MONTHYEARML0210504472002-02-12012 February 2002 Enclosure 2, Followup Questions from 02/12/2002 Phone Call Project stage: Other ML0210504402002-02-12012 February 2002 Nuclaer Generating Plant, Unit 2, Enclosure 1, EOC 20 S/G Inspection Results Project stage: Other ML0209502432002-04-12012 April 2002 Summary of Conference Calls with Nuclear Management Co Re Steam Generator Tube Inspection Activities at Prairie Island, Unit 2, TAC No. MB4012 Project stage: Other ML0210806202002-04-22022 April 2002 NRC Staff follow-up of Steam Generator Tube Inspection Activities During Recent Refueling Outages Project stage: Other ML0300805812003-01-27027 January 2003 NRC Staff Follow-Up of Steam Generator Tube Inspection Activities During Recent Refueling Outage Project stage: Other 2002-04-12
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000282/20244032024-10-25025 October 2024 – Security Baseline Inspection Report 05000282/2024403 and 05000306/2024403 05000282/LER-2024-001-01, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-10-22022 October 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies L-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML24277A1012024-10-0303 October 2024 Closure of Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software ML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 ML24241A1682024-09-23023 September 2024 Transmittal Letter Amendment No. 13 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 05000282/LER-2024-001, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-09-16016 September 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 IR 05000282/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2024005 and 05000306/2024005) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter IR 05000282/20245012024-08-0505 August 2024 Emergency Preparedness Inspection Report 05000282/2024501 and 05000306/2024501 ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant IR 05000282/20240022024-07-30030 July 2024 Integrated Inspection Report 05000282/2024002 and 05000306/2024002 ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 IR 05000282/20240102024-06-28028 June 2024 Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24158A5912024-06-0606 June 2024 CFR 50.46 LOCA Annual Report L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption ML24155A1922024-05-31031 May 2024 Refueling Outage Unit 2 R33 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections 05000306/LER-2024-001-01, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-05-31031 May 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24128A2572024-05-16016 May 2024 ISFSI A13 Acceptance Letter IR 05000282/20240012024-05-15015 May 2024 Integrated Inspection Report 05000282/2024001 and 05000306/2024001 ML24130A2362024-05-0909 May 2024 Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Monitoring Program Report ML24130A2392024-05-0909 May 2024 2023 Annual Radioactive Effluent Report ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24128A0882024-04-30030 April 2024 Submittal of Updated Safety Analysis Report (Usar), Revision 38 ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance 05000306/LER-2024-001, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-04-29029 April 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump IR 05000282/20244012024-04-25025 April 2024 – Security Baseline Inspection Report 05000282/2024401 and 05000306/2024401 ML24100A8042024-04-24024 April 2024 – Alternative Request RR-09 for Safety Injection and Volume Control System Category C Check Valve Inservice Testing ML24114A0882024-04-23023 April 2024 Annual Report of Individual Monitoring for the Prairie Island Nuclear Generating Plant (PINGP) ML24113A1182024-04-12012 April 2024 NRC Letter Re NRC Office of Investigations Report No. 3-2023-004 ML24100A1212024-04-0909 April 2024 Submittal of Revised Pressure and Temperature Limits Report ML24093A2832024-04-0202 April 2024 Nuclear Material Transaction Report L-PI-24-012, Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-04-0202 April 2024 Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) ML24089A2402024-03-29029 March 2024 Guarantee of Payment of Deferred Premiums ML24060A1232024-03-27027 March 2024 to Request 1-RR-5-10 and 2-RR-5-10 Regarding Reactor Pressure Vessel Welds and Nozzle Welds ML24081A1532024-03-21021 March 2024 Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24010A0582024-03-0505 March 2024 Amendment No. 12 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation L-PI-24-004, Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 20232024-02-29029 February 2024 Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 2023 IR 05000282/20230062024-02-28028 February 2024 Annual Assessment Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2023006 and 05000306/2023006) ML24088A1102024-02-25025 February 2024 Fairbanks Morse (Fm) Part 21 Notification Report Number 23-01 Re Asco Stainless Steel Solenoid Valves 2024-09-27
[Table view] |
Text
April 22, 2002 Mr. Mano Nazar Site Vice President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 -
NRC STAFF FOLLOW-UP OF STEAM GENERATOR TUBE INSPECTION ACTIVITIES DURING RECENT REFUELING OUTAGES (TAC NOS. MB1305 AND MB4012)
Dear Mr. Nazar:
As you are aware, the NRC staff has been following up on your recent steam generator tube inspections performed at the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2.
