{{#Wiki_filter:NMC--t Commited to Nucl HenrE ce." Nuclear Management Company, LLC Prairie Island Nuclear Generating Plant 1717 Wakonade Dr. East 9 Welch MN 55089 10 CFR Part 50 Section 50.55a U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 Response to a Request for Additional Information Regarding Request for Relief No. 11 for the Unit 1 3rd 10-year Interval Inservice Inspection Program (TAC No. MB2199) On May 29, 2001 we submitted for review Request for Relief No. 11 for Inservice Inspection Program for Unit 1, for examinations which were limited. The request was made pursuant to 10 CFR Part 50, Section 50.55a(g)(5)(iii) due to the impracticality of obtaining "100%" examination coverage for the affected items. The NRC issued a Request for Additional Information (RAI) regarding the relief request by letter dated February 4, 2002. Enclosed with this letter is the response to that RAI. Also enclosed are four revised pages to the original relief request. In this letter we have made no new Nuclear Regulatory Commission commitments. Please contact Jack Leveille (651-388-1121, Ext. 4142) if you have any questions related to this letter. Mano K. Naz Site Vice Pr ident Prairie Isla Nuclear Generating Plant c: (next page) A011q April 15, 2002
USNRC NUCLEAR MANAGEMENT COMPANY, LLC April 15, 2002 Page 2 c: Regional Administrator - Region III, NRC (2 copies of attachment) Senior Resident Inspector, NRC NRR Project Manager, NRC Chief Boiler Inspector, State of MN P. Fisher, Hartford Insurance
Enclosures:
- 1. Response to RAI, including 18 attachments
- 2. Revised Pages 1, 2, 6, and 9 of ISI Relief Request No. 11, Limited Examination U1 Limited Exams.DOC Response to RAI, including 18 attachments A. Technical Letter Report (8 pages)
B. Attachments 1.) Report 2001U039 and sketch 2.) Report 2001U004 and sketch 3.) Report 2001U010 and sketch 4.) Report 2001U029 and sketch 5.) ISO metric Drawing ISI-93B 6.) ISO metric Drawing ISI-5 1B 7.) ISO metric DrawingISI-68A 8.) ISO metric Drawing ISI-69 9.) Report 2001M034 and sketch 10.) Report 2001M030 11.) Report 2001M034 12.) ISO metric Drawing ISI-83C 13.) Report 2001P056 14.) Report 2001U013 and sketch 15.) Report 2001U034 and sketch 16.) Limitation Record for Report 200 1U040 with sketch 17.) Report 2001M016 and sketch 18.) INSERVICE INSPECTON - NONDESTRUCTIVE EXAMINATION PROCEDURE ISI-LTS-1, Limitations to NDE, Revision 2
TECHNICAL LETTER REPORT REQUESTS FOR ADDITIONAL INFORMATION ON THIRD 10-YEAR IN-SERVICE INSPECTION INTERVAL REQUEST FOR RELIEF FOR NUCLEAR MANAGEMENT COMPANY PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 DOCKET NUMBER: 50-282
- 1.
SCOPE By letter dated May 29, 2001, the licensee, Nuclear Management Company (NMC), submitted multiple requests for relief from the requirements of the ASME Code, Section XI, for the Prairie Island Nuclear Generating Plant, Unit 1. These relief requests are for the third 10-year inservice inspection (ISI) interval. Brookhaven National Laboratory (BNL) reviewed the information submitted by the licensee and based on this review, the following information for each relief request is required to complete this evaluation.
- 2.
REOUESTS FOR ADDITIONAL INFORMATION General (1) Please provide the date when the Third 10-year ISI Interval began for the Prairie Island Nuclear Generating Plant, Unit 1. Response: The 3 rd 10 year Interval began on Dec 17, 1993 and ends Dec. 16, 2003. (2) For the proposed alternative examination, it was stated in the licensee's submittal that Metal and Material Resources Procedure ISI-LTS-1 is applied when limitation to required inspections are encountered. In order to evaluate the acceptability and appropriateness of the proposed alternative, a review of this procedure is required. Please describe the related activities that are applicable to this relief request for all Parts A-E below. Explain how these activities provided an alternative to the Code-required examination(s) and how the licensee gained the maximum obtainable inspection coverage practically possible. Response: ISI-L TS-1 (Attachment 18) is the procedure used when an ASME Section XI Code required examination results in less than 90% Coverage. It requires a review ofprocedures to obtain maximum coverage and documentation of the limitation. The procedure also examines whether an alternative method could be used to obtain better coverage as allowed by the Code. (3) None of the limitations identified in Table 1 of the submittal discussed the ALARA concerns. However, the alternative examination section of the submittal states that "Limitations are due to design, geometry, and materials of construction of the components or ALARA concerns." Explain how the ALARA concerns affected the impracticality in performing the Code-required inspection activities for the subject welds.
Response: Some of the examinations are in significant radiation fields, and excessive efforts to use alternative examination techniques without significant gain in examination coverage are not warranted. These radiation fields are recorded on the limitation datasheets provided with the relief requests as attachments. For this relief request no specific item was identified as an ALARA concern in itself Configuration issues are the main reason for the relief request or new Performance Demonstrated Initiative UT Methods as allowed by 10 CFR55a limit the acceptable examination coverage. 2.1 Req uest for Relief No.11. for "limited examinations" associated with Third 1 0-year Interval Program Plan Issued on February 22, 1996. Part A: Pressure retaining welds in the reactor coolant system piping, Weld W-6 (pipe to elbow) and Weld W-1 (RC pump to pipe), Examination Category B-J, Item No. B9.1 1. Pursuant to 10 CFR 50.5 5a(g)(5)(iii), the licensee requested relief from the 100% volumetric examination requirements for a reactor coolant system pipe to elbow weld W-6 and a reactor coolant pump to pipe weld W-1. Due to interferences and access limitations, the licensee performed single side examination only and therefore, could examine 75% (for the weld W-6) and 38.85% (for the weld W-1) of the Code-required volumes. In order for the proposed alternative to be considered, please provide the following: (1) Table 1 of the licensee submittal indicates that the limitation for the weld W-6 is (PDI) single sided examination due to pipe configuration and for the weld W-I is (PDD) single sided examination due to pump to pipe configuration. The sketches provided in the associated summary sheets are not clear to understand these limitations. Explain with sketches or photos what kind of configuration problems are associated with each of these welds. Discuss the relationship of the configuration limitations with PDI and provide the reference of the PDI section. Response: No photos of these limitations are available. The limitations for W-1 and W-6 are related to contour configuration of the OD scan surfaces that precluded a four directional scan of the weld volume particularly from the valve side (W-1) or pump side (W-6) of the weld, which is shown on the sketches previously submitted and new sketches (Attachments 1 and 2). 10 CFR 50.55a(b)(2)(xv)(A), 10 CFR 50.55a(b)(2)(xv)G and 10 CFR 50.55a(b)(2)9(xvi), define new requirements for coverage and qualification demonstration of UT Methods. These requirements affect both piping and RPV examinations. The PDI UT methodology is in agreement with the Federal Code regarding single side access for piping. The Federal Code requires that if access is available the weld shall be scanned in each of the four directions (parallel and perpendicular to the weld) where required. Coverage credit may be taken for single side exams on ferritic piping. However, for austenitic piping a 2
procedure must be qualified with flaws on the inaccessible side of the weld. The final rule requires that single side access examinations must demonstrate "equivalency to two sided examinations". Current technology is not capable of reliably detecting or sizing flaw on the inaccessible side of an austenitic weld, for configurations common to US nuclear applications. Instead of a full single side qualification, PDI offers a best effort approach, which demonstrates that the best available technology is applied. This best effort approach does not meet the requirements of the Federal Code. PDI lists the limitation that single side examination is performed on a best effort basis. This requires the inaccessible side of the weld to be listed as an area of limited coverage. Hence for W-1 and W-6 only limited coverage is obtained. Table 1 has been corrected to show W-1 limitation to be 50%and W-6 limitation to be 50%. See Attachments I and 2, UT examination reports and sketches (2001 U039 and 2001U004). (2) The description in the Table 1 of the licensee submittal identifies the weld W-6 is a circumferential weld between the RC piping to elbow, while the sketch in the corresponding summary report No. 300130 indicates that the weld is for the piping to valve. Clarify this discrepancy. Response: The Table I entry is incorrect and should say "Piping to Valve" as indicated on inspection report and sketch (Attachment 2). The limitation coverage for W-1 is also incorrect and should be 50% Coverage. These have been entered into the plant corrective action process. (3) Confirm that Code-required essentially 100% surface examination was performed for both W-6 and W-1 welds. Response: 100% coverage PT surface examination was performed on these welds. (4) Provide details of the alternatives, including system pressure test requirements for the reactor coolant system, proposed and/or attempted by the licensee for the subject welds. Response: VT-2 (visual examinations) and functional pressure test requirements are being performed and meet the code requirements for these welds. As noted above, a 100% OD PT surface examination was also performed on these welds. Part B: Pressure retaining welds in pressure vessels, Weld W-E (#12 steam generator shell to transition) and Weld W-2 (#12 RHR Rx shell to flange), Examination Category C-A, Item No. C1.10. Pursuant to 10 CFR 50.55a(g)(5)(iii), the licensee requested relief from the 100% volumetric examination requirements for a shell-to-transition weld W-E on the #12 Steam Generator and a shell-to-flange weld W-2 on the #12 RHR Heat Exchanger. Due to interferences, the licensee is proposing a 70.88% (for the weld W-E) and 27.26% (for the weld W-2) of the Code-required volumes. In order for the proposed alternative to be considered, please provide the following: 3
(1) The submittal is requesting relief from the Code-required volumetric examination for the welds W E and W-2 based on limitations in scanning the welds due to interferences caused by the weld geometry and configuration. Explain if the alternatives include surface examinations, radiography, and/or any other examination methods and describe the results of these examinations. Response: The alternative does not include surface examination since the code requirement is full weld volumetric. Also, radiography is not a viable option for these volumetric examinations since the S/G and heat exchanger would have to be drained down and SIG internals would have to be removed to perform radiography. No alternative examinations were performed. (2) The sketches given in Summary Nos. 301070 and 303054 are not clear. Provide sketches showing the Code-required volume to be examined and the scanner locations with volume coverage as practical. Response: Attached are UT reports 2001 U01 0, 2001 U029 and associated sketches (Attachments 3 and 4) and ISI-93B diagram of W-2 (Attachment 5). The UT coverage indicated on Table 1, of 70.88% for Weld W-E is incorrect and should state 77.54% coverage. This has been entered into the plant corrective action process. Weld W-E downstream UT scan is inaccessible due to restraining ring around Steam Generator. For W-2 flange, contour surface prevents adequate scan coverage downstream. (3) Provide details of the alternatives, including system pressure test requirements for the components containing the welds, proposed and/or attempted by the licensee for the subject welds. Response: VT-2 (visual examinations) and functional pressure test requirements are being performed and meet the code requirements for these welds. Part C: Integral attachment welds for piping and pumps, Examination Category C-C, Item Nos. C3.20 & C3.30. Pursuant to 10 CFR 50.5 5a(g)(5)(iii), the licensee requested relief from the Code-required surface examinations for nineteen integral attachment welds for piping and pumps in the main steam piping, feedwater piping, SI pumps, and RHR heat exchanger. For six of these welds, no surface examination could be performed due to interferences. In order for the proposed alternative to be considered, please provide the following: (1) For these welds, were any alternative inspection measures considered, such as examining surrogate welds, or performing a visual inspection to look for signs for degradation near the weld ? Response: This ASME Code Category requires all integral attached welds to be inspected each interval. So there are no surrogate welds. The Code required examination is a surface examination, PT or MT. A Visual VT-3 examination is 4
