May 13, 2002 Dr. Gerald E. Tripard, Director Nuclear Radiation Center Washington State University Pullman, WA 99164-1300
SUBJECT:
INITIAL EXAMINATION REPORT NO. 50-027/OL-02-01
Dear Dr. Tripard:
During the week of April 01, 2002, the NRC administered examinations to an employee of your facility who had applied for a license to operate your Washington State University Reactor. The examination was conducted in accordance with NUREG-1478, "Non-Power Reactor Operator Licensing Examiner Standards," Revision 1.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/NRC/ADAMS/indesx.html. The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. Should you have any questions concerning this examination, please contact Patrick Isaac at 301-415-1019.
Sincerely,
/RA/
Patrick M. Madden, Section Chief Research and Test Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No.50-027
Enclosures:
1.
Initial Examination Report No. 50-027/OL-02-01 2.
Examination and answer key cc w/enclosures:
Please see next page
Washington State University Docket No. 50-27 cc:
Dr. Howard Miles Chair, Reactor Safeguards Committee, Nuclear Radiation Center Washington State University P.O. Box 641300 Pullman, WA 99164 - 1300 Stephanie Sharp Reactor Supervisor, Nuclear Radiation Center Washington State University P.O. Box 641300 Pullman, WA 99164 - 1300 Dr. Len Porter Director, Radiation Safety Office Washington State University P.O. Box 641302 Pullman, WA 99164 - 1302 Dr. William G. Vernetson Director of Nuclear Facilities Department of Nuclear Engineering Sciences University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611
May 13, 2002 Dr. Gerald E. Tripard, Director Nuclear Radiation Center Washington State University Pullman, WA 99164-1300
SUBJECT:
INITIAL EXAMINATION REPORT NO. 50-027/OL-02-01
Dear Dr. Tripard:
During the week of April 01, 2002, the NRC administered examinations to an employee of your facility who had applied for a license to operate your Washington State University Reactor. The examination was conducted in accordance with NUREG-1478, "Non-Power Reactor Operator Licensing Examiner Standards," Revision 1.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/NRC/ADAMS/indesx.html. The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. Should you have any questions concerning this examination, please contact Patrick Isaac at 301-415-1019.
Sincerely,
/RA/
Patrick M. Madden, Section Chief Research and Test Reactors Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No.50-027
Enclosures:
1.
Initial Examination Report No. 50-027/OL-02-01 2.
Examination and answer key cc w/enclosures:
Please see next page DISTRIBUTION:
PUBLIC RORP r/f Facility File EBarnhill (O6-D17)
ADAMS ACCESSION #: ML021080729 TEMPLATE #: NRR-074 OFFICE RORP:CE IEHB:LA RORP:SC NAME PIsaac EBarnhill PMadden DATE 05/ 09 /2002 04/ 24 /2002 05/ 09 /2002 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY
ENCLOSURE 1 U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT REPORT NO.:
50-027/OL-02-01 FACILITY DOCKET NO.:
50-027 FACILITY LICENSE NO.:
R-76 FACILITY:
Washington State University EXAMINATION DATES:
04/02 - 03/2002 EXAMINER:
Patrick Isaac, Chief Examiner SUBMITTED BY:
/RA/
04/09/2002 Patrick Isaac, Chief Examiner Date
SUMMARY
During the week of April 01, 2002, NRC administered examinations, consisting of a written examination and an operating test, to one Reactor Operator (RO) applicant. The applicant passed all portions of the examination.
REPORT DETAILS 1.
Examiner:
Patrick Isaac, Chief Examiner 2.
Results:
RO PASS/FAIL SRO PASS/FAIL TOTAL PASS/FAIL Written 1/0 N/A 1/0 Operating Tests 1/0 N/A 1/0 Overall 1/0 N/A 1/0 3.
Exit Meeting:
Personnel attending:
Stephanie Sharp, Reactor Supervisor Keith Fox, SRO Patrick Isaac, NRC The licensee commented on a fair and well balanced examination. There were no generic concerns raised by the examiner.
U. S. NUCLEAR REGULATORY COMMISSION NON-POWER REACTOR INITIAL LICENSE EXAMINATION FACILITY:
WASHINGTON STATE UNIVERSITY REACTOR TYPE:
TRIGA DATE ADMINISTERED:
04/02/2002 CANDIDATE:
INSTRUCTIONS TO CANDIDATE:
Answers are to be written on the answer sheet provided. Attach the answer sheets to the examination. Points for each question are indicated in paren-theses for each question. A 70% overall is required to pass the examination. Examinations will be picked up three (3) hours after the examination starts.
% OF CATEGORY % OF CANDIDATE'S CATEGORY VALUE TOTAL SCORE VALUE CATEGORY 20.00. A. REACTOR THEORY, THERMODYNAMICS AND FACILITY OPERATING CHARACTERISTICS 20.00. B. NORMAL AND EMERGENCY OPERATING PROCEDURES AND RADIOLOGICAL CONTROLS 20.00. C. PLANT AND RADIATION MONITORING SYSTEMS 60.00 %
TOTALS FINAL GRADE ALL THE WORK DONE ON THIS EXAMINATION IS MY OWN. I HAVE NEITHER GIVEN NOR RECEIVED AID.
ENCLOSURE 2 CANDIDATE'S SIGNATURE
A. RX THEORY, THERMO & FAC OP CHARS Page 2 A N S W E R S H E E T Multiple Choice (Circle or X your choice)
If you change your answer, write your selection in the blank.
