Letter Sequence Response to RAI | |
---|---|
TAC:MB2199, (Open) | |
Initiation
Administration Results
Other: | |
MONTHYEARML0202900342002-02-0404 February 2002
[Table View]Request for Additional Information Regarding Request for Relief No. 11 Project stage: RAI ML0210704192002-04-15015 April 2002 Response to a Request for Additional Information Regarding Request for Relief No. 11 for the Unit 1 3rd 10-Year Interval Inservice Inspection Program Project stage: Response to RAI ML0219303412002-07-0303 July 2002 Response to Request for Additional Information Regarding Request for Relief No. 11 for Unit 1 3rd 10-Year Interval Inservice Inspection Program Project stage: Response to RAI 2002-04-15 |
ML021070419 | |
Person / Time | |
---|---|
Site: | Prairie Island |
Issue date: | 04/15/2002 |
From: | Nazar M Nuclear Management Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
TAC MB2199 | |
Download: ML021070419 (81) | |
Similar Documents at Prairie Island | |
---|---|
Category:Letter
MONTHYEAR05000306/LER-2024-002, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to High Negative Neutron Flux Rate Trip2024-12-19019 December 2024
[Table view]Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to High Negative Neutron Flux Rate Trip ML24354A2952024-12-18018 December 2024 ISFSI and Monticello Nuclear Generating Plant - Independent Spent Fuel Storage Installation Decommissioning Funding Plans L-PI-24-051, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) Definitions and Adopt Plant Specific Methods for Response Time Testing (Rtt)2024-12-18018 December 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) Definitions and Adopt Plant Specific Methods for Response Time Testing (Rtt) IR 05000282/20244022024-12-17017 December 2024 Cyber Security Inspection Report 05000282/2024402 and 05000306/2024402 (Public) IR 05000282/20240032024-11-13013 November 2024 Integrated Inspection Report 05000282/2024003, 05000306/2024003 & 07200010/2024001 ML24310A1682024-11-0505 November 2024 Core Operating Limits Report (COLR) for Cycle 34, Revision 0 ML24298A0552024-10-30030 October 2024 Response to Alternative RR-10, Auxiliary Feedwater Valve Testing IR 05000282/20244032024-10-25025 October 2024 – Security Baseline Inspection Report 05000282/2024403 and 05000306/2024403 05000282/LER-2024-001-01, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-10-22022 October 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies L-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML24277A1012024-10-0303 October 2024 Closure of Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software ML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 ML24241A1682024-09-23023 September 2024 Transmittal Letter Amendment No. 13 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 05000282/LER-2024-001, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-09-16016 September 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 IR 05000282/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2024005 and 05000306/2024005) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter IR 05000282/20245012024-08-0505 August 2024 Emergency Preparedness Inspection Report 05000282/2024501 and 05000306/2024501 ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant IR 05000282/20240022024-07-30030 July 2024 Integrated Inspection Report 05000282/2024002 and 05000306/2024002 ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations IR 05000282/20240102024-06-28028 June 2024 Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 ML24158A5912024-06-0606 June 2024 CFR 50.46 LOCA Annual Report L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption ML24155A1922024-05-31031 May 2024 Refueling Outage Unit 2 R33 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections 05000306/LER-2024-001-01, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-05-31031 May 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24128A2572024-05-16016 May 2024 ISFSI A13 Acceptance Letter IR 05000282/20240012024-05-15015 May 2024 Integrated Inspection Report 05000282/2024001 and 05000306/2024001 ML24130A2362024-05-0909 May 2024 Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Monitoring Program Report ML24130A2392024-05-0909 May 2024 2023 Annual Radioactive Effluent Report ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24128A0882024-04-30030 April 2024 Submittal of Updated Safety Analysis Report (Usar), Revision 38 ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance 05000306/LER-2024-001, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-04-29029 April 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump IR 05000282/20244012024-04-25025 April 2024 – Security