performed on these supports and the weld areas that are accessible as required by IWF and Code Case 491. No degradation near the welds was observed. These welds are covered by VT-2 (visual examinations) and functional pressure tests. (2) The diagrams given in the Limitation Record sheets are not clear, specifically the surface areas to be examined and the inaccessible portions of the weld. Some are covered by guard pipes and the licensee submittal for these welds include only the Magnetic Particle Examination sheets and no sketches or diagrams. Please provide detail sketches or photos with sufficient details so that the staff could determine the interferences on accessing the Code-required surfaces for the subject welds. Response: Guard piping completely encloses the weld areas. See attached Isometric drawing ISI-51B, ISI-68-A, and ISI-69 (Attachments 6, 7, and 8) for location of Guard Pipe. Photograph of guard pipe not available. (3) Explain why the integral attachment for the #12 RHR Heat Exchanger Support integral attachment weld is considered under Examination Category C-C, Item Number C3.20 which is applicable to piping. Response: This item number should be C3.10. This has been entered into the plant corrective action process. (4) Explain the following specific welds: (a) Summary No. 301589 shows a weld to pipe obstructed by guard pipe and insulation. Why can the insulation not be removed for surface examination? Response: Removal of insulation would not facilitate inspection. The inspection is constrained by guard pipe and configuration of the restraint collar. (b) Summary No. 301258 shows floor penetration which prohibits examination of the middle 12" of the two vertical welds on the pipe collar. The drawings do not clearly demonstrate the subject welds (2 circumferential welds and 2 vertical welds) and inaccessible portions of these welds. Please provide new sketches or photos showing the welds with inaccessible portions. Response: There is no photo available. A new sketch is provided and examination -report 2001M034 (Attachments 9 and 11). (c) Sketches in summary nos. 302082, 302086, and 303052 are not very clear. Please provide sketches with explanations how the Code-required surface areas in these welds are not accessible for examination. Response: Rough weld area prohibits PT examination. See attached reports 2001M030, 2001M034 and 2001P056 and attached Isometric Drawing ISI-83C (Attachments 9, 10, 11, 12, and 13). For 2001M030, there is less than 2" gap between 5
pump and integral attachment weld pedestal, For 2001M034, Attachment 9 shows how the floor interferes with the inspection. Report for 2001P056 is included again, note the description of limitations on page 2. Part D: Pressure retaining welds in austenitic stainless steel or high alloy piping, Examination Category C-F-i, Item Nos. C5.11 & C5.21. Pursuant to 10 CFR 50.55a(g)(5)(iii), the licensee requested relief from Code-required surface and volumetric examinations for the pressure retaining welds in RHR Pump B discharge lines and SI test return line. In order for the proposed alternative to be considered, please provide the following: (1) For these welds, were any alternative inspection measures considered, such as examining surrogate welds, or performing a visual inspection to look for discoloration where the pipe is exposed or discoloration of the insulation near the weld, which could be indicative of degradation of the weld? If so, please provide the details of these inspections. Response: There are 377 C-F-1 welds in PI Unit 1 plant, 51 welds are examined during the 3"d Interval. The code requires 29 minimum welds or a total of 7.5 % of 3 77, P1 Unit I inspects 51 C-F-1 welds (the last 12 to be completed in the Fall 2002 outage). A VT-2 (visual examinations) is conducted during required functional pressure examinations. No indications have been observed from these inspections. (2) Please provide sketches or photos with sufficient details so that the staff could determine the interferences on accessing the Code-required surfaces and volumes for the subject welds. Response: See attached Sketches and inspection reports 2001 U013 (Attachment 14), 2001U034 (Attachment 15), and sketch for 2001U040 and 2001P070 (Attachment 16). (3) Table 1 of the licensee submittal indicates that the limitation for the weld W-18 is (PDI) single sided examination due to tee to valve configuration and for the weld W-1 is (PDI) single sided examination due to weld crown configuration. Explain with sketches or photos what kind of configuration problems are associated with each of these welds. Discuss the relationship of the configuration limitations with PDI and provide the reference of the PDI section. Response: See attached sketches and reports 2001 U013 (Attachment 14) and 2001U034 (Attachment 15). 10 CFR 50.55a(b)(2)(xv)(A), 10 CFR 50.55a(b)(2)(xv)G and 10 CFR 50.55a(b)(2)9(xvi), define new requirements for coverage and qualification demonstrations of UT Methods. These requirements affect both piping and RPV 6
examinations. The PDI UT methodology is in agreement with the Federal Code regarding single side access for piping. The Federal Code requires that if access is available the weld shall be scanned in each of the four directions (parallel and perpendicular to the weld) where required. Coverage credit may be taken for single side exams on ferritic piping. However, for austenitic piping a procedure must be qualified with flaws on the inaccessible side of the weld. The federal code requires that single side access examinations must demonstrate "equivalency to two sided examinations". Current technology is not capable of reliably detecting or sizing flaw on the inaccessible side of an austenitic weld, for configurations common to US Nuclear applications. Instead of a full single side qualification, PDI offers a best effort approach, which demonstrates that the best available technology is applied. This best effort approach does not meet the requirements of the Federal Code. PDI lists the limitation that single side examination is performed on a best effort basis. This requires the inaccessible side of the weld to be listed as an area of limited coverage. Hence for W-8 and W-1 austenitic welds the examination technique is only capable of a maximum coverage of 50%. The coverage limitation on these welds is further limited by OD contour configuration surface due to Tee to Valve (W-18), 49.2% and Weldolet to Pipe (W-1) geometry 39.18%. (4) The RHR pump "B" discharge pipe to penetration weld is claimed to be inaccessible due to penetration sleeve and welded restraint. Explain if the licensee has considered other alternatives, including radiography, visual examination. Provide details of the system pressure test requirements applicable to the components containing the subject welds. Response: VT-2 (visual examinations) and pressure test requirements are being performed and meet the code requirements for these welds. The RHR pressure test is performed at nominal operating pressure of greater than or equal to 350 psig for at least 10 minutes, the insulation may be in place. Radiography would require draining the system and would be an undue hardship. (5) Confirm that Code-required essentially 100% surface examination was performed for both W-18 and W-1 welds. Response: The surface examinations were performed to essentially 100%. Part E: Pressure retaining weld in carbon or low alloy steel piping, Examination Category C-F-2, Item No. C5.50. Pursuant to 10 CFR 50.55a(g)(5)(iii), the licensee requested relief from the Code-required surface examination for the Tee-Pipe Weld in the Main steam "B" line. In order for the proposed alternative to be considered, please provide the following: (1) Please provide sketches or photos with sufficient details so that the staff could determine 7
the interferences on accessing the Code-required surfaces and volumes for the subject weld. Response: See attached Sketches and report 2001M016 (Attachment 17). (2) Confirm that Code-required essentially 100% volumetric examination was performed for the weld W-9 (LSD2U). Response: Yes, greater than 90% UT coverage was achieved. (3) Provide details of the alternatives, including system pressure test requirements for the main steam line containing the weld, proposed and/or attempted by the licensee for the subject weld. Response: VT2 (visual examinations) and functional required examinations are performed each period. (4) The Examination Category C-F-2 and Item Number C5.50 refers to piping welds 3/8 inch nominal wall thickness for piping > NPS 4 and includes both circumferential weld (Item Number C5.51) and longitudinal weld (Item Number C5.52. Clarify the Code Item Number applicable to the tee-to-pipe weld in the main steam "B" line. Response: The W-9 (LSD2U) is a weld with both long seam and circumferential welds. the designator (LSD2U) indicates this. We use Code Case N-524 and we give this type of weld the ASME item number C5.50, which indicates both weld types. 8
UT Pipe Weld Examination Site/Unit: NSP Summary No.: Examination For / Pil 300514 ISI Procedure: Procedure Revlslon/FC: Work Order No.: 181-UT-16A 0 / 0010296 Applicable Code: 1989 ISO Drawing No.: ISI-12C Location: Containment
== Description:== RC PUMP - PIPE System ID: RC Component ID: W-1 Size/Length: 2.0" 1101" ThicknessiDiameter: 2.5" / 32" Limitations: One aided examination due to pump to pipe configuration. Start Time: 08:50 Finish Time: 11:00 Report No.: 2001 U039 Page: I of 3 Examination Surface: Inside r Outside [j Surface Condition: Flat Lo Location: Top Dead Center Wo Location: Centerline of Weld Temp. Tool Mfg.: Telatemp Serial No.: NSP 125 Cal. Sheet No.: 2001CA085, 2001CA086, 2001CA087 Topped Couplant: Sonotrace 40 Batch No.:
- 00143 Surface Temp.:
70 'F U 1 40 45 60 45 RL N/A 56.5 66.9 66.1 75.5 Yesfl No 0 Scan Coverage: Upstream E0 Downstream CW66 CCWF!/ Results: NAD R IND [] Percent Of Coverage Obtained > 90%: GEO F] No Reviewed Previous Data: Examiner Level Date Reviewer Potter, Michael E. / 211512001 Hailing, David A. Examiner Level 11~lntue Date Site Review Coburn, Timothy M. / 2/1512001 Clay, Sean P. Other Level NIA I signature Date ANII Review Signature N/A /Clw, Ron MWP Angle use0 Scanning dB Indication(s): Comments: None Yes Date Date Date -0 -4,
Supplemential Report AT-r-rACHtAe-rf a611'2 AL4 Report No.: Page: Summary No.: 300514 Examiner Potter, Michael E. Examiner Cobum, Timothy M. Other N/A Level: II Reviewer Hailing, David A. Level: II Sit. Review: Clay, Sean P. i e Level: NIA ANII Review. Clow, Ron 2001U039 2 of 3 Date: Date:" /6( D::ate:,.*///W'o0L Comments: None Sketch or Photo: G:UDDEAL50XPIIRFO20011UT - Supplementa[2OOlUO39-1.bmp Le'5'TOIAR pAe~ aivde" E&;)mw?,kI76Id V P $TOa1A*ft -* C dCAe-.W&4 f& J S edJ 4. MW e I i I
~4 T-rAC/IM eA/-r#1 Determination of Percent Coverale for UT Examinations -Pipe Site/Unit: NSP / PH1 Summary No.: 300514 Examination For: ISl Report No.: 2001U039 Procedur'e: ISI-UT-16A Page: 3 of 3 Procedure Revision/FC: 0 / Work Order Nb.: 0010296 45 deo0 Scan 2 0.000 % Length X 0.000 % volume of length 100 = 0.000 % total for Scan 2 Scan 2 100.000 % Length X 100.000 % volume of length 1100 100.000 % total for Scan 2 Scan 3 100.000 % Length X 50.000 % ýolume of length / 100 = 50.000 % total for Scan 4 Scan 4. 0.000 % Length X 0.000 % Olume of length I 100) = 0.000 % total for Scan 4 Add totals and divide by # scans
- ý
/6 total for 45 deg Other deg - 45 R. (to be used for supplemental scans) The data to be listed below is for coverage that was not obtaine~d with the 45 deg scans. Scan 1 0.000 % Length X 0.000 %Ivolume of length 100 = 0.000 %total for Scan 1 Scan 2 100.000 % Length X 5.400 %,volume of length 1100 = 5.400 % total for Scan 2 Scan 3 0.000 % Length X 0.000 %1volume of length / 100 = 0.000 % total for Scan 3 Scan 4 0.000 % Length X 0.000 %Ivolume of length 1100 = 0.000 % total for Scan 4 Percent complete coverage Add tolals for each scan required and divide by # of scans to dfitermine; 3ý8. % Total for complete exam -7 _L 1 Site Field Supervisor: b iý .,r w N.F I Date: C;)211&191
Limitation Record Site/Unit: ,&e / P.r / Summary No.: .5O05'14 Workscope: 15i Procedure: Procedure Revision/FC: Work Order No.: f$(-,7-/4 4 c2 I Outage No.: P/> I fŽF=o/ Report No.:
- Zoo/
0 .e Page: of Description of Limitation: W~ri-o -1F0/pr 4AW O FE'J 16-c.C COIO& naer10 PA&#l I/8T, St4iol,d6 c,mgeoAI tM~m -sl/O6 e)P bkIeio i. Sketch of Limitation: RE'C 70 Pc,~ Limitations removal requirements: AtoA/E~ A/orE-r ,4011OU60 F4 41 Ws5 PFAF0fog6 4 £ ~ ae P o1I AIC( 510C-ad-'IY, TJ/ Tr5,d-4d A uGS PROL/:O BY' Peot uit C 5/ -, Mr- /4,,f Re-O wlEi usco ,FofL A Aesr EFFola-Gx*A r4O1 i Ft.4t3 oW "T 7HC FcA #- slo ex wEt-O Radiation field: / Examiner Level Signature Date Reviewer LU' 2 Si natu e V,,L-Date Examiner Level Signature Date Site Review Signature Date / L Other Level Signature Date ANII Review Signature Date / /