MULTIPLE CHOICE 001 a b c d ___
002 a b c d ___
003 a b c d ___
004 a b c d ___
005 a b c d ___
006 a b c d ___
007 a b c d ___
008 a b c d ___
009 a b c d ___
010 a b c d ___
011 a b c d ___
012 a b c d ___
013 a b c d ___
014 a b c d ___
015 a b c d ___
016 a b c d ___
017 a b c d ___
018 a b c d ___
019 a b c d ___
020 a b c d ___
(***** END OF CATEGORY A *****)
B. NORMAL/EMERG PROCEDURES & RAD CON Page 3 A N S W E R S H E E T Multiple Choice (Circle or X your choice)
If you change your answer, write your selection in the blank.
MULTIPLE CHOICE 001 a b c d ___
002 1 ___ 2 ___ 3 ___ 4 ___
003 a b c d ___
004 a b c d ___
005 a b c d ___
006 a b c d ___
007 a b c d ___
008 a ____________ b ____________ c ____________ d ____________
009 a b c d ___
010 a b c d ___
011 a b c d ___
012 a b c d ___
013 a b c d ___
014 a b c d ___
015 a b c d ___
016 a b c d ___
017 a b c d ___
018 a b c d ___
(***** END OF CATEGORY B *****)
C. PLANT AND RAD MONITORING SYSTEMS Page 4 A N S W E R S H E E T Multiple Choice (Circle or X your choice)
If you change your answer, write your selection in the blank.
MULTIPLE CHOICE 001 a b c d ___
002 a b c d ___
003 a b c d ___
004 a b c d ___
005 a b c d ___
006 a b c d ___
007 a b c d ___
008 a b c d ___
009 a b c d ___
010 a b c d ___
011 a b c d ___
012 a b c d ___
013 a b c d ___
014 a b c d ___
015 a b c d ___
016 a b c d ___
017 a b c d ___
018 a b c d ___
019 a b c d ___
020 a b c d ___
(********** END OF EXAMINATION **********)
NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply:
- 1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
- 2. After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have not received or given assistance in completing the examination. This must be done after you complete the examination.
- 3. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.
- 4. Use black ink or dark pencil only to facilitate legible reproductions.
- 5. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet.
- 6. Fill in the date on the cover sheet of the examination (if necessary).
- 7. Print your name in the upper right-hand corner of the first page of each section of your answer sheets.
- 8. Before you turn in your examination, consecutively number each answer sheet, including any additional pages inserted when writing your answers on the examination question page.
- 9. The point value for each question is indicated in parentheses after the question.
- 10. Partial credit will NOT be given.
- 11. If the intent of a question is unclear, ask questions of the examiner only.
- 12. When you are done and have turned in your examination, leave the examin-ation area as defined by the examiner. If you are found in this area while the examination is still in progress, your license may be denied
or revoked.
EQUATION SHEET
Net Work (out)
Q = m cp T Cycle Efficiency =)))))))))))))
Energy (in)
Q = m h SCR = S/(1-Keff)
Q = UA T CR1 (1-Keff)1 = CR2 (1-Keff)2 26.06 (eff)
(1-Keff)0 SUR =)))))))))))))
M = ))))))))))
( - )
(1-Keff)1 SUR = 26.06/
M = 1/(1-Keff) = CR1/CR0 P = P0 10SUR(t)
SDM = (1-Keff)/Keff
P = P0 e(t/)
Pwr = Wf m
(1-)
P = )))))))) Po
* = 1 x 10-5 seconds
-
= (*/) + [(-)/eff]
= */(-)
= (Keff-1)/Keff
eff = 0.1 seconds-1
= Keff/Keff 0.693 T1/2 = ))))))
= 0.0077
DR1D1 2 = DR2D2 2
DR = DRoe-t 6CiE(n)
DR = ))))))))
DR , Ci Curies, E Mev, R feet R2 1 Curie = 3.7x1010 dps 1 kg = 2.21 lbm 1 hp = 2.54x103 BTU/hr 1 Mw = 3.41x106 BTU/hr 1 BTU = 778 ft-lbf
F = 9/5C + 32 1 gal H2O 8 lbm
C = 5/9 (F - 32)
Section A: Reactor Theory. Thermo. & Fac. Operating Characteristics QUESTION (A.1)
[1.0]
A mixed beta-gamma point source measures 200 mrem/hr at one foot and 0.1 mrem/hr at 20 feet. The beta emission has an energy of 1.0 MeV. What is the fraction of betas in the source?
a.
10%
b.
20%
- c.
80%
d.
90%
QUESTION (A.2)
[1.0]
An element decays at a rate of 20% per day. Determine its half-life.
a.
3 hr.
b.
75 hr.
c.
108 hr.
d.
158 hr.
QUESTION (A.3)
[1.0]
The reactor has scrammed following an extended period of operation at full power. Which one of the following accounts for generation of a majority of the heat one (1) hour after the scram?
a.
Spontaneous fissions b.
Delayed neutron fissions c.
Alpha fission product decay d.
Beta fission product decay QUESTION (A.4)
[1.0]
In a subcritical Rx, Keff is increased from 0.861 to 0.946. Which one of the following is the amount of reactivity that was added to the core?
a.
0.090 delta-K/K b.
0.220 delta-K/K c.
0.104 delta-K/K d.
0.125 delta-K/K
Section A: Reactor Theory. Thermo. & Fac. Operating Characteristics QUESTION (A.5)
[1.0]
Given the following conditions:
-- The reactor is operating at a power level of 790 watts
-- The regulating control rod is withdrawn
-- The rod pull results in a stable, 45 second period SELECT the expected reactor power 100 seconds after the rod motion.
a.