Baseline Inspection Report 05000282/2024401 and 05000306/2024401 ML24100A8042024-04-24024 April 2024 – Alternative Request RR-09 for Safety Injection and Volume Control System Category C Check Valve Inservice Testing ML24114A0882024-04-23023 April 2024 Annual Report of Individual Monitoring for the Prairie Island Nuclear Generating Plant (PINGP) ML24113A1182024-04-12012 April 2024 NRC Letter Re NRC Office of Investigations Report No. 3-2023-004 ML24100A1212024-04-0909 April 2024 Submittal of Revised Pressure and Temperature Limits Report ML24093A2832024-04-0202 April 2024 Nuclear Material Transaction Report L-PI-24-012, Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-04-0202 April 2024 Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) ML24089A2402024-03-29029 March 2024 Guarantee of Payment of Deferred Premiums 2024-09-27 Category:Report MONTHYEARML24155A2222024-05-28028 May 2024
[Table view]Methodology Evaluation Report for Elimination of Response Time Testing Prairie Island Reactor Trip System Rev. 1 ML24100A1212024-04-0909 April 2024 Submittal of Revised Pressure and Temperature Limits Report ML23270B9022023-09-29029 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report ML23265A2532023-09-26026 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report L-PI-23-002, WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 7 of 7)2022-12-31031 December 2022 WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 7 of 7) ML23075A3492022-12-31031 December 2022 WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 4 of 7) ML23075A3482022-12-31031 December 2022 WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 3 of 7) ML23075A3502022-12-31031 December 2022 WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 5 of 7) ML23075A3462022-12-31031 December 2022 WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 1 of 7) ML23075A3472022-12-31031 December 2022 WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 2 of 7) ML23075A3512022-12-31031 December 2022 WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 6 of 7) ML22003A1832022-01-0303 January 2022 Refueling Outage Unit 2 R32 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections ML21285A2812021-10-12012 October 2021 Revised Pressure and Temperature Limits Report ML20272A2932020-09-28028 September 2020 (PINGP) Unit 1 and 2 Revised Pressure and Temperature Limits Report ML20265A0892020-09-15015 September 2020 Draft License Conversation Record L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency ML18053A0232018-02-22022 February 2018 Compilation of Industry Provided Information on Anchor Darling Double Disc Gate Valve Population Affected by Flowserve, Part 21 Issue of Wedge Pin Failure on an Anchor Darling Double Disc Gate Valve in Report Format with Valve Count ML17279A1242017-09-30030 September 2017 Enclosure 5 to L-PI-17-041, Westinghouse WCAP-17400-NP, Supplemental 1, Revision 2, Spent Fuel Pool Criticality Safety Analysis Supplemental Analysis Including the Storage of Ifba Bearing Fuel L-PI-16-058, Special Report: Timely Restoration of Operability of Explosive Gas Monitoring Instrumentation2016-07-22022 July 2016 Special Report: Timely Restoration of Operability of Explosive Gas Monitoring Instrumentation L-PI-16-054, Pressure and Temperature Limits Report, Revision 52016-06-22022 June 2016 Pressure and Temperature Limits Report, Revision 5 L-PI-16-051, 10 CFR 50.46 Emergency Core Cooling System Annual Report2016-06-22022 June 2016 10 CFR 50.46 Emergency Core Cooling System Annual Report L-PI-15-034, Pressure and Temperature Limits Report (PTLR) Revision 42015-05-14014 May 2015 Pressure and Temperature Limits Report (PTLR) Revision 4 ML15037A4582015-03-0606 March 2015 Staff Assessment of the Aging Management Program for Reactor Vessel Internal Components L-PI-14-131, Fifth Ten-Year Interval Snubbers Testing Program2014-12-18018 December 2014 Fifth Ten-Year Interval Snubbers Testing Program ML17297A3232014-11-14014 November 2014 Enclosure 2 (Redacted): Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic Updated Transmittal for Prairie Island Unit 1 ML16005A1102014-09-25025 September 2014 Redacted 2014 Decommissioning Cost Analysis for the Prairie Island Nuclear Generating Plant ML14148A4772014-06-17017 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML14120A1622014-05-0909 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident L-PI-14-045, Enclosure to L-PI-14-045, Transition Report, Revision 12014-04-30030 April 2014 Enclosure to L-PI-14-045, Transition Report, Revision 1 L-PI-14-028, PINGP Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2014-03-27027 March 2014 PINGP Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident ML14030A5402014-02-27027 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14041A2042014-02-26026 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Prairie Island Nuclear Generating Plant, Units 1 and 2, TAC Nos.: MF0834 and MF0835 L-PI-13-080, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-08-26026 August 2013 First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events L-PI-12-108, Final Response to NRC Request for Information, Per 10CFR50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-26026 November 2012 Final Response to NRC Request for Information, Per 10CFR50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident L-PI-12-103, Final Response to NRC Request for Lnformation Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Lnsiqhts from the Fukushima Dai-ichi Accident2012-11-26026 November 2012 Final Response to NRC Request for Lnformation Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Lnsiqhts from the Fukushima Dai-ichi Accident ML12278A4052012-09-28028 September 2012 Prairie Island, Units 1 and 2, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors ML13133A0632012-06-27027 June 2012 H4, Rev. 27, Offsite Dose Calculation Manual (Odcm). ML12159A2562012-06-11011 June 2012 Review of 60-Day Response to Request for Information Regarding Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Daiichi Nuclear Power Plant Accident L-PI-10-076, Calculation No. GEN-PI-083, Revision 1, Locked Rotor Accident (LRA) Analysis Using AST, Attachment 52010-07-23023 July 2010 Calculation No. GEN-PI-083, Revision 1, Locked Rotor Accident (LRA) Analysis Using AST, Attachment 5 ML1021002592010-06-30030 June 2010 Seismic Fragilities for Unit #1 and Unit #2 Turbine Building Piping and Equipment ML1016901682010-06-11011 June 2010 Enclosure 3, Prairie Island Nuclear Generating Plant, Units 1 and 2, Supporting Engineering Evaluations, EC 16090, Turbine Building Flooding SDP: Cl Turbine Building Pipe Break Analysis. ML1016901702010-06-11011 June 2010 Enclosure 5, Prairie Island Nuclear Generating Plant, Units 1 and 2, Supporting Engineering Evaluations, EC 16270, Screening of Pipe Whip Interactions for Sdp. ML1016901712010-06-11011 June 2010 Enclosure 6, Prairie Island Nuclear Generating Plant, Units 1 and 2, Supporting Engineering Evaluations, EC 16275, Effects of Pipe Whip Interactions for Various Pipe Combinations for Internal Flooding Sdp. ML1016901692010-06-10010 June 2010 Enclosure 4, Prairie Island Nuclear Generating Plant, Units 1 and 2, Supporting Engineering Evaluations, EC 16154, Turbine Building Flooding SDP: Cl Turbine Building Seismic Pipe Break Analysis. L-PI-10-005, Ninety-Day 1R26 Post-Outage Report Pursuant to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal & Containment Spray Systems2010-02-18018 February 2010 Ninety-Day 1R26 Post-Outage Report Pursuant to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal & Containment Spray Systems ML1019703862009-12-31031 December 2009 Ground Water Investigation: an Improved Flow Net to Evaluate Pathways for a Potential Ground Water Release ML1002001312009-12-21021 December 2009 Report No. 0900634.401, Revision 2, Updated Leak-Before-Break Evaluation for Several RCS Piping at Prairie Island Nuclear Generating Plant, Units 1 & 2. ML1002001322009-12-18018 December 2009 Report 0900634.402, Revision 2, Updated Leak-Before-Break Report for Prairie Island Nuclear Generating Plant Unit 2 Pressurizer Surge Line Nozzle. L-PI-09-115, Radtrad and ARCON96 Input and Output Files in Support of License Amendment Request (LAR) to Adopt the Alternative Source Term Methodology2009-10-27027 October 2009 Radtrad and ARCON96 Input and Output Files in Support of License Amendment Request (LAR) to Adopt the Alternative Source Term Methodology ML1008406402009-09-11011 September 2009 Advisory Brief of Prairie Island Nuclear Generating Plant Study Group to State of Minnesota, Office of Administrative Hearings for the Public Utilities Commission, Sept. 11, 2009. Submitted with Comments on Draft Generic Environmental Impac 2024-05-28 Category:Technical MONTHYEARML24155A2222024-05-28028 May 2024