UT Pipe Weld Examination Site/Unit: Summary No.: Examination For:. NSP / P1I 300130 IS' Procedure: Procedure Revision/FC: Work Order No.: ISI-UT-16A 0 / Applicable Code: 1989 ISO Drawing No.: ISI-2 Location: RCP 11 Vault
== Description:== VALVE - PIPE System ID: RC Component ID: W-6 Size/Length: 1.10" 140.76" ThicknesslDiameter: 1.30" / 12" Limitations: Single Side Access Start Time: 09:50 Finish Time: 10:30 Report No.: 2001U004 Page: 1 of 5 cxaminaiion Lo Location: Temp. Tool M Cal. Sheet No Angle Used Scanning dB Indication(s): urnace: Insiae O OUtside Li Top Dead Center Wo Location: fg Telatemp Serial No.: 2001CA010, 2001CA0t1, Surface Condition: Ground Flush Centerline of Weld Couplant: Sonotrace 40 Batch No.:
- 98243 NSP 125 Surface Temp.:
80 OF 2001CA012 45 45T 60 45 RL 45TRL .,3 557.1 73.6 63.0 59.0 0 Yes R] No [3 Scan Coverage: Upstream Z Downstream F6 CW 9 CCW'7 Comments: 60 Degree RL examination performed at reference dB due to excessive noise level. Results: NAD D-IND E Percent Of Coverage Obtained > 90%: GEO w7 4. UP
IMP Site/Unit: NSP / P11 Summary No.: 300130 Examination For: ISl Ultrasonic Indication Report Procedure: Procedure Revision/FC: Work Order No.: Report No.: 2001U004 Page: 2 of 5 ISI-UT-16A 0 / 0010296 )'a I
Supplemental Report A-r-34 V Report No.: Page: Summaty No.: 300130 Examiner. Timm, Jeremy T. Level: II Reviewer Hailing, David A. Examiner WA Level: NIA Site Review. Clay, Sean P. Other NFA Level: WA ANII Review: Clow, Ron 2001U004 3 of 5 Date: _____,__ Date: Llaah~ Date: //Sd/ Comments: Indications I and 2 - ID Root Geometry 360 Degree Intermittent. ID of pipe verified with 0 degree transducer. Sketch or Photo: G:IDDEALS0OPl1RFO201\\UTr-Supplementaf2001U004-1.bmp \\/VALVE-SWýF" FLow VAL V E 6oORL 5 V -"p r I I
Ip Site/Unit: NSP / P1 Summary No.: 300130 Examination For ISI Limitation Record Procedure: Procedure Revision/FC: Work Order No.: ISI-UT-16A 0 / 0010296 Report No.: 2001U004 Page: 4 of 5 Description of Limitation: Single side access due to valve to pipe configuration. Sketch of Limitation: G:'dDDEAL50PIIRFO2001WT - Supplemental2200iU004-2.bmp FLOW Limitations removal requirements: 60 mRlhr Radiation field: Examiner Level iI Sig"Date Reviewer Signatte Date Timm, Jeremy T. / 512001 Hailing, David A. I bf/,/l Examiner Level NIA Signature Date Site Review Signature Date N/A / Clay, Sean P. /. / Other Level NIA Signature Date ANII Review re Date N/A _ Clow, Ron I
EW Determination of Percent Coverage for UT Examinations - Pipe Site/Unit: NSP / P11 Summary No.: 300130 Examination For: ISI Procedure: Procedure Revision/FC: Work Order No.: Report No.: 2001U004 ISI-UT-16A Page: 5 of 5 0 / 0010296 Scan 1 0.000 % Length X 0.000 % volume of length / 100 = 0.000 % total for Scan 1 Scan 2 100.000 % Length X 100.000 % volume of length / 100 = 100.000 % total for Scan 2 Scan 3 100.000 % Length X 50.000 % volume of length / 100 = 50.000 % total for Scan 3 Scan 4 100.000 % Length X 50.000 % volume of length / 100 = 50.000 % total for Scan 4 Add totals and divide by # scans = 50.000 % total for 45 deg Other deg - 60 (to be used for supplemental scans) The data to be listed below is for coverage that was not obtained with the 45 deg scans. Scan 1 0.000 % Length X 0.000 % volume of length! 100 = 0.000 % total for Scan I Scan 2 100.000 % Length X 100.000 % volume of length / 100 = 100.000 % total for Scan 2 Scan 3 0.000 % Length X 0.000 % volume of length t 100 = 0.000 % total for Scan 3 Scan 4 0.000 % Length X 0.000 % volume of length / 100 = 0.000 % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; ?V..-?*000 % Total for complete exam Site Field Supervisor I J-* Date:
A4-77,-/4ew-r-Z2 pc5Lf 4 (( N*5) Limitation Record Site/Unit: A/1p / PAr 1 Summary No.: 30 0 130 Workscope: S / Procedure: ,3.,' - w4 r'-1& 4 Procedure Revision/FC: 9 / Work Order No.: 00/0 2f 6( Outage No.: P* / RF zoo / Report No.: Aoo/l O0 C/ Page: of Description of Limitation: wAJEo --olvr 4N'o &,ovm2owce,Jr 6~ct ~~T Pzto 61,,.4r &LIA, M, Fto,,M 7'9'C-UPeroCve-r 5/0o oF wC Sketch of Limitation: Ij. Lo 4'.ý / 1 -9 tlx Limitations removal requirements: IVWE A)OT hLTMOWJ0I C-XA!Al 4w4S PEAPOkIM6O
- Fclo, ONC-5,OE 0*-J(Y 710W rECAfAAJIU63 P~eouitDC4 0Y jP42c(o&-04eC Rb,,r-6,0 W-4 we, Radiation field:
,jc Examiner Level Signature Date Reviewer shI,..1g-- natur..,I ar Date Examiner Level Signature Date Site Review G Signature Date I / S.. - '- a *' '; -- t.. e...... dI * - Other Level Signature Date ANII Review I I Signature / /
M7 Site/Unit: NSP / P11 Summary No.: 301'070 Examination For: ISI UT Vessel Examination Procedure: ISI-UT-3 Procedure Revision/FC: 9 I Work Order No.: 0010296 Report No.: 2001U010 Page: 1 of 5 Applicable Code: 1989 ISO Drawing No.: ISI-438 Location: Containment
== Description:== SHELL - TRANSITION System ID: SG Component ID: W-E Size/Length: 527" Thickness/Diameter: 3.15" Limitations: Restraint Ring Start Time: 14:05 Finish Time: 18:20 Examination Surface: Inside Ej Outside [I Surface Condition: Buffed Lo Location: Feedwater Nozzle Wo Location: Centerline of Weld Couplant: Sonotrace 4o Batch No.:
- 00143 Temp. Tool Mfg.:
Telatemp Serial No.: NSP 182 Surface Temp.: 80 OF Cal. Sheet No;: 2001CA026, 2001CA027, 2001CA028 Angle Used 0 45 45T 60 60T Scanning dB 42.2 43.6 43.6 68.0 68.0 Indication(s): Yes W. No E] Scan Coverage: Upstream R Downstream [ CW [O CCW [] Comments: Restraint ring prohibited scanning from downstream side of weld. Results: NAD [] IND r-GEO Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level 11 ,(}8 . gnatu. Date Reviewer SignatureDae Griebel, David M. / 112912001 Halling. David A. I '. A ,\\ ( D I n Examiner Level N/A Signature Date Site Review S, najure Date NIA Clay, Sean P. / /3/o flthar Akilt %1-A A LNlA P4II tReview Clow, Ron I p ~i1'tureDate -.4 .7 7 : '. ",,.ý 1! - ".. F6.,., I TP41 pit V* I* ur cLL Idat*e
SitefUnit: NSP 1 P11 Summary No.: 301070 Examination For. 1S1 Ultrasonic Indication Report Procedure: Procedure Revision/FC: Work Order No.: Report No.: 2001U010 Page: 2 of 5 ISI-UT-3 9 I 001029$ Search Unit Angle: 45160 Wo Location: Weld Centerline Lo Location: Feedwater Nozzle 0 o Piping Welds (, Ferrdtic Vessels > 2"T o Other MP Metal Path Wmax Distance From Wo To S.U. At Maximum Response RBR Remaining Back Reflection W1 Distance From Wo At Of Max (Forward) L Distance From Datum W2 Distance From Wo At Of Max (Forward) Sample Indication C 0o Winax L IW I" "LO
- *i ax Scan Indication W
Forward Backward L L L2 RBR Remarks No. Of Max Of Max Of Max Of Max Of Amp. DAC W MP W1 MP W2 MP Max Max 3 1 141 CL 4.2 14.7 45 Degree - ID Geometry 4 2 159 CL 4.4 14.5 45 Degree - ID Geometry 3 3 80 CL 7A 15.0 62 Degree - ID Geometry 4 4 100 CL 7.3 14.1 62 Degree - ID Geometry Grib,, Dai M. 119100 Haln ,DaiA..uDl L" Examiner Level II y* .ignature /**Date Reviewer ~ 1 S" turn Dat Examiner Level NIA Signature 7 Date Site Review Sgnature .Date CNaA C Sean P. Other Level N/A Signature Date ANI! Review Signature Date NIA I Clow, Ron iý T 12 ý I
mnW efermination of Percent Coverage for UT Examinations - Vessels Site/Unit: NSP / Pil Summary No.: 301070 Examination For: ISI Procedure: Procedure Revision/FC: Work Order No.: Report No.: 2001UO10 ISI-UT-3 Page: 3 of 5 9 / 0010296 0 deg Planar Scan 100.000 % Length X 91.800 % volume of length / 100 = 91.800 % total for 0 deg 45 deg Scan 1 100.000 % Length X 93.500 % volume of length / 100 = 93.500 % total for Scan I Scan 2 100.000 % Length X 2.650 % volume of length ( 100 = 2.650 % total for Scan 2 Scan 3 100.000 % Length X 91.800 % volume of length / 100 = 91.800 % total for Scan 3 Scan 4 100.000 % Length X 91.800 % volume of length /100 = 91.800 % total for Scan 4 Add totals and divide by # scans = 69.938 % total for 45 deg Other deg 62 Scan 1 100.000 % Length X 93.500 % volume of length / 100 = 93.500 % total for Scan 1 Scan 2 100.000 % Length X 6.450 % volume of length 1100 = 6.450 % total for Scan 2 Scan 3 100.000 % Length X 91.800 % volume of length /100 = 91.800 % total for Scan 3 Scan 4 100.000 % Length X 91.800 % volume of length / 100 = 91.800 % total for Scan 4 Add totals and divide by # scans = 70.887 % total for 62 deg Percent complete coverage Add totals for each angle and scan required and divide by # of angles to determine; 77.542 % Total for complete exam Note: Supplemental coverage may be achieved by use of other angles / methods. When used, the coverage for volume not obtained with angles as noted above shall be calculated and added to the total to provide the percent total for the complete examination. Date: I2/C53/i( Site Fiekl Supervisor:
W1 Summary No.: 301070 Examiner Griebel, David M. Examiner: WA Other NIA Supplemental Report ttjdLqLtt (0s Report No.: 2001 U010 Page: 4 of 5 Level: II Reviewer: Hailing, David A. Level: NIA Site Review: Clay, Sean P. Level: N/A ANII Review: Clow, Ron Date: Date: Date:,_/___ Comments: Indication Plot Sheet-Scale 2:1 Sketch or Photo: G:\\IDDEAL50PI1RFO2001\\UJT - Suppterental\\2001U010-1.bmp A%O. ' __ rL j.$A 3 WD. 46o WEViLO/,M'
FU' Summary No.: 301070 Examiner. Griebel, David M. Examiner NIA Other NIA Supplemental Report Report No.: 2001U0o1 Page: 5 of 6 Level: II Reviewer: Hailing, David A. Level: NIA Site Review. Clay, Sean P. Level: NIA ANtI Review: Clow, Ron Date: Z1.3(ok Date:11& Date:
- /o-l/
Comments: Examination Coverage Plot-Scale 2:1 Sketch or Photo: G:AIDDEALSO\\PIIRFO2001\\UT - SupplementalS200lUO10-2.bmp °, J
NN 6%Limitation Record Site/Unit: Summary No.: Workscope: 1V5P' P.C / 3$i070 )*/ Procedure: /,1 -,.'r-3 Procedure Revision/FC: 9' / Work Order No.: 4;O/J Outage No.: /ZO-/,F 700 / Report No.: 7,00/ a OIO Page: of Description of Limitation: RE6sTr4,4/,rjI R/V 6C L./ rv7 i IAI 41t4ý. 4bi *e~re/o"0V! j 44c(s. Sketch of Limitation: WLO - PESTk4Ii1 L r'A Limitations removal requirements: RESg,4-17-d )/Z4, V JL(& z Radiation field: ,2.0 "P.lq 0%S-#,W7 Examiner Level Signature Date Reviewer Signat re /Y P. K'je / Examiner Level Signature Date Site Review Signature Date I / Other Level-Signature "Dai*ei iAN Rei,&e-w Signature Date / I ,4 ft",14 Jff 3 )ia-,Y-IV- & / /
UT Pipe Weld Examination Site/Unit: NSP / Pil mary No.: 303054 Procedure: Procedure Revision/FC: ISI-UT-16 13 1 Report No.: 2001 U029 Page: 1 of 6 Work Order No.: 0010296 Applicable Code: 1989 ISO Drawing No.: ISI-93B Location: RHR 12
== Description:== SHELL - FLANGE System ID: RH Component ID: W.2 Size/Length: .85"/75.40" Thickness/Diameter: 0.50"/24" Limitations: See attached sheets. Start Time: 13:00 Finish Time: 15:45 Examination Surface: Inside Ej Outside W, Surface Condition: As Welded Lo Location: Centerline of Outlet Wo Location: Centerline of Weld Couplant: Sonotrace 40 Batch No.:
- 00143 Temp. Tool Mfg.:
Telatemp Serial No.: NSP 162 Surface Temp.: 85
- F Cal. Sheet No.:
2001CA062. 2001CA063, 2001CA064 Angle Used 0 45 45T 60 70 7ORL Scanning dB j N/A 51.0 57.0..I N/A 1 56.0 67.0 Indication(s): Yes [] No fl Scan Coverage: Upstream [] Downstream I-CW ] CCW Comments: See attached sheets for Indication and coverage plots. Results: NAD Li IND f] GEO 0_ Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes Examiner Level II gnature Date Reviewer ,g ature Date Johnson, Jeffery M. / 2/6/2001 Auer, Robert G. Examiner L I i-ignature Date Site Review Signature Date Hailing, David A. 1 (* -{ 21612001 Clay, Sean P. / //* ( Other Level NIA Signature \\ Date ANII Review ignature Date N/A / Clow, Ron I -/ /, -k hIP Sum I -
Site/Unit: NSP O 11 Summary No.: 303054 Examination For: 131 Ultrasonic Indication Report Procedure: Procedure Revision/FC: Work Order No.: Report No.: 200lU029 Page: 2 of 6 ISI-UT-16 13 1 0010296 Search Unit Angle: 45 Wo Location: Weld Centerline Lo Location: Centerline of Outlet 0 0 Piping Welds 0 Ferritic Vessels > 2"T Other Aust Vessel MP Metal Path Wmax Distance From Wo To S.U. At Maximum Response RBR Remaining Back Reflection WI Distance From Wo At Of Max (Forward) L Distance From Datum W2 Distance From Wo At Of Max (Forward) Urns I. U Samplc Ind wo Wimax Ilcation CL I WI W2 I/ LO Lmax 12a Scan Indication I W Forward Backward L1 L L2 RBR Remarks No. Of Max Of Max Of Max Of Max Of Amp. DAC W MP W1 MP .W2 MP Max Max 3 50% -.6 .806 18.75 ID Attached Divider Plate 4 2 60% -.5 .805 19.26 ID Attached Divider Plate 3 3 80% -.5 .805 55.75 ID Attached Divider Plate 4 4 60% -.5 .805 56,25 ID Attached Divider Plate Examiner Level inaueDate Reviewer dSgaure Dt Johnson, Jeffery M. / 2,6/2001 Auer, Robert G. Examiner Level 11 gnate Date Site Review.. Signature Date Hailing, David A. 21612001 Clay, Sean P. e.. N/A I / Signature uale AN11 Kev ew I Clow, Ron Date NIA Igi, re
- ~ ~~
~ ,,,ignature ., TC
up Summary No.: 303054 Examiner: Johnson, Jeffery M. Examiner Hailing, David A. Other: N/A att"A4,$Ot 4 AteX -3 Supplemental Report Report No.: Page: Level: II Reviewer: Auer, Robert G. Level: II Site Review: Clay, Sean P. Level: NIA ANII Review: Clow, Ron 2001U02g 3 of 6 Date-:-7 _15p Date:2A __L Comments: 45 Degree ID Geometry Indications of Divider Plate Sketch or Photo: G:1IDDEAL50PI1RFO2001\\UT - SupplementaR2001U029-1.bmp L*5
- 45° I
- 5. H*_I_.