2.63 MW
- b.
7290 watts
- c.
1756 watts
- d.
1238 watts QUESTION (A.6)
[1.0]
A reactor startup is in progress by withdrawing a control rod and then waiting until count rate stabilizes. The reactor is not critical. Assume that the control rod is being withdrawn in equal amounts each time and each control rod withdrawal adds equivalent amounts of reactivity.
Compare two consecutive control rod withdrawals.
a.
Time for power to stabilize will be equal for both withdrawals and the power increase will be the same for both withdrawals.
b.
The power increase will be the same for both withdrawals but the time for power to stabilize will be less for the second withdrawal.
c.
The power increase will be the same for both withdrawals but time for power to stabilize will be longer for the second withdrawal.
d.
The power increase will be larger for the second withdrawal and the time for power to stabilize will be longer for the second withdrawal.
Section A: Reactor Theory. Thermo. & Fac. Operating Characteristics QUESTION (A.7)
[1.0]
Which one of the following is the PRINCIPAL reason for operating with thermal neutrons instead of fast neutrons?
a.
Reactors operating primarily on fast neutrons are inherently unstable and cannot be easily controlled at low power.
- b.
The fission cross section of the fuel is much higher for thermal neutrons than for fast neutrons.
- c.
Doppler and moderator temperature coefficients become positive as neutrons energy increases.
- d.
Increased neutron efficient since thermal neutrons are less likely to leak out of the core than fast neutrons.
QUESTION (A.8)
[1.0]
Assume that reactor power is 50% and equilibrium Xenon is attained. Reactor power is then increased to 100%. Which one of the following correctly describes the new equilibrium Xenon value?
a.
The 100% equilibrium xenon is half the 50% value b.
The 100% equilibrium xenon is equal to the 50% value.
c.
The 100% equilibrium xenon is higher than the 50% value but not twice as high.
d.
The 100% equilibrium xenon is twice as high as the 50% value.
QUESTION (A.9)
[1.0]
Which of the following six factor formula terms are affected most by temperature?
a.
Thermal utilization and resonance escape probability b.
Fast fission factor and resonance escape probability c.
Fast fission factor and reproduction factor d.
Reproduction factor and thermal utilization
Section A: Reactor Theory. Thermo. & Fac. Operating Characteristics QUESTION (A.10)
[1.0]
Which one of the following describes how doubling the time a target nuclide is irradiated affects the activity level.
a.
Less than doubles the activity.
b.
More than doubles the activity.
c.
Exactly doubles the activity.
d.
Increases the activity by a factor of e.
QUESTION (A.11)
[1.0]
If reactor power is increasing by a decade every minute, it has a period of:
a.
13 sec b.
26 sec c.
52 sec d.
65 sec QUESTION (A.12)
[1.0]
Which one of the following is the primary reason a neutron source is installed in the core?
a.
To allow for testing and irradiation experiments when the reactor is shutdown.
b.
To supply the neutrons required to start the chain reaction for subsequent reactor startups.
c.
To provide a neutron level high enough to be monitored for a controlled reactor startup.
d.
To increase the excess reactivity of the reactor which reduces the frequency for refueling.
QUESTION (A.13)
[1.0]
If Keff equals 1.0, how much reactivity must be added to make the reactor prompt critical?
a.
The beta fraction.
b.
The amount to make Keff equal to 1.1.
c.
The amount to make the reactor period infinite.
d.
The amount needed to increase the mean neutron lifetime to 0.080 seconds.
QUESTION (A.14)
[1.0]
Section A: Reactor Theory. Thermo. & Fac. Operating Characteristics Which of the following is the PRIMARY advantage of using the homogeneous alloy of uranium fuel and zirconium-hydride moderator (U-ZrH) in the WSU TRIGA reactor?
This alloy combination:
a.
gives much longer core life by providing a large amount of "excess reactivity".
b.
makes the reactor self-regulating by providing a large negative temperature coefficient.
c.
allows the reactor to be pulsed to high power levels with minimal potential for cladding failure.
d.
yields more efficient heat transfer from the fuel centerline to the cladding and into the coolant.
QUESTION (A.15)
[1.0]
The reactor is subcritical with a Keff of 0.95 and a source range count rate of 15 counts per second. Control rods are withdrawn until the source range count rate equals 45 counts per second.
Which of the following is the Keff of the core after the control rod withdrawal?
a.
0.953 b.
0.970 c.
0.983 d.
0.995 QUESTION (A.16)
[1.0]
The regulating blade was withdrawn two (2) inches. The steady reactor period following blade withdrawal is observed to be sixty (60) seconds.
Which one of the following is the differential blade worth?
a.
9.1 x 10-4 delta k/k per inch b.
5.0 x 10-3 delta k/k per inch c.
1.2 x 10-4 delta k/k per inch d.
5.4 x 10-4 delta k/k per inch
Section A: Reactor Theory. Thermo. & Fac. Operating Characteristics QUESTION (A.17)
[1.0]
Preparations are being made to "pulse" the reactor. Given the following conditions:
-- Peak power from the previous pulse: 900 MW
-- Reactivity added from the previous pulse: $1.75
-- Reactivity to be added on this pulse: $2.00 What will be the ESTIMATED peak power for the new pulse operation?
- a.
1029 MW
- b.
1175 MW
- c.
1200 MW
- d.
