April 22, 2002 Mr. Mano Nazar Site Vice President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 -
NRC STAFF FOLLOW-UP OF STEAM GENERATOR TUBE INSPECTION ACTIVITIES DURING RECENT REFUELING OUTAGES (TAC NOS. MB1305 AND MB4012)
Dear Mr. Nazar:
As you are aware, the NRC staff has been following up on your recent steam generator tube inspections performed at the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2.
The staffs review efforts to date in this area are documented in a meeting summary dated May 24, 2001, (ADAMS Accession No. ML011500483) and also in a letter dated April 12, 2002, (ADAMS Accession No. ML021050465). As noted in these documents, the NRC staff raised a concern regarding the procedures for addressing noise in the eddy current test data in the U-bend region of low row tubes and expressed an interest in better understanding the licensees methodology for ensuring flaw detection in the U-bend region of low row tubes with high eddy current noise levels. As a result, a site visit has been arranged for our key technical staff by members of your staff for a more detailed discussion of the criteria and the methodology for detecting flaws in data with high noise levels relative to the detection of all potentially significant flaws. The site visit is planned for April 30 - May 1, 2002, and the NRC staff members will include Emmett Murphy (Senior Materials Engineer) and myself, as well as Caius Dodd (NRC Consultant).
If you have any questions regarding this matter, please contact me at (301) 415-1392.
Sincerely,
/RA/
Tae Kim, Senior Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306 cc: See next page
ML011500483) and also in a letter dated April 12, 2002, (ADAMS Accession No. ML021050465). As noted in these documents, the NRC staff raised a concern regarding the procedures for addressing noise in the eddy current test data in the U-bend region of low row tubes and expressed an interest in better understanding the licensees methodology for ensuring flaw detection in the U-bend region of low row tubes with high eddy current noise levels. As a result, a site visit has been arranged for our key technical staff by members of your staff for a more detailed discussion of the criteria and the methodology for detecting flaws in data with high noise levels relative to the detection of all potentially significant flaws. The site visit is planned for April 30 - May 1, 2002, and the NRC staff members will include Emmett Murphy (Senior Materials Engineer) and myself, as well as Caius Dodd (NRC Consultant).
If you have any questions regarding this matter, please contact me at (301) 415-1392.
Sincerely,
/RA/
Tae Kim, Senior Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306 cc: See next page DISTRIBUTION PUBLIC TKim BBateman ALund PDIII-1 Reading OGC EMurphy KKarwoski ACRS RLanksbury, RIII JJacobson, RIII MHolmberg, RIII RBouling ADAMS Accession No.: ML021080620 OFFICE PDIII-1/PM PDIII-1/LA EMCB/SC PDIII-1/SC NAME TKim RBouling ALund LRaghavan DATE 04/22/02 04/22/02 04/22/02 04/22/02
Prairie Island Nuclear Generating Plant, Units 1 and 2 cc:
J. E. Silberg, Esquire Shaw, Pittman, Potts and Trowbridge 2300 N Street, N. W.
Washington, DC 20037 Site Licensing Manager Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089 Adonis A. Neblett Assistant Attorney General Office of the Attorney General 455 Minnesota Street Suite 900 St. Paul, MN 55101-2127 U.S. Nuclear Regulatory Commission Resident Inspectors Office 1719 Wakonade Drive East Welch, MN 55089-9642 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Administrator Goodhue County Courthouse Box 408 Red Wing, MN 55066-0408 Commissioner Minnesota Department of Commerce 121 Seventh Place East Suite 200 St. Paul, MN 55101-2145 Tribal Council Prairie Island Indian Community ATTN: Environmental Department 5636 Sturgeon Lake Road Welch, MN 55089 Mr. Roy A. Anderson Executive Vice President and Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Nuclear Asset Manager Xcel Energy, Inc.
414 Nicollet Mall Minneapolis, MN 55401 March 2002