I.
w77-Summary No.: 303054 Examiner: Johnson, Jeffery M. Examiner: Hailing, David A. Other: WA Comme its: None 1Pr4-wte9; Supplemental Report Report No.: 2001 U02 Page: 4 of 6 Level: 11 Reviewer: Auer, Robert G. Date: Zi __0-a Level: If Site Review: Clay, Sean P. Date:2h/ Level: WA ANII Review. Clow, Ron Date:./4~ Sketch or Photo: G:UDDEiApL1 TIRFO200I\\Ur. Supplementait2OO1 U029-3.bmp I "WLA OCI~rLOT &1u 31"~ L8 0V* d~~ 1" DO~ZLlmmTub I.- I2 2 0 ~ ra L2 J 4w-- ib~ B IF CT 104A :CR1j5 S1ihE *~tW rWAt-t Lift~ icJ.ý -1 FX0ort U-fLRIPTO (Yz 04obv) u-P sxr~eAr J. I.Ml rA 1 -093$s I I 1 MZO4L67 $1 I
- 1
DeDtermination of Percent Coverage for UT Examinations - Pipe SitelJnit: NSP / P11 Summary No.: 303054 Examination For: ISI Report No.: 2001U029 Procedure: ISI-UT-16 Page: 5 of 6 Procedure Revision/FC: 13 / Work Order No.: 0010296 45 dej Scaar 1 63.000 % Length X 25.620 % volume of length / 100 = 16.141 % total for Scan I Scan 2 63.000 % Length X 33.810 % volume of length / 100 = 21.300 % total for Scan 2 Scan 3 63.000 % Length X 100.000 % volume of length 1100 = 63.000 % total for Scan 3 Scan 4 0.000 % Length X 0.000 % volume of length 1100 = 0.000 % total for Scan 4 Add totals and divide by # scans = 25.110 % total for 45 deg Other -eg - 70 (to be used for supplemental scans) The data to be listed below is for coverage that was not obtained with the 45 deg scans. Scan 1 Scan 2 Scan 3 Scan 4 63.000 % Length X 13.620 % volume of length / 100 = 8.581 % total for Scan 1 0.000 % Length X 0.000 % volume of length / 100 = 0.000 % total for Scan 2 0.000 % Length X 0.000 % volume of length / 100 = 0.000 % total for Scan 3 0.000 % Length X 0.000 % volume of length / 100 = 0.000 % total for Scan 4 Percent complete coverage Add tolals for each scan required and divide by # of scans to determine; 27.255 % Total for complete exam Site Field Supervisor:. Date: r
1 77-P Site/Unit: NSP I P11 Summary No.: 303054 Examination For: ISI aJd&,L7 ' Limitation Record Procedure: Procedure Revision/FC: Work Order No.: LeaIpUnJf I uk Lij-avon: Coverage Plot Sketch of Limitation: GAIDDEAL5OPlI RFO20OI\\UT - SuppIememtaI\\2O1U029-.2.bmp 1 4.I. f "V,, Lw-- e 4--IJ. W L44% e. ~ow~./ %Tge-** Limitations removal requirements: -None Radiation field: <1 mR/hr Examiner Level ii Sign ture Date Reviewer Date Johnson, Jeffery M. I/ý 2.1612001 Auer, Robert G. ~Examiner Level 11 Sig 9 ~ Date Site Review Dt Hailing, David A. / 21612001 Clay, Sean P. I rOther Level NIA Signature Date ANII Review Date NIA Clw Ron / r91_1f_1a/z Report No.: Page: ISI-UT-16 13 / 0010296 2001U029 6 of 6 f j
O. LOOKING DOWN
- .12 RHRH.EAT EXCHANGER
= HANGER NO. (D -WELD NO. REF: XH-1-215 IWP'(M&*sP)- Pi 1 DWN:TM-CHKD %ZVQTCkA. Dcromt i A CONT. ON ISI-550 55 (0 (A w CONT. ON ISI-55D)
CONT. ON ISI-51A ) MAIN STEAM LOOP 'A' - HANGER NO, = WELD NO. I ( _ - / / REF: XH-1 06-242 ISP ,M&Sp)- PI 1 ISI DWN: CADWorks CHKD: APPD: "-Y SYSTEM: MAIN STEAM LINE: 31-MS-1 IDWG: ISI-51B REV: 03 24 r~ll -FwI I 11.511::1PN* ORTI
I17444.e(<~ 3/ 47i
- 12 STEAM GENERATOR GUARD pip--
CONT. ON I-q-68B MAIN STEAM LOOP 'B' REF: XH-106-241 = HANGER NO. IFILE NO: is[ NAVCO WEST = WELD NO. I .P (M&sp)- P1 1 1St ID W N.: M..... C,.-:K D :.A PP D.: __, S SYS TEM-M, lA I STEA M LINE: 30-MS--2, 31--MS-2 DWG: ISI-68-A !REV:-0,4-
/ad~ '5l /V! / OSRTl NAVCO =HANGER NO. FEEIDWATER LOOP 'B' Q =WELD NO. REF: XH-1 06--130 IFILE NO: 11169R0l KSP (M&sR)- Pl. 1 ISI DW-CADWorks CHKD: APPD: m SYSTEM:v FEEDWATER LINE: 1S-FW-16 ______________________DWG-: ISI-69 REV:7 01 I IS
14-A 77'4c/ W~~7 ýfqc WI Site/Unit: Summary No.: Examination For. Magnetic Particle Examination NSP / P11 301258 ISi Report No.: 2001M034 Procedure: IS1-MT-1 Page: 1 of 3 Procedure Revision/FC: 11 I Work Order No.: 0010296 Applicable Code: 1989 ISO Drawing No.: ISI-52 Location: Containment
== Description:== BEAR'G BRAK ASSY System ID: FW Component ID: H-7 Size/Length: 16" Limitations: See Comments Light Meter Mfg.: N/A Serial No.: NIA Illumination: NIA uw/cfrr Temp. Tool Mfg.: N/A Serial No.: NIA Surface Temp.: <600 F Gray Card (if used): Not Used Cal Block Serial No.: NIA Surface Condition: As Welded Lo Location: Centerline of Downstream Elbow Field Orientation: Longitudinal Magnetic Particle Material Brand: Magnaflux Wet [] Mixed: Yes El Applied By: Dusting &d Type: No. 1 Gray Dry W No V Spraying nI Batch No.: 84A047 Fluorescent EL With: Flooding [] Equipment: Magnaflux Serial No.: LMT YK-1 I Head Shot [] Amperes Fixed Spacing El AC &d DC [] Adj. Spacing W 2 -6 inches Encircling Coils nI N/A Turns Prods. Spacing [] inches Current (machine setting) Li N/A Amperes Indication Loc Loc Diameter Length Type Remarks No. L W R/L Comments: See attached limitation sheets. Results: NAD,] IND F__ Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: No Examiner Level II 11* ay Date Reviewer ,)S"gnaturb Date Auer, Robert G. 2M19,2001 Hailing, David A. l (ia/ea Examiner Level N/A Signature Date Site Review Sign/+/- re-Date W/A I Wren, Jery P. I (r4.Z- .?A--0. Other Level N/A Signature Date ANII Review re Date WA I Clow, Ron c
-Wp Site/Unit NSP / P11 Summary No.: 301258 Examination For. 181 Limitation Record Procedure: Procedure Revision/FC: Work Order No.: ISI-MT-l 11 1 0010296 Report No.: 20011M034 Page: 2 of 3 Description of Limitation: Floor penetration prohibits examination of the middle 12" of the two vertical welds on the pipe collar. 2 Circ Welds = 58" L x 2.5" W. 2 Vertical Welds = 16" L x 3" W. Sketch of Limitation: G:NIDDEAL500PI1 RFO2001\\VT - SupplementalA2001 M034-1.bmp Limitations removal requirements: None Radiation field: <2 mRlhr Examiner Level I1 1S tu9 Date Reviewer Si 9,atu Date Auer, Robert G. I 2119/2001 Hailing, David A. I c =-Z '2./., Examiner Level N/A kafgnature Date Site Review Sig tur Date NIA -Wren, Jerry P. / , a I2--U-sl Other Level NIA Signature Date IANII Review ure Date NIA Clow, Ron I
100f9ons RIP Determination of Percent Coverage for Surface Examinations Report No.: 2001M034 Site/Unit: NSP I Pi1 Summary No.: 301258 Examination For ISI8 Procedure: Procedure Revision/FC: Work Order No.: ISI-MT-1 11 1 0010296 Page: 3 of 3 Area Required (as shown in applicable code reference drawing) Length 128.000
- Width 3.016
= Total Area required 386.048 square inches Coverage Achieved Area examined 314.000 sq. in. / Total area required (100%) 386.048 sq. in. = Percent coverage 10- % (area required - area of limitations area examined) To determine length of a circumferential weld Note - Diameter refers to actual external diameter not pipe size (see table below) Diameter 0.000
- (Pi) 3.1416
= Length 0.000 inches Pipe Actual (Length) Pipe Actual (Length) Size Diameter Circumference Size Diameter Circumference 2 2.375 7.46 12 12.75 40.06 2.5 2.875 9.03 14 14.0 43.98 3 3.5 11.0 16 16.0 50.27 3.5 4.0 12.57 18 18.0 56.55 4 4.5 14.14 20 20.0 .62.83 5 5.563 17.48 22 22.0 69.12 6 6.625 20.81 24 24.0 75.40 8 8.625 27.10 30 30.0 94.25 10 10.75 33.77 I Site Field Supervisor ý ký £.* LI/ Date: 2 20 0 1-
Limitation Record N7-) Py J9- , 1/2L Site/Unit: ,v.&p,/ p1 I SummaryNo.: 13 6 ' a Workscope: 1 $ I Procedure: 161 - T'r-/ Procedure Revision/FC: Work Order No.: // / 12O/O29 Outage No.: Pr/
- F,2?Cj/
ReportNo.: 1,-00//I'f lQ Page: of Description of Limitation: OeC' pfpc: CVe-4cAt Sketch of Limitation: )ý4ett 461LIF jAJ&-t-> K ToP V, iEw S...... I. Limittion rpv
- u Radiation field:
Examiner Level Signature Date Reviewer L.,. L7'- -...- Signature/ Date I~Jam wFi4z F e (J(I Y-O04 Examiner Level Signature Date Site Review ( Signature Date / / LeVeI uLner oignature uaie ANII Review Signature L'ide /
Sitne/ Magnetic Particle Examination /(' / Wnit Summary No.: Examination For: NSP I Pi1 302082 ISl Procedure: Procedure Revision/FC: Work Order No.: ISI-MT-1 0010296 Report No.: 2001M030 Page: 1 of 3 Applicable Code: 1989 ISO Drawing No.: 11-83C Location: Aux Bldg
== Description:== Support E System ID: Sl Component ID: H-5 Size/Length: 1.0" 114.0" Limitations: See attached sketch. Light Meter Mfg.: N/A Serial No.: N/A Illumination: N/A uw/cm2 Temp. Toot Mfg.: N/A Serial No.: N/A Surface Temp.: <600 0F Gray Card (if used): Not Used Cal Block Serial No.: N/A Surface Condition: As Welded Lo Location: Drive Side Field Orientation: Longitudinal Magnetic Particle Material Brand: Magnaflux Wet [] Mixed: Yes E] Applied By: Dusting W Type: 8A Red Dry.1 No W Spraying MI Batch No.: 92B062 Fluorescent [E Vrth: Flooding [] Equipment Parker Research Serial No.: 7081 Head Shot nl Amperes Fixed Spacing [] AC W DC ] Adj. Spacing Wj 2-6 inches Encircling Coils n N/A Turns Prods. Spacing [] inches Current (machine setting) [] NIA Amperes Indication LoG Loc Diameter Length Type Remarks No. L W R/L .- Comments: None Results: NAD 66 IND EL Percent Of Coverage Obtained > 90%: N, Reviewed Previous Data: No Examiner Level I1 1 Sig re Date-Reviewer Signature Date CobumSii Tioh I /* /4/2001 Hailing, David A. /(fI. Q Z //a Examiner Level 11 Date Site Review Signature Date Auer, Robert G. I -2)14/2001 Wren, Jerry P. -'&JA, '- 11-01 Other Level N/A 9jature Date ANII Review .re /,/Date NA Clow, Ron 0
lI" Site/Unit NSP I PH1 Summary No.: 302082 Examination For ISI Limitation Record Procedure: Procedure Revision/FC: Work Order No.: ISl-M'-1 11 I 0010296 a/ Xk15L4
- F1%3 Report No.