1600 MW QUESTION (A.18)
[1.0]
Following a scram, the value of the stable reactor period is:
a.
approximately 50 seconds, because the rate of negative reactivity insertion rapidly approaches zero.
b.
approximately -10 seconds, as determined by the rate of decay of the shortest lived delayed neutron precursors.
c.
approximately -80 seconds, as determined by the rate of decay of the longest lived delayed neutron precursors.
d.
infinity, since neutron production has been terminated.
QUESTION (A.19)
[1.0]
During a reactor startup, as the reactor approaches criticality, the value of 1/M:
a.
decreases toward zero b.
decreases toward one c.
increases toward infinity d.
increases toward one
Section A: Reactor Theory. Thermo. & Fac. Operating Characteristics QUESTION (A.20)
[1.0]
Which one of the following is the definition of Shutdown Margin?
a.
The overall condition where the reactor is shutdown, the console key switch is off, and no work in progress involving fuel or experiments.
b.
The reactor can be made subcritical by at least $0.25 in a cold xenon-free condition, with the most reactive rod full out, and all samples in their most reactive positions.
c.
The condition where all control rods are fully inserted or reactivity condition equivalent to one where all control rods are fully inserted.
d.
The minimum shutdown reactivity necessary to ensure that the reactor can be made subcritical by means of the control and safety systems, from any operating conditions and will remain subcritical without further operator action.
(***** END OF CATEGORY A *****)
Section B: Normal/Emerg. Procedures & Rad Con.
QUESTION (B.1)
[1.0]
Consider two point sources, each having the same curie strength. Source A's gammas have an energy of 1 MEV whereas Source B's gamma have an energy of 2 MEV. You obtain a reading from the same Geiger counter 10 feet from each source. Concerning the two readings, which one of the following statements is correct?
- a.
The reading from Source B is four times that of Source A.
- b.
The reading from Source B is twice that of Source A.
- c.
Both readings are the same.
- d.
The reading from Source B is half that of Source A.
QUESTION (B.2)
[2.0]
Match the requirements for maintaining an active operator license in column A with the correct time period from column B.
Column A Column B 1.
Renewal of license a.
1 year 2.
Medical Examination b.
2 years 3.
Requalification Written examination c.
4 years 4.
Requalification Operating Test d.
6 years QUESTION (B.3)
[1.0]
Which one of the following does NOT require NRC approval for changes?
a.
Technical Specifications b.
Requalification plan c.
Emergency Implementation Procedures d.
Section B: Normal/Emerg. Procedures & Rad Con.
QUESTION (B.4)
[1.0]
The governor requests radiation workers to clean up an accident at WPPSS Nuclear facility. While helping out you receive a dose of 6 Rem. 10 CFR 20 requires that this dose be tracked as a Planned special exposure.
Who is responsible for maintaining a permanent record of this dose?
a.
Federal Emergency Management Agency (FEMA).
b.
WSU Research Reactor.
c.
Nuclear Regulatory Commission.
d.
State of Washington (an agreement state).
QUESTION (B.5)
[1.0]
Total Effective Dose Equivalent (TEDE) is defined as the sum of the deep dose equivalent and the committed effective dose equivalent. The deep dose equivalent is related to the a.
dose to organs or tissues.
b.
external exposure to the skin or an extremity.
c.
external exposure to the lens to the eyes.
d.
external whole-body exposure QUESTION (B.6)
[1.0]
Since he started employment at the WSU reactor a radiation worker has accumulated a dose of 3.27 R. So far this year, the worker has received a dose of 1.25 R. How long can he remain in an area with a gamma dose rate of 75 mR/hr without exceeding the 10CFR20 TEDE limit? (Assume zero committed dose.)
a.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> b.
23 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br /> c.
50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> d.
66 hours7.638889e-4 days <br />0.0183 hours <br />1.09127e-4 weeks <br />2.5113e-5 months <br />
Section B: Normal/Emerg. Procedures & Rad Con.
QUESTION (B.7)
[1.0]
A radioactive source generates a dose of 100 mr/hr at a distance of 10 feet. With two inches of lead shielding the reading drops to 50 mr/hr at a distance of 10 feet. If you were to add ANOTHER four inches of the same type of shielding, the reading at 10 feet would drop to a.
25 mr/hr b.
121/2 mr/hr c.
61/4 mr/hr d.
3c mr/hr QUESTION (B.8)
[2.0]
Identify each of the actions listed below as either a Channel Check, Channel Test, or Channel Calibration.
a.
Verifying overlap between Nuclear Instrumentation meters.
b.
Replacing an RTD with a precision resistance decade box, to verify proper channel output for a given resistance.
c.
Performing a calorimetric (heat balance) calculation on the primary system, then adjusting Nuclear Instrumentation to agree.
d.
During shutdown you verify that the period meter reads -80 seconds.
QUESTION (B.9)
[1.0]
Limiting Safety System Settings (LSSS) are a.
limits on important process variables necessary to protect the integrity of the cladding which guard against the uncontrolled release of radioactivity.
b.
setpoints for automatic protective devices related to those variables having significant safety functions.
c.
settings for ANSI 15.8 suggested reactor scrams and/or alarms which form the protective system for the reactor or provide information which requires manual protective action to be initiated.
d.
the lowest functional capability or performance levels of equipment required for safe operation of the reactor.
Section B: Normal/Emerg. Procedures & Rad Con.
QUESTION:
(B.10)
[1.0]
Which of the following will make the calculated Shutdown Margin MORE CONSERVATIVE (Larger)?
- a.
The reactor is at pool ambient temperature.
- b.
Reactor is shutdown with Control rod (shim) #2 fully withdrawn.
- c.
Reactor power is at 50% and Xenon concentration at equilibrium.