[Table view]Methodology Evaluation Report for Elimination of Response Time Testing Prairie Island Reactor Trip System Rev. 1 ML24100A1212024-04-0909 April 2024 Submittal of Revised Pressure and Temperature Limits Report ML23075A3462022-12-31031 December 2022 WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 1 of 7) ML23075A3472022-12-31031 December 2022 WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 2 of 7) ML23075A3482022-12-31031 December 2022 WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 3 of 7) ML23075A3492022-12-31031 December 2022 WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 4 of 7) ML23075A3502022-12-31031 December 2022 WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 5 of 7) ML23075A3512022-12-31031 December 2022 WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 6 of 7) L-PI-23-002, WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 7 of 7)2022-12-31031 December 2022 WCAP-18795-NP, Revision 0, Analysis of Capsule N from the Xcel Energy Prairie Island Unit 2 Reactor Vessel Radiation Surveillance Program, (Part 7 of 7) ML21285A2812021-10-12012 October 2021 Revised Pressure and Temperature Limits Report ML20272A2932020-09-28028 September 2020 (PINGP) Unit 1 and 2 Revised Pressure and Temperature Limits Report L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency ML17279A1242017-09-30030 September 2017 Enclosure 5 to L-PI-17-041, Westinghouse WCAP-17400-NP, Supplemental 1, Revision 2, Spent Fuel Pool Criticality Safety Analysis Supplemental Analysis Including the Storage of Ifba Bearing Fuel L-PI-16-054, Pressure and Temperature Limits Report, Revision 52016-06-22022 June 2016 Pressure and Temperature Limits Report, Revision 5 L-PI-15-034, Pressure and Temperature Limits Report (PTLR) Revision 42015-05-14014 May 2015 Pressure and Temperature Limits Report (PTLR) Revision 4 ML17297A3232014-11-14014 November 2014 Enclosure 2 (Redacted): Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic Updated Transmittal for Prairie Island Unit 1 ML16005A1102014-09-25025 September 2014 Redacted 2014 Decommissioning Cost Analysis for the Prairie Island Nuclear Generating Plant L-PI-14-045, Enclosure to L-PI-14-045, Transition Report, Revision 12014-04-30030 April 2014 Enclosure to L-PI-14-045, Transition Report, Revision 1 ML14030A5402014-02-27027 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14041A2042014-02-26026 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Prairie Island Nuclear Generating Plant, Units 1 and 2, TAC Nos.: MF0834 and MF0835 ML13133A0632012-06-27027 June 2012 H4, Rev. 27, Offsite Dose Calculation Manual (Odcm). L-PI-10-076, Calculation No. GEN-PI-083, Revision 1, Locked Rotor Accident (LRA) Analysis Using AST, Attachment 52010-07-23023 July 2010 Calculation No. GEN-PI-083, Revision 1, Locked Rotor Accident (LRA) Analysis Using AST, Attachment 5 ML1021002592010-06-30030 June 2010 Seismic Fragilities for Unit #1 and Unit #2 Turbine Building Piping and Equipment ML0832405452008-11-0606 November 2008 Final Report for the July 22, 2008, Radiological Emergency Preparedness (REP) Full Participation Plume Exposure Pathway Exercise L-PI-08-090, Stress Analysis Summary Report of Preemptive Structural Weld Overlay for the Unit 2 Pressurizer Surge Nozzle2008-10-16016 October 2008 Stress Analysis Summary Report of Preemptive Structural Weld Overlay for the Unit 2 Pressurizer Surge Nozzle ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 L-PI-05-054, Unit 2 Steam Generator Inspection Results - 15-Day Report2005-06-0808 June 2005 Unit 2 Steam Generator Inspection Results - 15-Day Report ML0435700172004-12-14014 December 2004 from NMC Re Technical Evaluation of Proposed Method of Class 3 Pipe Leak Operability Determinations ML0509802562004-10-28028 October 2004 PPE-04-868, High Burnup Lead Test Assembly (LTA) Inspection Report, October 2004 L-PI-04-065, FAI/01-86, Rev 1 Gap - User Documentation2004-04-0404 April 2004 FAI/01-86, Rev 1 Gap - User Documentation L-PI-03-020, License Amendment Request Dated March 25, 2003 Safety Analyses Transition, Tabs F - H2003-03-25025 March 2003 License Amendment Request Dated March 25, 2003 Safety Analyses Transition, Tabs F - H ML0309003422003-03-0606 March 2003 Request for Relief No.14 for Unit 1 3rd 10-Year Interval Inservice Inspection Program L-PI-03-031, Cycle 21 Steam Generator Tube Support Plate Voltage Based Repair Criteria 90-Day Report2003-03-0606 March 2003 Cycle 21 Steam Generator Tube Support Plate Voltage Based Repair Criteria 90-Day Report ML1008406422002-11-20020 November 2002 Feasibly Study for Conversion of Prairie Island to Natural Gas Fired Generation. Submitted with Comments on Draft Generic Environmental Impact Statement for Prairie Island Nuclear Generating Plant, Units 1 and 2, Supplement 39 to NUREG- 143 ML0232303542002-11-0707 November 2002 Pressure & Temperature Limits Report (PTLR) Revisions 2 & 3 ML0210704192002-04-15015 April 2002 Response to a Request for Additional Information Regarding Request for Relief No. 11 for the Unit 1 3rd 10-Year Interval Inservice Inspection Program NRC Generic Letter 1979-451979-09-25025 September 1979 NRC Generic Letter 1979-045: Transmittal of Reports Regarding Foreign Reactor Operation Experiences 2024-05-28 |