Page: 2001M030 2 of 3 uL.Jsucbipui 01 Limnauon: Configuration prohibits examining weld at inside of support. Sketch of Limitation: a =ýW G:AlDDEAL50PIIRFO2001VMT - Supplementa2001 M030-1.bmp 15 R--,-,J SIDE> .JC,- -ft dc. a C. -I Limitations removal requirements: None Radiation field: <1 mR/hr Examiner Level 1 Sig re Date Reviewer gria Date Coburn, Timothy M. I 2( 1 Hailing, David A. I 0 = Examiner Level II Date Site Review Signature4 Date Ather, Robert G. / 211412001 Wren, Jerry P.ei (/- LJAr Date Other Level NIA Signiature Date ANII Review Vure Date rWA
- IClow, RonI r
t e t.,;o 7;:,= POPA-k
Determination of Percent Coverage for Surface Exa'minations Site/Unit NSP I P1 Summary No.: 302082 Examination For IM Procedure: Procedure Revision/FC: Work Order No.: Report No.: 2001M030 ISI-MTI-Page: 3 of 3 t1 / 0010296 Area Required (as shown in applicable code reference drawing) Length 14.000
- Width
= Total Area required 28.000 2.000 square inches Coverage Achieved Area examined 20.000 sq. in. /Total area required (100%) 28.000 sq. in. Percent coverage _DJ44r % (area required - area of limitations = area examined) <*' To determine length of a circumferential weld Note - Diameter refers to actual external diameter not pipe size (see table below) Diameter 0.000 (Pi) 3.1416 = Length 0.000 inches Pipe Actual (Length) Pipe Actual (Length) Size Diameter Circumference Size Diameter Circumference 2 2.375 7.46 12 12.75 40.06 2.5 2.875 9.03 14 14.0 43.98 3 3.5 11.0 16 16.0 50.27 3.5 4.0 12.57 18 18.0 56.55 4 4.5 14.14 20 20.0 62.83 5 5.563 17.48 22 22.0 69.12 6 6.625 20.81 24 24.0 75.40 8 8.625 27.10 30 30.0 94.25 10 10.75 33.77 1 Site Field Supervisor. Date: Z---fl--o( w Site Field Supervisor; Date: 7_.-'(1---o
w Site/Unit Summary No.: Examination For: /rýýekffthe#?L Magnetic Particle Examinii n/ NSP / Pil 301258 IS' -Procedure: Procedure Revision/FC: Work Order No.: Report No.: 20011m034 ISI4ATI Page: 1 of 3 11 I -2 0010296 Applicable Code: 1989 ISO Drawing No.: ISI-52 Location: Containment
== Description:== BEAR'G BRAK ASSY System ID: FW Component ID: H-7 Size/Length: 16" Limitations: See Comments Light Meter Mfg.: N/A Serial No.: WA Illumination: N/A uw/cm2 Temp. Tool Mfg.: WA Serial No.: WA Surface Temp.: <600 F Gray Card (if used): Not Used Cal Block Serial No.: N/A Surface Condition: As Welded Lo Location: Centerline of Downstream Elbow Field Orientation: Longitudinal Magnetic Particle Material Brand: Magnaflux Wet [] Mixed: Yes [] Applied By: Dusting [ Type: No. I Gray DryI No Spraying [] Batch No.: 84A047 Fluorescent [] With: Flooding F] Equipment: Magnaflux Serial No.: LMT YK-1 I Head Shot D Amperes Fixed Spacing LI AC W DC [] Adj. Spacing W 2-6 inches Encircling Coils LI NIA Turns Prods. Spacing [] inches Current (machine setting) [] NIA Amperes Indication Loc Loc Diameter Length Type Remarks No. L W RJL -Comments: See attached limitation sheets. Results: NAD W IND [] Percent Of Coverage Obtained > 900/*: No Reviewed Previous Data: No Examiner Level 11 ,j,4Si tJ Date Reviewer Signatur* Date Auer, Robert G. /* 211912001 Halling, David A. I reJ4 A (2.0/of Examiner Level /A Signature Date Site Review signpure 1 Date WA I Wren, Jerry P. I ((L.( Z.-- Other Level N/A Signature Date JANII Review re Date ClA / Clow, Ron Ire !a? / I
Limitation Record Site/Unit: NSP I PH1 nary No.: 301258 ation For: ISI W Procedure: Procedure Revision/FC: ISI-MT-1 Work Order No.: 0010296 Report No.: 2001M034 Page: 2 of 3 Description of Limitation: Floor penetration prohibits examination of the middle 12" of the two vertical welds on the pipe collar. 2Circ Welds = 58"Lx2.5-W.. 2 Vertical Welds = 16"Lx3"W. Sketch of Limitation: G:IDDEAL50RPI1RFO2001\\T - Supplementa 001M034-1.bmp Limitations removal requirements: None Radiation field: <2 mR/hr Examiner Level 11 Sig Date Reviewer SIopatuyp Date Auer, Robert G. 211912001 Hailing, David A. /1.Q 21 24/o( Examiner Level NIA gnature Date Site Review Sign tu Date N/A Wren, Jerry P. I Other Level NIA Signature Date ANII Review re Date N_ __A_ C lo w, R o n ,r I a"-. Surru Examin*
Determination of Percent Coverage for Surface Examinations SitelUnit: NSP I P11 Summary No.: 301258 Examination For ISl Report No.: 2001M034 Procedure: ISI-MT-1 Page: 3 of 3 Procedure Revision/FC: 11 i Work Order No.: 0010296 Area Required (as shown in applicable code reference drawing) Length 128.000 Width 3.016 Total Area required 386.048 square inches Coverage Achieved Area examined 314.000 sq. in. / Total area required (100%) 386.048 sq.- in. = Percent coverage -0d13 % (area required - area of limitations = area examined) il.V/oi To determine length of a circumferential weld Note - Diameter refers to actual external diameter not pipe size (see table below) Diameter 0.000
- (Pi) 3.1416
= Length 0.000 inches Pipe Actual (Length) Pipe Actual (Length) Size Diameter Circumference Size Diameter Circumference 2 2.375 7.46 12 12.75 40.06 2.5 2.875 9.03 14 14.0 43.98 3 3.5 11.0 16 16.0 50.27 3.5 4.0 12.57 18 18.0 56.55 4 4.5 14.14 20 20.0 62.83 5 5.563 17.48 22 22.0 69.12 6 6.625 20.81 24 24.0 75.40 8 8.625 27.10 30 30.0 94.25 10 10.75 33.77 d Site Field Supervisor: ?V CI/ Date: 2-- -- c.)1_
/ '" :'., -HOLDING LUGS SAFETY INJECTION PUMP (TYPICAL) N XH-1001-155 REF: XH-1001-1390 EXM&SP)- Pl-1 ISI DWN: TJH CHKD: x;re-d APPD:*¢rj SYSTEM: SAFETY INJECTION PUMP #11 LINE: DWG:, ISI-83C - REV. o ?u SAFETY INJECTION PUMP #11 (l,.--
iEp Site/Unit Summary No.: Examination For: Liquid Penetrant Examination NSP I Pll 303052 ISI Procedure: Procedure Revision/FC: Work Order No.: tSI-PT-1 13 I 0010291; Report No.: 2001P056 Page: 1 of 3 Applicable Code: 1989 ISO Drawing No.: ISI-93B Location: RHR12
== Description:== SUPPORT System ID: RH Component ID: H-2 Size/Length: NIA Limitations: See Comments Temp. Tool Mfg.: Telatemp Serial No.: NSP 172 Surface Temp.: 85 -F Surface TemPerature of Comparator Block (if used): Side A: N/A °F Side B: MIA "F Gray Card (if used): Not Used Lo Location: N/A Surface Condition: AS WELDED I r Cleaner Penetrant Remover Developer Brand Magnaflux Magnaflux Magnaflux Magnaflux Type SKC-S SKL-HF/S SKC-S SKD-S2 Batch No. 98L07K 84M043 98L07K 97J04K Time Evap. 5 Min Dwell 15 Min Evap. 2 Min Develop 7 Min Time Exam Started: 14:00 Time Exam Completed: 15:00 Indication Loc Loc iameter Length Type Remarks No. L W R/L Comments: Tightly adhering mill scale on support plate material within 1/2" of weld toe. Results: NAD Ij iND n] Percent Of Coverage Obtained > 90%/,: No Reviewed Previous Data: No Examiner Level Ill (*Signa Date Reviewer /. tre Date Hailing, David A. 1216(2001 Auer, Robert G. j '/ ( f9 Examiner Level WA Signature Date Site Review-a t Date NIA / Wren, Jerry P. Other Level N/A Signature Date ANII Review R-i tre. Date NIA I Clow, Ron I(i 6( ~ 2's~ Cleaner Penetrant Remover Developer
SitelUnit: NSP 1 Pil Summary No.: 303052 Examination For ISi Limitation Record Procedure: Procedure Revision/FC: Work Order No.: ISI-PT-1 13 1 0010296 Report No.: 2001P056 Page: 2 of 3 Description of Limitation: Mill scale located on support base metal. MilIscale is tightly adhering and could not be removed by wire wheel or flapping. Bottom of support is inaccessible for removal work. Sketch of Limitation: G:\\IDDEAL500PI1RFO2O01*PT - SupplementarP2001P056-1.bmp Limitations removal requirements: NWA Radiation field: mRlhr Examiner Level iII St nature Date Reviewer Sig Date "Hailing, David A. 21612001 Auer, Robert G. 2 i n 'tuDt Examiner Level NIA Signa Date Site Review ignature Date NIA Wren, Jerry P. I i*W, c Other Level NWA Signature Date ANII Review A e e Date NIA I Clow, Ron I ,j,(/?,..2'/s /
w Determination of Percent Coverage for Surface Examinations Sum Examin Site/Unit: NSP f P11 mary No.: 303052 ation Fort IS] Procedure: Procedure Revision/FC: Work Order No.: Report No.: 2001P056 ISI-PT-I Page: 3 of 3 13 / 0010296 Area Required (as shown in applicable code reference drawing) Length 80.000
- Width 1.750
= Total Area required 140.000 square inches Coverage Achieved Area examined 100.000 sq. in. /Total area required (100%) 140.000 sq. in. Percent coverage .-AWE % (area required - area of limitations = area examined) 71,q 916 To determine length of a circumferential weld Note - Diameter refers to actual external diameter not pipe size (see table below) Diameter 140.000
- (Pi) 3.1416
= Length 439.824 inches Pipe Actual (Length) Pipe Actual (Length) Size Diameter Circumference Size Diameter Circumference 2 2.375 7.46 12 12.75 40.06 2.5 2.875 9.03 14 14.0 43.98 3 3.5 11.0 16 16.0 50.27 3.5 4.0 12.57 18 18.0 56.55 4 4.5 14.14 20 20.0 62.83 5 5.563 17.48 22 22.0 69.12 6 6.625 20.81 24 24.0 75.40 8 8.625 27.10 30 30.0 94.25 10 10.75 33.77 1_ [___ Site Field Supervisor: Date: Z(,-/c-Date.