- d.
The highest worth non-secured experiment is in its most reactive state.
QUESTION: (B.11)
[1.0]
The reactor is shutdown and preparations are being made to place an experiment in the reactor pool.
SELECT the conditions REQUIRING the use of a specific written procedure for this evolution.
- a.
Dose rate from the experiment exceeds 10 mrem/hr on contact.
- b.
The Reactor Pool Room overhead crane will be used to position the apparatus.
- c.
The experiment apparatus is reading 175 mrem/hr at 1 meter
- d.
Swipe tests reveal that the experiment is contaminated.
QUESTION: (B.12)
[1.0]
A radioactive spill has occurred at the facility. Radioactive contamination and above normal radiation levels in the area have been confirmed. At what radiation level is the Facility Emergency Organization required to be mobilized?
- a.
10 mrem/hr
- b.
20 mrem/hr
- c.
50 mrem/hr
- d.
100 mrem/hr
Section B: Normal/Emerg. Procedures & Rad Con.
QUESTION: (B.13)
[1.0]
Technical Specifications require, if possible, that the reactor be operated at or beyond four (4) inches from the thermal column. IDENTIFY the reason for this distance limitation.
Reactor operation at less than four (4) inches from the thermal column will increase:
- a.
neutron embrittlement to the thermal column.
- b.
the radiation exposure due to iodine isotopes 131 through 135
- c.
the production of Nitrogen-16.
- d.
the production of Ar-41.
QUESTION: (B.14)
[1.0]
Which one of the following statements describes the reason for the Technical Specifications limit on primary coolant conductivity?
- a.
maintain the coolant in a slightly basic condition.
- b.
restrict the concentration of coolant dissolved oxygen.
- c.
place the coolant in a slightly acidic condition.
- d.
restrict the concentrations of coolant dissolved materials.
QUESTION: (B.15)
[1.0]
Which one of the following LIMITATIONS is placed on the irradiation of an explosive material in the reactor?
- a.
The total amount of explosive material to be irradiated cannot exceed 50 mg.
- b.
The reactor may not be "Pulsed" while explosive material is present.
- c.
Reactor power may not exceed 50% (0.5 MW) with 25 mg of material in the reactor.
d.
Less than 25 mg of nitroglycerin may be irradiated, provided the container is able to withstand a material detonation without failure.
Section B: Normal/Emerg. Procedures & Rad Con.
QUESTION: (B.16)
[1.0]
You are the Licensed Reactor Operator in the Control Room when you observes a Red light on the E.G.M.
ratemeter, a Yellow light on the Console Alarm Board and Annunciator sounding.
Which of the following are your REQUIRED actions?
- a.
Scram the reactor, remove the console key and evacuate the building as quickly as possible.
- b.
Pick up the Emergency Kit from the front office and assemble on the NRC front sidewalk.
- c.
Immediately proceed with Building Evacuation Procedure, B.1 and notify the Senior Operator on duty.
- d.
Isolate the ventilation system and notify the Senior Operator on duty.
QUESTION: (B.17)
[1.0]
Which of the following, if exceeded, REQUIRES an immediate reactor scram, a building evacuation AND declaration of an Alert?
- a.
The reactor was pulsed with a reactivity insertion of $2.90.
- b.
Steady state fuel temperatures are 475 degrees C.
- c.
Steady state power level is 1.2 MW.
- d.
Calculated shutdown margin is $.40.
QUESTION: (B.18)
[1.0]
SELECT the conditions under which the door to the Control Room may be left UNLOCKED.
(NOTE: Consider each choice separately.)
a.
The reactor is defueled and the console key is removed and is the possession of a licensed staff member.
b.
At least one person capable of following written instructions is in the Control Room.
- c.
The Director of the Nuclear Radiation Center is in the Control Room.
- d.
One member of the Washington State University Campus Police is in the Control Room.
(***** END OF CATEGORY B *****)
Section C: Plant & Rad. Monitoring Systems QUESTION:
(C.1)
[1.0]
SELECT the type of neutron startup source installed in the reactor prior to startup.
- a.
Plutonium-beryllium
- b.
Polonium-beryllium
- c.
Antimony-beryllium
- d.
Americium-beryllium QUESTION: (C.2)
[1.0]
How will a loss of the facility air supply systems affect the Transient Control Rod (Pulse Rod) during normal operation at power?
- a.
The rod will begin to insert as the accumulator air pressure decreases.
b.
Upon sensing the low air pressure, a solenoid valve deenergizes to relieve the pressure in the cylinder so that the rod drops to its lower limit by gravity.
- c.
The rod will maintain its present position and can only be pulsed twice before running out of air.
- d.
The rod can no longer be pulsed but will remain at its current position QUESTION: (C.3)
[1.0]
A reactor power calibration is in progress. The below listed data was recorded:
- Linear Channel 98%
- Safety Channel #1 91%
- Safety Channel #2 97%
- Calculated Power 94%
Which of the following is an ACCEPTABLE SEQUENCE for neutron chamber adjustments for the above conditions?
Position the neutron chambers as follows:
- a.
Raise CIC #2, lower the fission chamber, raise CIC #1.
- b.
Lower CIC #1, lower CIC #2, raise the fission chamber.
- c.
Lower CIC #1, lower the fission chamber, lower CIC #2.
- d.
Raise the fission chamber, raise CIC #1, raise CIC #2.
Section C: Plant & Rad. Monitoring Systems QUESTION: (C.4)
[1.0]
SELECT the specific reason why the WSU FLIP fuel has a much LONGER core lifetime than the standard TRIGA fuel.
