NRR/DLPM, 415-2297
Shared Package
ML021190311 List:
References
GL-96-006, TAC M96814, TR-113594
Download: ML021090162 (4)


Text

April 26, 2002 Dr. Robert C. Mecredy Vice President, Nuclear Operations Rochester Gas and Electric Corporation 89 East Avenue Rochester, NY 14649

SUBJECT:

ELECTRIC POWER RESEARCH INSTITUTE (EPRI) REPORT TR-113594, RESOLUTION OF GENERIC LETTER 96-06 WATERHAMMER ISSUES, VOLUMES 1 AND 2 - R. E. GINNA NUCLEAR POWER PLANT (TAC NO.

M96814)

Dear Dr. Mecredy:

Generic Letter (GL) 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions, dated September 30, 1996, requested that licensees evaluate (among other things) waterhammer and two-phase flow concerns associated with containment air cooler cooling water systems. Your remaining actions to fully address these concerns were deferred pending Nuclear Regulatory Commission (NRC) review and approval of EPRI Report TR-113594, Resolution of Generic Letter 96-06 Waterhammer Issues, Volumes 1 and 2.

The purpose of this letter is to inform you that we have completed our review, and we have determined that use of EPRI Report TR-113594 for evaluating GL 96-06 waterhammer issues is acceptable to the extent specified and within the limitations delineated in the report and NRC safety evaluation (SE). We request that you complete your actions to address GL 96-06 and submit the information referred to in Section 3.3 of the NRC SE by July 30, 2002. Please contact us to make alternate arrangements if you are unable to meet this schedule. A copy of our April 3, 2002, acceptance letter to EPRI, which includes the NRC SE, is enclosed for your information.

If you have any questions, please call me at (301) 415-2297.

Sincerely,

/RA/

Robert Clark, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-244

Enclosure:

As stated cc w/encl: See next page

April 26, 2002 Dr. Robert C. Mecredy Vice President, Nuclear Operations Rochester Gas and Electric Corporation 89 East Avenue Rochester, NY 14649

SUBJECT:

ELECTRIC POWER RESEARCH INSTITUTE (EPRI) REPORT TR-113594, RESOLUTION OF GENERIC LETTER 96-06 WATERHAMMER ISSUES, VOLUMES 1 AND 2 - R. E. GINNA NUCLEAR POWER PLANT (TAC NO.

M96814)

Dear Dr. Mecredy:

Generic Letter (GL) 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions, dated September 30, 1996, requested that licensees evaluate (among other things) waterhammer and two-phase flow concerns associated with containment air cooler cooling water systems. Your remaining actions to fully address these concerns were deferred pending Nuclear Regulatory Commission (NRC) review and approval of EPRI Report TR-113594, Resolution of Generic Letter 96-06 Waterhammer Issues, Volumes 1 and 2.

The purpose of this letter is to inform you that we have completed our review, and we have determined that use of EPRI Report TR-113594 for evaluating GL 96-06 waterhammer issues is acceptable to the extent specified and within the limitations delineated in the report and NRC safety evaluation (SE). We request that you complete your actions to address GL 96-06 and submit the information referred to in Section 3.3 of the NRC SE by July 30, 2002. Please contact us to make alternate arrangements if you are unable to meet this schedule. A copy of our April 3, 2002, acceptance letter to EPRI, which includes the NRC SE, is enclosed for your information.

If you have any questions, please call me at (301) 415-2297.

Sincerely,

/RA/

Robert Clark, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-244

Enclosure:

As stated cc w/encl: See next page DISTRIBUTION:

PUBLIC SLittle OGC PDI-1 R/F RLaufer ACRS RClark BPlatchek, RGN I JTatum Package: ML021190311 ACCESSION NO.: ML021090162

Enclosure:

ML021160038 OFFICE PDI-1/PM PDI-1/LA PDI-1/SC NAME RClark SLittle RLaufer DATE 4/26/022 4/25/02 4/26/02 OFFICIAL RECORD COPY

R.E. Ginna Nuclear Power Plant cc:

Christopher Welch, Sr. Resident Inspector R.E. Ginna Plant U.S. Nuclear Regulatory Commission 1503 Lake Road Ontario, NY 14519 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. William M. Flynn, President New York State Energy, Research, and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Daniel F. Stenger Ballard Spahr Andrews & Ingersoll, LLP 601 13th Street, N.W., Suite 1000 South Washington, DC 20005 Ms. Thelma Wideman, Director Wayne County Emergency Management Office Wayne County Emergency Operations Center 7336 Route 31 Lyons, NY 14489 Ms. Mary Louise Meisenzahl Administrator, Monroe County Office of Emergency Preparedness 111 West Falls Road, Room 11 Rochester, NY 14620 Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza, 10th Floor Albany, NY 12223