UT Pipe Weld Examination Site/Unit: NSP / Summary No.: 31 Examination For: Pi1 01874 181 Procedure: Procedure Revision/FC: Work Order No.: ISI-UT-16A 0 / Applicable Code: 1989 ISO Drawing No.: ISI-89B Location: Containment
== Description:== TEE - VALVE System ID: RH Component ID: W-18 Size/Length: 1.0" 125.13" Thickness/Diameter: 1.0"/ 8.0" Limitations: Single side access. See attached sheet. Start Time: 15:45 Finish Time: 16:10 Examination-Surface:....-inside . Outside .- Surface-eCondftion:-Ground-Flush Lo Location: Top Dead Center Wo Location: Centerline of Weld Couplant: Sonotrace 40 Batch No.:
- 00143 Temp. Tool Mfg.:
Telatemp Serial No.: NSP 126 Surface Temp.: 70 °F Cal. Sheet No.: 2001CA034, 2001CA035 Angle Used 0 45 1 45T 60 Scanning dB NIA 48.7 50.3 76.2 IndicatIon(s): Yes E No [] Scan Coverage: Upstream R Downstream D CWR CCW / Comments: 60 Degree RL scanned at reference due to noise level. Results: NAD J] IND [ GEO D_ Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: No Examiner Level 11 Date Reviewer Sl! tu D/ate Timm, Jeremy T. / 2/12001 Hailing, David A. / 7-13* SE x a m in e r L e v e 1,Dt3Rv e e S t r Examiner L;'el NIA Sign ure Date Site Review Date N/A /Clay, Sean P. I -,2 N/A / Other Level N/A Signature Date ANII Review gnature MIA Clw o Report No.: 2001U013 Page: 1 of 3 -p
MWP Site/Unit: NSP / P11 Summary No.: 301874 Examination For IS1 Limitation Record Procedure: Procedure Revision/FC: Work Order No.: ISI-UT-6A 0 1 0010296 Report No.: 2001U013 Page: 2 of 3 Description of Limitation: Single side access due to tee to valve configuration. Sketch of Limitation: G:IDDEAL50APIIRFO2001 UT - SupplementalS2001 U013-1.bmp Flow VcIvr-Limitations removal requirements: None Radiation field: 10 mR/hr Examiner Level I1 V Date Reviewer Signature ate "Timm, Jeremy T. I 2/112001 Hailing, David A. / Examiner Level N/A Signature Date Site Review Signature \\ Date NIA
- IClay, Sean P.
I A ~ ~ 23O Other Level NIA Signature Date ANII Review re Pate N/t'A Clow, Ron I / .4/,
flP Determination of Percent Coverage for UT Examinations Pipe Report No.: 2001U.013 Site/Unit: NSP I PH1 Procedure: ISl4JT-16A Pe : 3ofU 3 Summary No.: 301874 Procedure Revision/FC: 0 IPage:----- Examination For: ISI Work Order No.: 0010296 45 dell Scar) 1 100.000 % Length X 13.400 % volume of length / 100 = 13.400 % total for Scan I Scan 2 0.000 % Length X 0.000 % volume of length 1100 = 0.000 % total for Scan 2 Scan 3 100.000 % Length X 65.710 % volume of length / 100 = 65.710 % total for Scan 3 Scan 4 100.000 % Length X 65.710 % volume of length /100 = 65.710 % total for Scan 4 Add totals and divide by # scans 36.205 % total for 45 deg Other deg - 60 (to be used for supplemental scans) The data to be listed below is for coverage that was not obtained with the 45 deg scans. Scan 1 100.000 % Length X 52.140 % volume of length / 100 = 52.140 % total for Scan 1 Scan 2 0.000 % Length X 0.000 % volume of length/I 00 = 0.000 % total for Scan 2 Scan 3 0.000 % Length X 0.000 % volume of length 1100 = 0.000 % total for Scan 3 Scan 4 0.000 % Length X 0.000 % volume of length / 100 = 0.000 % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; 49.240 % Total for complete exam Site Field Supervisor _v__ Date: 213/2001
Limitation Record NM& Site/Unit: /V5,0 / 1.: Summary No.: 3* /
- 7 I/
Workscope: / Sf Procedure: Procedure Revision/FC: Work Order No.: a / 24 Description of Limitation: iw,-. o ~r~r f Wo Sketch of Limitation: - Limitations removal requirements: Al/v E,
- /o1-,6, AL-771otU
£Xd,*m W/itS Pe_.o*,1o rxom oewr sth o,& rL 7I r-t#Nlrca PTOUIPEO p5;V jp"~CelcAitC &9-IT/b~ 4-0 RJC Radiation field: /9
- /
Examiner Level Signature Date Reviewer 4.4 Sn eDate Examiner Level Signature Date Site Review "'Signature Date I S SOther Lev...I e lw............. Signature - Date-AN/iiReview... Sign-atur:e........... D~a-t Outage No.: Report No.: . Page: Pz-IRFo __of Vh1(,V/e 4 VO-'-' 6 4-6-C-i) e-&MPV46r,(r- -GC-VmFneleofý 1,-%/ Act-
' I-UT Pipe Weld Examination Site/Unit: NSP I Summary No.: e__-- PH1 305137 Procedure: Procedure Revision/FC: ISI-UT-IBA 0 I Report No.: 2001 U034 Page: 1 of 3 r i-n auuun ror;. Work Order No.: 0010296 Applicable Code: 1989 ISO Drawing No.: IS1-101 Location: Aux Bldg
== Description:== WELDOLET - PIPE System ID: SI Component ID: W-1 Size/Length: .6" 16.28" Thickness/DJameter: .35" 12.0", Limitations: None Start Time: 13:00 Finish Time: 15:20 Examination Surface: Inside E Outside [] Surface Condition: As Welded Lo Location: Top Dead Center Wo Location: Centerline of Weld Couplant: Sonotrace 40 Batch No.:
- 00143 Temp. Tool Mfg.:
Telatemp Serial No.: NSP 134 Surface Temp.: 70 'F Cal. Sheet No.: 2001CA075, 2001CA076 Angle Used 0 145 145T '601 70 Scanning dB NIA NIA 52.5 NIA 63.1 Indication(s): Yes E No EZ Scan Coverage: Upstream jJ Downstream [] CWW-CCWV] Comments: None Results: NAD [ IND [] GEO j_ Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: Yes I Pvirm~ar I aw* o Potter, Michael E. I Ex/aminer I i~t h, l
- I.....
uate Reviewer 211612001 IHallina. David A. uate I Other Level ^, ell f I I.,,. / Site -eview Clay, Sean P. UaJL Ir*, Review I Claw-Ron NIA NIA "V1 Sgnatqe. Date1 ),, .Signature Date Ignature -Date u11 a~tUle kjl.. I -LII
IW* Ste/Unit: NSP / P1i Summary No.: 305137 Examination Fýor: ISI Limitation Record Procedure: ISIIJT-16A Procddure Revision/FC: Work Order No.: Report No.: 2001 U034 Page: 2 of 3 0 I 0010296 Description of Limitation: One sided examination due to weld crown and configluration. Sketch of Limitation: G:AIDDEAL50 PI1RFO20O1\\UT Supplementa12001U034-t.bmp Limitations removal requirements: .None Radiation field: <1 mR/hr Examiner Level 11 ',/] 9]4' II Date Reviewer Sirre Date Potter, Michael E. 1 2Sign162001 Hailing, DavideA. / W Exatiner Level NWA Signature Date Site Review Signatu W/A /___ Clay, Sean P. Level NIA Signature Date ANII Review/ Date N/ACow, Ron
Determination of Percen Coverage for UT Examinations - Pipe Site/Unit: NSP I P11 Summary No.: 305137 Examination For: ISI Report No.: 2001 U034 Procedure: ISI-UT-16A Pe : 3of 3 Page. 3 of 3 ProcedUre Revision/FC: 0 I Work Order No.: 0010296 45 de* Scan 1 0.000 % Length X Oj000 % volume of length / I Oo= 0.000 % total for Scan I Scan 2 0.000 % Length X 0,000 % volume of length / 100 = 0.000 % total for Scan 2 Scan 3 100.000 % Length X f% volume of length /100 = 50.000 % total for Scan 3 Scan 4 100.000 % Length X 5-.000 % volume of length /100 = 50.000 % total for Scan 4 Add totals and divide by # scans 25.000 % total for 45 deg Other deg 70 (to be used for supplemental scans) The data to be listed below is for coverage that was not obtained with the 45 deg scans. Scar 1 100.000 % Length X 0.000 % volume of length / 100 = 0.000 % total for Scan I Scan 2 100.000 % Length X 5ý.700 % volume of length/ 100 = 56.700 % total for Scan 2 Scar. 3 0.000 % Length X 0.000 % volume of lengthI I 00 = 0.000 % total for Scan 3 1 Scan 4 0.000 % Length X 0.000 % volume of length / 100 = 0.000 % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # Pf scans to determine; 39.175 % Total for complete exam Site Field Supervisor Date: L2I(iJkL
Nfl) Limitation Record Site/Unit. W., / pr- / Summary No.: 3 05-S / Workscope: / Procedure: Procedure Revision/FC: Work Order No.: ISl!zr-14*, 4 6?' OO/029(o Outage No.: P- /,R F Zoo/ Report No.: _q-AO / ao Page: of Description of Limitation: 416',o-o -i-oia~r oA-dO eompme~i-s~ e~MT~k oIjr(,&x4-Tzor-j Sketch of Limitation: wL-o IoEt ooC-7 WkI-O CK-,< 4 f f10(AAMC Limitations removal requirements: ,v4/rC; TLo,*. A )r 0,W , FF>(t-44 WA/S 1t4 5/,C, Y gle. rFe rýeklWAs,95 P/2OL/IS't 05Y #000e-601MC 151-ul-/6.'* koW192t; Radiation field FP I A mh Examiner Level Signature Date Reviewer -L ,,sgnature, Date Examiner Level Signature Date Site Review L Signature Date Other Level Signature Date IANII Review Ssignature -Date] / I
rM C)> Limitation Record 4 /'f /o,/ Site/Unit: ,vs, / P,.- / Summary No.: 3o1 I?"g Workscope: /151* 1-/ R./3
- 7oo
- 4Pb, Procedure:
/15/- V 7--6 4-Outage No.: P - / RF 2oe)/ Procedure Revision/FC: 0/ / Report No.: ,to Lt, 3'0 Work Order No.: po / 7 9, ( Page: of Description of Limitation: Sketch of Limitation: pLX (_ (- ( (. / ?U4/ (D P LEsrL,4 / J gkrg 1-6' Limitations removal requirements: Radiation field: Examiner Level Signature Date Reviewer t-, Sign/AtreI Date Examiner Level Signature Date Site Review Signature Date Other Level Sig-naturne Date A-NiI Rieview Signature.. Date I. / 6E71I Iad(. r '7
A 7-7Ac 6 w vr /7 Magneic Particle Examination Site/Unit: NSP / Pll Procedure: ISI-MT-1 Summary No.: 301619 Procedure Revision/FC: 11 I Examination For: ISI Work Order No.: 0010296 Report No.: 2001M016 Page: 1 of 3 Applicable Code: 1989 ISO Drawing No.: ISI-68C Location: Aux Bldg
== Description:== TEE - PIPE System ID: MS Component ID: W-9LSD2U Size/Length: 1.60"/ 97.0" Limitations: See attached sketch. Light Meter Mfg.: N/A Serial No.: N/A Illumination: N/A uw/crnm Temp. Tool Mfg.: N/A Serial No.: NIA Surface Temp.: <600 -F Gray Card (if used): Not Used Cal Block Serial No.: N/A Surface Condition: Flat Topped Lo Location: Top Dead Center Field Orientation: Longitudinal Magnetic Particle Material Brand: Magnaflux Wet [] Mixed: Yes 1] Applied By: Dusting W1 Type: No. 1 Gray Dry [ No [ Spraying [] Batch No.: 84A047 Fluore~cent El With: Flooding 0 Equipment: Magnafluxi Serial No.: LMT YK-11 Head Shot EL Amperes Fixed Spacing EL AC W DC nI Adj. Spacing ]6 inches Encircling Coils j] N/A Turns Prods. Spacing [] inches Current (machine setting) WI N/A Amperes Indication Loc Loc Diameter Length Type Remarks No. L W R/L Comments: None Results: NAD [] IND E]. Percent Of Coverage Obtained > 90%: No Reviewed Previous Data: No Examiner Level II Date Reviewer Slgpature D te Timm, Jeremy T. I_217/2001 Hailing, David A. / '* QI .A 2/Ioo Examiner Level WA ,,Si gnature Date Site Review S N/A I Wren, Jerry P. / AJ, t,.* 2-O-O( Other Level N/A Signature Date ANII Review Oire Date NIA I Clow, Ron I // 77 / UP-3m
asp Site/Unit NSP / P11 Summary No.: 301619 Examination For: ISI Procedure: Procedure Revision/FC: Work Order No.: ISI-MT-1 01 I 0010296 Report No.: 2001MoI1 Page: 2 of 3 Description of Umitation: Restraint and Nozzle Radius - 31.2 sq in of 252.2 sq in limited due to nozzle. Sketch of Umitation: G:.IDDEAL50Pl1RFO2001\\MT - SuppIementaP2001M016-1.bmp "ToP V ijrw Limitations removal requirements: _None Radiation field: < 2 mR/hr Examiner Level II / Si ure Date Reviewer Sint .r Date Timm, Jeremy T. / 217/2001 Hailing, David A. 1 0 1floI 0 Examiner Level NIA Signature Date Site Review Signatur Date WA / Wren, Jerry P. (2 .O n a 1.. jo -01 Other Level N/A Signature Date ANII Review Z at Date NIA I Clow, Ron -1011-a&t~e4-Aku~o7- / '7 Limitation Record II