- a.
The standard TRIGA fuel has a smaller fuel meat diameter and length.
- b.
The FLIP fuel contains a slightly different fuel-moderator material.
- c.
The standard TRIGA fuel contains Erbium.
- d.
The FLIP fuel has an installed burnable poison.
QUESTION: (C.5)
[1.0]
Which of the following determines the amount of reactivity that is inserted by the Transient Control Rod during a pulse operation?
- a.
The air pressure applied to the Transient Rod pneumatic piston.
- b.
The initial withdrawal position of the Transient Rod cylinder.
- c.
The reactor power level prior to initiating the Transient Rod pulse.
- d.
The timer setting that vents the pneumatic piston after the Transient Rod pulse.
QUESTION: (C.6)
[1.0]
The reactor is operating at 1 KW. Electrical power is lost to the Diffuser pump. All other facility systems are operating as designed.
Which of the following is the reason why radiation dose rates on the bridge will INCREASE for these conditions?
- a.
The Nitrogen-16 production rate will increase.
- b.
The pool water temperature will increase.
- c.
The Nitrogen-16 transport time will decrease.
- d.
The production of Ar-41 will increase.
Section C: Plant & Rad. Monitoring Systems QUESTION: (C.7)
[1.0]
With the reactor secured and the console control power turned off which ONE (1) of the following alarms will result in an automatic activation of the Building Evacuation alarm?
- a.
High neutron flux
- b.
Low pool water level
- c.
Fire alarm
- d.
High ARM alarm QUESTION: (C.8)
[1.0]
Which of the following Reactor Safety Channels is not required to be operable in both the Pulse and Steady State (SS) modes? (Required in only one mode)
- a.
Fuel Temperature
- b.
High Voltage Monitor
- c.
Transient Rod Control
- d.
Pool Level QUESTION: (C.9)
[1.0]
The Reactor Pool Room Ventilation System will shift to the "Dilute" mode upon receipt of a high alarm from the:
- a.
Reactor Bridge Area Radiation Monitor.
- b.
Console Area Radiation Monitor.
- c.
Gaseous Effluent Monitoring System.
- d.
Continuous Air Monitor System.
Section C: Plant & Rad. Monitoring Systems QUESTION: (C.10)
[1.0]
Which of the following is the method by which gamma-ray compensation is accomplished in the nuclear instrumentation compensated ion chambers.
a.
varying the pressure of the detector Argon charge gas in conjunction with a low boron concentration coating the inside walls of the outer chamber.
b.
the comparison of the currents generated in two concentric chambers in the detector, one sensitive only to gammas and one sensitive to neutrons and gammas.
c.
a pulse height discriminator that eliminates (or discriminates) the pulses from the low energy gammas and allows only the higher energy neutron signals through.
d.
varying the amount and concentration of the boron trifluoride gas in the compensated ion chamber thus reducing the detector's sensitivity to gamma induced ionizations.
QUESTION: (C.11)
[1.0]
Which of the following describes how the demineralizer (mixed bed ion exchanger) in the Pool Make-up and Demineralizer System functions to MINIMIZE CORROSION of reactor components?
The demineralizer:
- a.
maintains the pool water pH at a slightly basic value.
- b.
removes soluble radioactive impurities from the pool water.
- c.
removes suspended particles from the pool water.
- d.
maintains the pool water at a low conductivity.
QUESTION: (C.12)
[1.0]
The reactor is operating at 1 MW. A leak has developed in the primary cooling line from the pool cooling heat exchanger returning to the pool. Which one of the following will TERMINATE the pool water level decrease prior to reaching the top of the core?
a.
The pool cooling primary cooling supply and return lines will automatically isolate on lowering level.
- b.
The pool cooling system design physically prevents the pool level from reaching the top of the core.
- c.
The pool cooling primary pump will automatically trip on lowering pool level.
- d.
The pool cooling secondary pump will automatically divert secondary water to fill the pool.
Section C: Plant & Rad. Monitoring Systems QUESTION: (C.13)
[1.0]
SELECT the facility system that is monitored for possible releases of Argon-41.
- a.
Pool Room (Reactor) Ventilation System
- b.
Continuous Air Monitoring System
- c.
Liquid Waste Collection System
- d.
Primary Pool Cooling System QUESTION: (C.14)
[1.0]
Sampling and analyzing for Cobalt-60:
- a.
provides early indication of any reactor fuel failures.
- b.
ensures physical integrity of any sources stored in the pool.
- c.
provides confirmation of pool cooling system secondary to primary leakage.
- d.
monitors the performance of the demineralizer (mixed bed ion exchanger).
QUESTION: (C.15)
[1.0]
Which one of the following automatic reactor scrams is designed to PREVENT the reactor from exceeding a safety limit?
- a.
Transient rod preset timer scram
- b.
High-voltage monitor scram
- c.
Short reactor period scram
- d.
Reactor power level high scram QUESTION: (C.16)
[1.0]
Which of the following parameters provides the FIRST and PRIMARY indication that a small fuel failure (cladding failure) has occurred?
- a.
Pool water conductivity is increasing.
- b.
The Argon-41 monitor activity is increasing.
- c.
Continuous Air Monitoring System count rate is increasing.
- d.
The Nitrogen-16 content of the pool water is increasing.
Section C: Plant & Rad. Monitoring Systems QUESTION: (C.17)
[1.0]
Which of the following is the MECHANISM by which clad failure will occur if the WSU Technical Specification limit on fuel element temperatures is exceeded?
- a.
swelling of the fuel rod zirconium hydride.