The staffs review efforts to date in this area are documented in a meeting summary dated May 24, 2001, (ADAMS Accession No. ML011500483) and also in a letter dated April 12, 2002, (ADAMS Accession No. ML021050465). As noted in these documents, the NRC staff raised a concern regarding the procedures for addressing noise in the eddy current test data in the U-bend region of low row tubes and expressed an interest in better understanding the licensees methodology for ensuring flaw detection in the U-bend region of low row tubes with high eddy current noise levels. As a result, a site visit has been arranged for our key technical staff by members of your staff for a more detailed discussion of the criteria and the methodology for detecting flaws in data with high noise levels relative to the detection of all potentially significant flaws. The site visit is planned for April 30 - May 1, 2002, and the NRC staff members will include Emmett Murphy (Senior Materials Engineer) and myself, as well as Caius Dodd (NRC Consultant).
If you have any questions regarding this matter, please contact me at (301) 415-1392.
Sincerely,
/RA/
Tae Kim, Senior Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306 cc: See next page
ML011500483) and also in a letter dated April 12, 2002, (ADAMS Accession No. ML021050465). As noted in these documents, the NRC staff raised a concern regarding the procedures for addressing noise in the eddy current test data in the U-bend region of low row tubes and expressed an interest in better understanding the licensees methodology for ensuring flaw detection in the U-bend region of low row tubes with high eddy current noise levels. As a result, a site visit has been arranged for our key technical staff by members of your staff for a more detailed discussion of the criteria and the methodology for detecting flaws in data with high noise levels relative to the detection of all potentially significant flaws. The site visit is planned for April 30 - May 1, 2002, and the NRC staff members will include Emmett Murphy (Senior Materials Engineer) and myself, as well as Caius Dodd (NRC Consultant).
If you have any questions regarding this matter, please contact me at (301) 415-1392.
Sincerely,
/RA/
Tae Kim, Senior Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306 cc: See next page DISTRIBUTION PUBLIC TKim BBateman ALund PDIII-1 Reading OGC EMurphy KKarwoski ACRS RLanksbury, RIII JJacobson, RIII MHolmberg, RIII RBouling ADAMS Accession No.: ML021080620 OFFICE PDIII-1/PM PDIII-1/LA EMCB/SC PDIII-1/SC NAME TKim RBouling ALund LRaghavan DATE 04/22/02 04/22/02 04/22/02 04/22/02 Prairie Island Nuclear Generating Plant, Units 1 and 2 cc:
J. E. Silberg, Esquire Tribal Council Shaw, Pittman, Potts and Trowbridge Prairie Island Indian Community 2300 N Street, N. W. ATTN: Environmental Department Washington, DC 20037 5636 Sturgeon Lake Road Welch, MN 55089 Site Licensing Manager Prairie Island Nuclear Generating Plant Mr. Roy A. Anderson Nuclear Management Company, LLC Executive Vice President and 1717 Wakonade Drive East Chief Nuclear Officer Welch, MN 55089 Nuclear Management Company, LLC 700 First Street Adonis A. Neblett Hudson, WI 54016 Assistant Attorney General Office of the Attorney General Nuclear Asset Manager 455 Minnesota Street Xcel Energy, Inc.
Suite 900 414 Nicollet Mall St. Paul, MN 55101-2127 Minneapolis, MN 55401 U.S. Nuclear Regulatory Commission Resident Inspectors Office 1719 Wakonade Drive East Welch, MN 55089-9642 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Administrator Goodhue County Courthouse Box 408 Red Wing, MN 55066-0408 Commissioner Minnesota Department of Commerce 121 Seventh Place East Suite 200 St. Paul, MN 55101-2145 March 2002