Determination of Percent Coverage for Surface Examinations SiteAJnit: NSP I PHt Summary No.: 301619 Examination Ford ISI Procedure: Procedure RevisionrFC: Work Order No.: Report No.: 2001M016 ISI-MT-1 Page: 3 of 3 11 / 0010296 Area Required (as shown in applicable code reference drawing) Length 97.000
- Width 2.600
= Total Area required 252.200 square inches Coverage Achieved Area examined 221.000 sq. in. / Total area required (100%) 252.200 sq. in. = Percent coverage -0476' % (area required - area of limitations = area examined) SZ-I0- -D I To determine length of a circumferential weld Note - Diameter refers to actual external diameter not pipe size (see table below) Diameter 30.000 (Pi) 3.1416 = Length 94.248 inches Site Field Supervisor (?u Date: 2--/1 -0/( LI Mr Pipe Actual (Length) Pipe Actual (Length) Size Diameter Circumference Size Diameter Circumference 2 2.375 7.46 12 12.75 40.06 2.5 2.875 9.03 14 14.0 43.98 3 3.5 11.0 16 16.0 50.27 3.5 4.0 12.57 18 18.0 56.55 4 4.5 14.14 20 i0.0 62.83 5 5.563 17.48 22 22.0 69.12 6 6.625 20.81 24 24.0 75.40 8 8.625 27.10 30 30.0 94.25 10 10.75 33.77
Limitation Record Site/Unit: N5P0 / -/ Summary No.: 3 (,/ t Workscope: /*/ Procedure: /.%/-#'4 r- / Procedure Revision/FC: /1 / Work Order No.: 0 / Outage No.: .2- /I Report No.:.___,_____ Page: of Description of Limitation: R~E5T4FArITI' +"Jb I'IO Z Z L &Pbl e! I( A-~i~ Y r J L G S t o Lm aofn Sketch of Limitation: 1,, ) 1't~ Limitations removal requirements: Radiation field: Examiner Level Signature Date Reviewer L Signature/ Date Examiner Level Signature Date Site Review Signature Date / I R S Other Level Signlatur:e Da-te JAN11 Review signature Date / /.I eýýIvc-V/6-i
XCEL ENERGY METALS & MATERIALS RESOURCES NORTH INSERVICE INSPECTION - NONDESTRUCTIVE EXAMINATION PROCEDURE TITLE: Limitations to NDE NUMBER: ISI-LTS-1 Revision 2 PREPARED BY: JA.-J__ REVIEWED BY: APPROVED BY: 6 ~ ANII REVIEW: Superintendent M&MRN EFFECTIVE DATE: -I if b# 1.0 PURPOSE This procedure provides instruction for identifying, quantifying and recording of limitations encountered while performing examinations under the ISI program.
2.0 REFERENCES
This procedure complies with the applicable portions of the following referenced documents: 2.1 American Society of Mechanical Engineers Boiler & Pressure Vessel Code:
- Sections V and XI, 1986 edition, no addenda (Monticello - Third Interval)
- Sections V and Xl, 1989 edition, no addenda (Prairie Island - Third Interval) 2.2 Nuclear Regulatory Commission Regulatory Guide - 1.150 "Ultrasonic Testing of Reactor Vessel Welds during Preservice and Inservice Examinations", (Rev. 1 dated Feb. 1983).
2.3 Code case N-460 Alternative Examination Coverage for Class 1 and Class 2 Welds - Section Xl, Division 1 2.4 ISI NDE Manual procedure a ISI-NDE-0 "Equipment, Personnel and Material Reporting". 2.5 Metals and Materials Resources Procedure MMRN 2.3 "ISI Examination Program". 2.6 ISI Administrative Manual procedures " ISIA-1.4 "Preparation of Relief Request from ASME Section Xl Code Requirements" ISIA-2.2 "ISI Field Activities - Preparation and Control Page 1 of 12 I
cZWae4A'Lz1ct /8 XCEL ENERGY METALS & MATERIALS RESOURCES NORTH INSERVICE INSPECTION - NONDESTRUCTIVE EXAMINATION PROCEDURE I TITLE: Limitations to NDE NUMBER: ISI-LTS-1 Revision 2 3.0 APPLICABILITY 3.1 This procedure is applicable to examinations performed at Xcel Energy's Nuclear Generating Plants. 3.2 This procedure is to be followed when it has been determined that there is a limitation which prevents obtaining full coverage of an area or volume as stated by the applicable examination procedure.
- For ultrasonic examinations, this would mean less than all of the required scans and/or a reduction of required scan path for one or more scans.
4.0 DEFINITIONS 4.1 Limitation - something that limits, restraint: An obstacle to the performance of an examination procedure. 4.2 Evaluation - to determine the significance, worth, or condition of, usually by careful appraisal and study 4.3 Practical - "of, relating to, or manifested in practice or action : not theoretical or ideal; concerned with voluntary action and ethical decisions. Useful." For this application this is interpreted to mean, for a specific case the benefits of a proposed action outweigh the negative aspects of that action. 5.0 PREREQUISITES 5.1 Personnel Requirements "* Examination personnel certification and eye examinations shall be documented in accordance with ISI-NDE-0. "* Nondestructive examination personnel shall be certified to a minimum of Level I in the appropriate method to operate equipment and Level II to interpret test results. 6.0 EQUIPMENT This item is not applicable to this procedure. If alternate methods are required to augment coverage, that work shall be done under a separate procedure. Page 2 of 12
XCEL ENERGY METALS & MATERIALS RESOURCES NORTH INSERVICE INSPECTION - NONDESTRUCTIVE EXAMINATION PROCEDURE TITLE: Limitations to NDE NUMBER: ISI-LTS-1 Revision 2 7.0 INSTRUCTIONS 7.1 Initial Examination Where the examiner is not able to complete a full examination as dictated by applicable procedure, the following steps shall be taken; Complete original examination on accessible portions Make sketch which includes dimensions defining location and size of limitations using a report format similar to that shown in Fig 3. Describe the limitation including what it is and how it interferes with the exam. State what appears to be required to remove the limitation using a report format similar to that shown in Fig 3. For volumetric examinations, construct a surface profile using a surface contour gauge and perform a thickness profile (typically one reading each 1/2" in a line) of the area that encompasses the code required volume. For UT that would include the available scanning surface. "* Record radiation field information on the report (this may require assistance from the health physics group). "* Sign and date the data sheet then forward it to the Xcel Energy's Field Supervisor. 7.2 Evaluation "* The data gathered by the initial examiner shall be reviewed by the Xcel Energy's field supervisor / designee to determine if alternate methods may be used to achieve additional coverage. "* If alternate methods would provide additional coverage, a review of the benefit versus the required resources (radiation dose, time, cost etc.) to achieve that coverage shall be performed by the Xcel Energy's field supervisor to determine if that action is practical (see para 7.3). " If it is determined that the entire examination volume or area cannot be examined due to interference by another component or part geometry, a reduction in examination coverage on any Class 1 or Class 2 weld may be accepted provided the reduction in coverage for that weld is less than 10%. The applicable examination records shall identify both the cause and percentage of reduced examination coverage (see para 7.4). Page 3 of 12
Page 4 of 12 _A1 vjIA44I~ XCEL ENERGY METALS & MATERIALS RESOURCES NORTH. INSERVICE INSPECTION - NONDESTRUCTIVE EXAMINATION PROCEDURE TITLE: Limitations to NDE NUMBER: ISI-LTS-1 Revision 2 7.3 Alternate methods to achieve coverage
- For surface examinations, MT and PT may be interchanged / intermixed as appropriate to the material and the conditions.
0 For volumetric examinations, RT may be substituted for or augment UT assuming the ability to drain the line, and that the wall thickness / diameter is within a practical range.
- For UT, use of other angles, full node or node and one half calibrations, skewed scans or approach from another surface to achieve additional coverage shall be considered.
7.4 Determining Coverage Achieved When evaluation of initial and alternate examination methods results in examinations which do not provide full coverage, a determination of percent coverage shall be made. The required examination coverage is defined by applicable figures in ASME Sect XI. For surface examinations, a worksheet similar to that shown in Fig 4 shall be completed. For volumetric examinations, a worksheet similar to that shown in Fig 5 or 6 (ultrasonic examinations) shall be completed. 7.5 Should the evaluation show that 90% weld coverage has been achieved, attach all related information to the original NDE report and no further action is required. 7.6 Contractor procedures for performing examinations utilizing automated equipment (e.g. reactor vessel and nozzle safe-end exams) shall be reviewed by an Xcel Energy's level III in the appropriate method to ensure the requirements for identifying, quantifying and recording of limitations encountered are adequately addressed. 7.7 When it has been determined that the maximum examination coverage practically achievable for a code required item is less than required; a relief request is required to be submitted to the NRC (refer to ISIA 1.4). 8.0 ACCEPTANCE CRITERIA This item is not applicable to this procedure.
Page 5 of 12 ge~ XCEL ENERGY METALS & MATERIALS RESOURCES NORTH INSERVICE INSPECTION - NONDESTRUCTIVE EXAMINATION PROCEDURE TITLE: Limitations to NDE NUMBER: ISI-LTS-1 Revision 2 9.0 REPORTING 9.1 Information addressed in Fig's 3, 4, 5 and 6 (as applicable) shall be reported. 9.2 Information for examinations that are required to meet Reg. Guide 1.150 shall also include the following from Appendix A - Alternate Method; 7.c 'The best estimate of the portion of the volume required to be examined by the ASME Code that has not been effectively examined such as volumes of material near each surface because of near-field or other effects, volumes near interfaces between cladding and parent metal, volumes shadowed by laminar material defects, volumes shadowed by part geometry, volumes inaccessible to the transducer, volumes affected by electronic gating, and volumes near the surface opposite the transducer. Sketches and/or descriptions of the tools, fixtures and component geometry which contribute to incomplete coverage should be included." 9.3 Reference System Recording of limitations shall be based on the reference system shown in the original examination procedure. 9.4 Documentation A picture of the limitation should be taken and added to the description, preferably in a digital format. 10.0 RECORDS 10.1 Inservice inspection examinations shall be incorporated in the ISI records. See Metals and Materials Resurces North Procedure 2.3 "ISI Examination Program". 10.2 Records of other examinations shall be the responsibility of the organization requesting the examination.
Page 6 of 12 XCEL ENERGY METALS & MATERIALS RESOURCES NORTH INSERVICE INSPECTION - NONDESTRUCTIVE EXAMINATION PROCEDURE TITLE: Limitations to NDE NUMBER: ISI-LTS-1 Revision 2 Figure 1 Example of UT scan coverage T )j!.! °y~~........... Q ° ai "° / E / 00 Ec
XCEL ENERGY METALS & MATERIALS RESOURCES NORTH INSERVICE INSPECTION - NONDESTRUCTIVE EXAMINATION PROCEDURE I TITLE: Limitations to NDE NUMBER: ISI-LTS-1 Revision 2 Figure 2 Example of UT, one sided exam, supplemental coverage
- w.