- b.
hydrogen over pressurization from the dissociation of zirconium hydride.
- c.
phase changes in the type 304 stainless steel that reduces the clad yield strength.
- d.
excessive metallic "creep" in the type 304 stainless steel.
QUESTION: (C.18)
[1.0]
An emergency has occurred requiring the Reactor Pool Room Ventilation System to be placed in the "Isolate" mode. The Reactor Control Console (Room 201B) is not accessible. IDENTIFY the location where the Reactor Pool Room Ventilation System can be placed in the "Isolate" mode.
- a.
The Radiation Release Monitoring Panel in the Radiochemistry Laboratory.
- b.
The Emergency Operating Panel in the Reactor Supervisor's Office.
- c.
The Ventilation System Auxiliary Panel in the Front Office.
- d.
The Air Handling Control Panel in the Penthouse.
QUESTION: (C.19)
[1.0]
SELECT the REQUIRED operator actions upon receipt of a Low Pulse Air Pressure alarm AND confirmation of less than 60 psig pressure.
- a.
Inform the SRO on duty and take steps to regain air pressure.
- b.
Air scram the Transient Rod (Pulse Rod).
- c.
Place the Mode Switch in the "Rundown" position.
- d.
Manually insert the Transient Rod (Pulse Rod).
Section C: Plant & Rad. Monitoring Systems QUESTION: (C.20)
[1.0]
Which of the following describes how the reactor period signal is generated?
- a.
The Linear Indication Channel compensated ion chamber provides a direct rate of power change signal.
b.
The Pulse Power Channel gamma chamber supplies an power signal for a power change comparison with Wide Range Channel power.
c.
An input power signal from the Wide Range Channel fission chamber is used to calculate the rate of power change.
d.
The two Safety Channel fission chambers supply provide independent power signals used to calculate reactor period.
(********** END OF EXAMINATION **********)
Section A: Reactor Theory. Thermo. & Fac. Operating Characteristics ANSWER (A.1) c.
REFERENCE At 20 feet, all measured radiation is from gammas.
D1 r1 2 = D2 r2 2
D1 (1)2 = 0.1 mr (20)2 D1 = 40 mrem/hr gamma Ratio of beta to total = 1 - (40/200) = 80%
ANSWER (A.2) b.
REFERENCE A = Ao e-t
=.693/T2 ln(A/Ao) = -.693t/T2 T2 = -.693t/ln 0.8 = 75 hr ANSWER (A.3) d.
REFERENCE Burn, R., Introduction to Nuclear Reactor Operations, © 1988 pg. 3-4 ANSWER (A.4) c.
REFERENCE Burn, R., Introduction to Nuclear Reactor Operations, © 1988, § 3.3.4, p. 3-21.
ANSWER (A.5) b.
REFERENCE:
Reactor Operator Training Manual, Unit 5, "Introduction To Nuclear Physics", Page 168 P = 790 [e (100/45)] = 7290 watts ANSWER (A.6) d.
REFERENCE Burn, R., Introduction to Nuclear Reactor Operations, © 1988, Chapt. 5, pp. 5-1 5-28.
ANSWER (A.7) b.
REFERENCE Reactor Operating Training Manual, Unit 5
Section A: Reactor Theory. Thermo. & Fac. Operating Characteristics ANSWER (A.8) c.
REFERENCE Burn, R., Introduction to Nuclear Reactor Operations, © 1988, § 8.2-8.4, pp. 8-3.
ANSWER (A.9) a.
REFERENCE Burn, R., Introduction to Nuclear Reactor Operations, © 1988, § 3.3, pp. 3-13 3-19 ANSWER (A.10) a.
REFERENCE Burn, R., Introduction to Nuclear Reactor Operations, © 1988, pp. 2-65 ANSWER (A.11) b.
REFERENCE P = Poet/T 10 = 1e60/T ln 10 = 60/T 2.3 = 60/T T = 60/2.3 T = 26 seconds ANSWER (A.12) c.
REFERENCE Burn, R., Introduction to Nuclear Reactor Operations, © 1982, § 5.2 (b), p. 5-4.
ANSWER (A.13) a.
REFERENCE Burn, R., Introduction to Nuclear Reactor Operations, © 1982, § 4.2, p. 4-1.
ANSWER (A.14) b.
REFERENCE Reactor Operator Training Manual, Unit 6 ANSWER (A.15) c.
REFERENCE Reactor Operator Training Manual, Unit 5, "Introduction To Nuclear Physics", Page 111
Section A: Reactor Theory. Thermo. & Fac. Operating Characteristics
eff
eff
eff
( )1 ANSWER (A.16) d.
REFERENCE Burn, R., Introduction to Nuclear Reactor Operations, © 1988, § 7.2 & 7.3, pp. 7-1 7-9.
= 0.007/((0.1
- 60) + 1) = 0.0075/7
= 1.0 x 10-3 delta k/k
/inch = 1.0 x 10-3 delta k/k/2 inches = 5.0 x 10-4 delta k/k per inch ANSWER (A.17) d.
REFERENCE P1/(Rho1-1)squared = P2/(Rho2-1)squared P2 = 1600 MW ANSWER (A.18) c.
REFERENCE Burn, R., Introduction to Nuclear Reactor Operations, © 1982, § 4.6, p. 4-16.
ANSWER (A.19) a.
REFERENCE Glasstone, S. and Sesonske, A, Nuclear Reactor Engineering, Kreiger Publishing, Malabar, Florida, 1991, §§ 3.161 3.163, pp. 191 192.
ANSWER (A.20) d.
REFERENCE T.S. Definitions
(*** End of Section A ***)
Section B: Normal/Emerg. Procedures & Rad Con.
ANSWER (001) c.
REFERENCE GM is not sensitive to energy.
ANSWER (B.2) 1_ d; 2_ b; 3_ b; 4_ a REFERENCE 10 CFR 55 ANSWER (B.3) c.
REFERENCE 10 CFR 50.54 (q); 10 CFR 50.59; 10 CFR 55.59 ANSWER (B.4) b.
REFERENCE 10 CFR 20 ANSWER (B.5) d.
REFERENCE 10 CFR 20.1201 ANSWER (B.6) c.
REFERENCE 10 CFR 20 Whole Body Limit = 5 R Time = [(5 R - 1.25 R) / 0.075 R/hr] = 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> ANSWER (B.7) b.
REFERENCE Two inches = one-half thickness (T1/2). Using 3 half-thickness will drop the dose by a factor of (1/2)3 = c.
100/8 = 12.5 ANSWER (B.8) a, check; b, test; c, calibration; d, check REFERENCE T.S. 1.4 ANSWER (B.9) b.
REFERENCE Tech. Specs Definitions
Section B: Normal/Emerg. Procedures & Rad Con.
ANSWER (B10) c.
REFERENCE T.S. 3.2 ANSWER (011) c.
REFERENCE Standard Operating Procedure #34, "Transfer of Non-Fuel Devices and Experiment Apparatus into...,
Page 3 ANSWER (012) b.
REFERENCE Emergency Plan & Implementing Procedures, "Facility Contamination", Section 1 ANSWER (013) d.
REFERENCE WSU Technical Specification 3.12, Pages 16 & 17 ANSWER (014) d.
REFERENCE WSU Technical Specification 3.13, Page 17 ANSWER (015) d.
REFERENCE WSU Technical Specification 3.10, Page 14 ANSWER (016) d.
REFERENCE standard Operating Procedure #19, "Action In Event Of Alarm", Page 5 ANSWER (017) a.
REFERENCE Emergency Plan & Implementing Procedures, "Exceeding A Safety Limit", Sections 1 & 2 ANSWER (018) c.
REFERENCE Administrative Procedures, Section 4, "Access Control At The Nuclear Radiation Center", Page 2 Standard Operating Procedure #4, "Startup, Operation And Shutdown Of The Reactor, Page 1
Section C: Plant & Rad. Monitoring Systems ANSWER: 001 (1.00) c.
REFERENCE Reactor Operator Training Manual, Unit 11, Appendix Page 2 ANSWER: 002 (1.00) a.
REFERENCE Safety Analysis Report, Section 4.0, "Reactor Description", Pages 4 4-22 ANSWER: 003 (1.00) a.
REFERENCE:
Standard Operating Procedure #13, "Performing Reactor Power Calibration", Page 5 ANSWER: 004 (1.00) d.
REFERENCE:
Reactor Operator Training Manual, Unit 11, Pages 4 & 5 ANSWER: 005 (1.00) b.
REFERENCE:
Standard Operating Procedure #4, "Startup, Operation And Shutdown Of The Reactor", Page 7 ANSWER: 006 (1.00) c.
REFERENCE:
Safety Analysis Report, Section 4.0, "Reactor Description", Page 4-35 ANSWER: 007 (1.00) d.
REFERENCE:
SOP #19 Para. B.5, pg. 3 ANSWER: 008 (1.00) c.
REFERENCE:
Safety Analysis Report, Section 4.0, Table 4.8-1 ANSWER: 009 (1.00) d.
REFERENCE:
Safety Analysis Report, Section 3.0, "Facility Structure", Page 3-10 Standard Operating Procedure #26, "Continuous Air System Check And Calibration", Page 2
Section C: Plant & Rad. Monitoring Systems ANSWER: 010 (1.00) b.
REFERENCE:
Reactor Operator Training Manual, Unit 8, Pages 28 - 30 ANSWER: 011 (1.00) d.
REFERENCE:
WSU Technical Specification 3.13, Page 17 ANSWER: 012 (1.00) b.
REFERENCE:
Safety Analysis Report, Section 4.0, "Reactor Description", Page 4-30 ANSWER: 013 (1.00) a.
REFERENCE:
Safety Analysis Report, Section 3.0, "Facility Structure", Page 3-7 ANSWER: 014 (1.00) b.
REFERENCE:
Standard Operating Procedure #24, "Pool Water Analysis", Page 1 ANSWER: 015 (1.00) d.
REFERENCE:
WSU Technical Specification 3.6.3 Bases, Pages 11 & 12 ANSWER: 016 (1.00) c.
REFERENCE:
Reactor Operator Training Manual, Unit 6, Reactor Operator Training Notes, Pages 1 & 2 Emergency Plan and Implementing Procedures, "Fuel Element Failure" ANSWER: 017 (1.00) b.
REFERENCE:
WSU Technical Specification 2.1, Bases, Page 6 ANSWER: 018 (1.00) c.
REFERENCE:
Standard Operating Procedure #5, "Performing Preventive Maint...Equipment", Pages 12 -14
Section C: Plant & Rad. Monitoring Systems ANSWER: 019 (1.00) b.
REFERENCE:
Standard Operating Procedure #19, "Action In Event Of An Alarm", Page 6 ANSWER: 020 (1.00) c.
REFERENCE:
Safety Analysis Report, Section 4.0, "Reactor Description", Page 4-29, Figure 4.8-5
(********** END OF EXAMINATION **********)