-E t Z /[ -0 CD C.' Page 7 of 12
tzke.d s-/f XCEL ENERGY METALS & MATERIALS RESOURCES NORTH INSERVICE INSPECTION - NONDESTRUCTIVE EXAMINATION PROCEDURE TITLE: Limitations to NDE NUMBER: ISI-LTS-1 Revision 2 Figure 3 Limitation Data Sheet Initial exam report #Limi ISO # Procedure # Item # Description of Limitation________________ Sketch of Limitation Limitation removal requirements _______________________ Radiation field Examiner: Date: Page 8 of 12 -.I L = II J I I
ae Z Fao i f Ol~f i jj XCEL ENERGY METALS & MATERIALS RESOURCES NORTH INSERVICE INSPECTION - NONDESTRUCTIVE EXAMINATION PROCEDURE I Revision 2 Figure 4 Determination of Percent Coverage for Surface Examinations This is a sample form only Initial exam rpt # ISO # Procedure # Item # Applicable Code figure # Area Required (as shown in applicable code reference drawing) Length
- Width
= Total area required square inches Coverage Achieved Area examined sq. in. /Total area required (100%) sq. in. = Percent coverage % (area required - area of limitations = area examined) To determine length of a circumferential weld Note - Diameter refers to actual external diameter not pipe size (see table below) Diameter
- (Pi) 3.1416
= Length inches Pipe Actual (Length) Pipe Actual (Length) Size Diameter Circumference Size Diameter Circumference 2 2.375 7.46 12 12.75 40.06 2.5 2.875 9.03 14 14.0 43.98 3 3.5 11.0 16 16.0 50.27 3.5 4.0 12.57 18 18.0 56.55 4 4.5 14.14 20 20.0 62.83 5 5.563 17.48 22 22.0 69.12 6 6.625 20.81 24 24.0 75.40 8 8.625 27.10 30 30.0 94.25 10 10.75 33.77 Xcel Energy's Field Supervisor: Date: Page 9 of 12 L I TITLE: Limitations to NDE NUMBER: ISI-LTS-1 I 1I
Page 10 of 12 0*dWWCI4V34t 4/ia XCEL ENERGY METALS & MATERIALS RESOURCES NORTH INSERVICE INSPECTION - NONDESTRUCTIVE EXAMINATION PROCEDURE TITLE: Limitations to NDE NUMBER: ISI-LTS-1 Revision 2 Figure 5 Determination of Percent Coverage for UT Examinations - Pipe This is a sample form only Initial exam rpt # Procedure # ISO # Item # Applicable Code figure # 45 deg Scan 1 % length X _ % volume of length / 100 = % total for Scan 1 Scan 2 _ % length X__ % volume of length / 100 = % total for Scan 2 Scan 3 _ % length X __ % volume of length / 100 = % total for Scan 3 Scan 4 _ % length X % volume of length / 100 = % total for Scan 4 Add totals and divide by # scans = % total for 45 deg Other deg - (to be used for supplemental scans) The data to be listed below is for coverage that was not obtained with the 45 deg scans. Scan 1 _ % length X % volume of length / 100 =_____ % total for Scan 1 Scan 2 _ % length X % volume of length / 100 = % total for Scan 2 Scan 3 _ % length X % volume of length / 100 =____ % total for Scan 3 Scan 4 _ % length X % volume of length / 100 = % total for Scan 4 Percent complete coverage Add totals for each scan required and divide by # of scans to determine; % total for complete exam Example - 45 deg scan 1 = 63% plus supplemental 60 deg scan 1 = 28% (of remaining required scan volume) for total of 91% coverage for scan 1 volume. Repeat for the remaining scans, add together and divide by the # of scans (typically 4). Xcel Energy's Field Supervisor: _ Date:
XCEL ENERGY METALS & MATERIALS RESOURCES NORTH INSERVICE INSPECTION - NONDESTRUCTIVE EXAMINATION PROCEDURE TITLE: Limitations to NDE NUMBER: ISI-LTS-1 Revision 2 Figure 6 Determination of Percent Coverage for UT Examinations - Vessels This is a sample form only Initial exam rpt # Procedure # ISO # Item # Applicable Code figure # 0 deg Planar Scan % length X % volume of length / 100 % total for 0 deg 45 deg Scan 1 __ % length X % volume of length / 100= % total for Scan 1 Scan 2 __- % length X % volume of length / 100 = % total for Scan 2 Scan 3 __ % length X % volume of length / 100 = % total for Scan 3 Scan 4 __ % length X __ % volume of length / 100 = % total for Scan 4 Add totals and divide by # scans = __ % total for 45 deg 60 deg Scan 1 % length X % volume of length / 100 = % total for Scan 1 Scan 2 __ % length X % volume of length / 100 = % total for Scan 2 Scan 3 % length X % volume of length / 100 = % total for Scan 3 Scan 4 __ . % length X __ % volume of length / 100 = % total for Scan 4 Add totals and divide by # scans = __ . % total for 60 deg Percent complete coverage Add totals for each angle and scan required and divide by # angles to determine; % total for complete exam Note: Supplemental coverage may be achieved by use of other angles / methods. When used, the coverage for volume not obtained with angles as noted above shall be calculated and added to the total to provide the percent total for the complete examination. Xcel Energy's Field Supervisor: _ Date: Page 11 of 12
I, XCEL ENERGY METALS & MATERIALS RESOURCES NORTH INSERVICE INSPECTION - NONDESTRUCTIVE EXAMINATION PROCEDURE Revision 2
SUMMARY
OF SIGNIFICANT CHANGES Title block changed NSP to Xcel Energy and Materials & Special Processes to Metals & Materials Resources North. 2.1 Added no addenda to code years. Changed O&MS to MMRN, two places. "Changed NSP to Xcel Energy's, seven places. Page 12 of 12 L I TITLE: Limitations to NDE NUMBER: ISI-LTS-1 I aaa14,M1. W-./9* I Pages 1,2, 6, and 9 of ISI Relief Request No. 11, Limited Examination
NORTHERN STATES POWER INSERVICE INSPECTION PRAIRIE ISLAND UNIT 1,3RD INTERVAL EXAMINATION PLAN ISI Relief Request No. 11 (Rev. 1) Limited Examination SYSTEM: Various Class: 1 and 2 Category: Various Item: Various Impractical Examination Requirements: ASME Section XI (1989 no addenda) Code requires full examination of inservice inspection (ISI) components per Table IWB-2500-1, and IWC-2500-1. Reg. Guide 1.147 endorses Code Case N-460, "Alternative Examination Coverage for Class 1 and Class 2 Welds." This code case allows greater than 90% coverage of a weld to meet the "essentially 100%" requirement. NRC Information Notice 98-42 "Implementation of 10 CFR 50.55a(g) Inservice Inspection requirements" Dec. 1, 1998, states 'The NRC has adopted and further refined the definition of ""essentially 100 percent"" to mean greater than 90 percent " in 10 CFR 50.55a(g)(6)(ii)(A)(2) for required examination coverage of reactor pressure vessel welds. This standard has been applied to all examination of welds or other areas required by ASME Section XI. The Prairie Island construction permit was issued in 1967. This facility was designed and constructed with limited accessibility due to component configurations and/or physical barriers for which 100% coverage is not achievable on some ISI components examined for the Third Ten Year Interval. Basis for Relief: The following 10 CFR 50.55a paragraphs apply to the inservice inspection of components in accordance with the ASME Section XI code: 50.55a(g)(1): For a boiling or pressurized water-cooled nuclear power facility whose construction permit was issued prior to January 1, 1971, components (including supports) must meet the requirements of paragraphs (g) (4) and (5) of this section to the extent practical. 50.55a(g)(4): Throughout the service life of a boiling or pressurized water-cooled nuclear power facility, components (including supports) which are classified as ASME Code Class 1, Class 2, and Class 3 must meet the requirements, except design and access provisions and pre-service examination requirements, set forth in Section XI of editions of the ASME Boiler and Pressure Vessel Code... to the extent practical within the limitations of design, geometry and materials of construction of the components. 50.55a(g)(5)(iv): Where an examination requirement by the code or addenda is determined to be impractical by the licensee and is not included in the revised inservice inspection program as Page 1 of 37
NORTHERN STATES POWER INSERVICE INSPECTION PRAIRIE ISLAND UNIT 1,3RD INTERVAL EXAMINATION PLAN permitted by paragraph (g)(4) of this section, the basis for this determination must be demonstrated to the satisfaction of the Commission Prairie Island was designed and constructed prior to development of ASME XI, therefore design for accessibility and inspection coverage is not in many cases, sufficient to permit satisfying the current Code requirements. Limitations to inspections are primarily due to obstructions and interference. Summary of the limited examinations are described below and also included in Table 1. Part A: Category B-J, "Pressure Retaining Welds in Piping" Reactor Coolant, Weld W-6, (Pipe to Valve), Iso/Dwg ISI-2, Summary No. 300130, 50% Coverage volumetric examination. Single side examination only due to pipe configuration. Reactor Coolant, Weld W-1, (RC pump to Pipe), lso/Dwg ISI-12C, Summary No. 300514, 50% Coverage volumetric examination. Single side examination only due to pump to pipe configuration Part B: Category C-A, "Pressure Retaining Welds in Pressure Vessels".
- 12 Steam Generator, Weld W-E, (Shell -Transition), Iso/Dwg ISI-43B, Summary No. 301070, 77.54% Coverage volumetric examination. Restraint ring prohibits scanning from downstream side of weld.
RHR Heat Exchanger #12, Weld W-2, (Shell -Flange) Iso/Dwg ISI-93B, Summary No. 303054, 27.26% Coverage volumetric examination. Weld geometry limits scans. Part C: Category C-C "Integral attachments for Vessels, Piping, Pumps and Valves" Main Steam "A", Integral Attachment Welds, Hanger H-1, Iso/Dwg ISI-51A, Summary No.301122, 69.6% Coverage surface examination. Limited by configuration. Main Steam "A", Integral Attachment Welds, Hanger H-2, Iso/Dwg ISI-51A, Summary No. 301132, 83.5% Coverage surface examination. Limited by configuration. Page 2 of 37
NORTHERN STATES POWER PRAIRIE ISLAND UNIT 1, 3RD INTERVAL INSERVICE INSPECTION EXAMINATION PLAN Table 1: Limited Examinations-Prairie Island Unit 1 -2001 Refueling Outage. 'ipe-valve 300130 ,ui t)u>ingie ioaea Examination due to pipe configuration. (Paae 10 of 37) B-J B 9.11 Reactor Coolant IS1-12C W-1 Reactor Volumetric 50.00 2001U039 (PDI )Single Sided Coolant Pump Examination due to pump to Pipe to pipe configuration. 300514 (Page 11 Of 37) C-A C1.10 STEAM GENERATOR ISI-43B W-E Shell-Volumetric 77.54 2001U010 Due to weld configuration.
- 12 Transition (Page 12 of 37) 301070 C-A C1.10 RHR Heat Exchanger #12 ISI-93B W-2 Shell-Flange Volumetric 27.26 2001U029 Weld geometry limits scan 303054 (Page 13 of 37)
C-C C3.20 Main Steam "A" ISI-51A H-1 Seismic Surface 69.6 2001M011 Examination limited to 188" Restraint weld length out of 270" total (Integral weld length due to attachment configuration of restraint Weld) (Page 14 of 37) 301122 C-C C3.20 Main Steam "A" ISI-51A H-2 Seismic Surface 83.5 2001M010 Examination limited to 76" Restraint weld length out of 91" total (Integral weld length due to attachment configuration of restraint Weld) (Page 15 of 37) 301132 Page 6 of 37
NORTHERN STATES POWER PRAIRIE ISLAND UNIT 1, 3RD INTERVAL INSERVICE INSPECTION EXAMINATION PLAN C-C C3.30 SI PUMP 11 ISI-83C H-4 Support D Surface 84.00 2001M025 Configuration prohibits 302078 examining weld at base of support. (Page 29 of 37) C-C C3.30 SI PUMP 11 ISI-83C H-5 Support E Surface 71.4 2001M030 Configuration prohibits 302082 examining weld at inside of support. (Page 30 of 37) C-C C3.30 SI PUMP 11 ISI-83C H-6 Support F Surface 71.4 2001M024 Configuration prohibits 302086 examining weld at inside of support. (Page 31 of 37) C-C C3.10
- 12 RHR Heat Exchanger ISI-93B H-2 Support Surface 71.4 2001P056 Bottom of Support is 303052 inaccessible for removal work and mill scale.
(Page 32 of 37) C-F-1 C5.11 RHR Pump "B" Discharge ISI-89B W-14 Pipe to Volumetric 0 2001 U040 Weld inaccessible due to Penetration Surface 2001P070 penetration sleeve and
- 10.
welded restraint. (Page 33, 301858 and 34, of 37) C-F-1 C5.11 RHR Pump "B" Discharge ISI-89B W-18 Tee-Valve Volumetric 49.2 2001 U013 (PD1 )Single Sided 301874 Examination due to tee to valve configuration. (Page 36 of 37) C-F-1 C5.21 SI Test Return ISI-101 W-1 Weldolet to Volumetric 39.18 2001U034 (PDI )Single Sided Pipe Examination due to Weld 305137 Crown configuration. (Page 35 of 37) C-F-2 C5.50 Main Steam "B" ISI-68C W-9 Tee-Pipe Surface 87.6 2001M016 31.2 Sq. in. of 252 Sq. in. LSD2U 301619 limited due to nozzle configuration (Page 37 of 37) Page 9 of 37}}