NRC FORM 658 U.S. NUCLEAR REGULATORY COMMISSION (9-1999)
TRANSMITTAL OF MEETING HANDOUT MATERIALS FOR IMMEDIATE PLACEMENT IN THE PUBLIC DOMAIN This form is to be filled out (typed or hand-printed) by the person who announced the meeting (i.e., the person who issued the meeting notice). The completed form, and the attached copy of meeting handout materials, will be sent to the Document Control Desk on the same day of the meeting; under no circumstances will this be done later than the working day after the meeting.
Do not include proprietary materials.
DATE OF MEETING The attached document(s), which was/were handed out in this meeting, is/are to be placed 04/11/2002 in the public domain as soon as possible. The minutes of the meeting will be issued in the near future. Following are administrative details regarding this meeting:
Docket Number(s) 50-286 Plant/Facility Name Indian Point 3 TAC Number(s) (if available)
Reference Meeting Notice 02-018 Purpose of Meeting (copy from meeting notice)
Conduct an annual assessment meeting to review Entergy's performance in operating the IP3 facility over the period April 1, 2001 to December 31, 2001.
NAME OF PERSON WHO ISSUED MEETING NOTICE TITLE Peter W. Eselgroth Branch Chief OFFICE Region I DIVISION Division of Reactor Projects BRANCH Projects Branch 2 Distribution of this form and attachments:
Docket File/Central File PUBLIC NRC FORM 658 (9-1999)
PRINTED ON RECYCLED PAPER This form was designed using InForms
Annual Assessment Meeting Reactor Oversight Program - Cycle 2 0
50 I
0
Nuclear Regulatory Commission -Region I King of Prussia, PA
Agenda
- Introduction m Review of Reactor Oversight Process m Discussion of Plant Performance Results m Licensee Response and Remarks m NRC Closing Remarks
- Meeting with the Licensee adjourned
- NRC available to address questions from the public NRC Response to 9/11 m Highest Level of Security Maintained
- Comprehensive Review of Security m Closely Coordinated Response With:
Our Licensees FBI Military, State, and Local Agencies Intelligence Communities
- Issued Security Advisories Increased Patrols Augmented Security Capabilities Added Barriers and Posts More Limited Access Enhanced Security Awareness
- Issued Order on Security
- NRC Monitoring Enhanced Security
NRC Representatives
"* Peter Eselgroth Chief, Reactor Projects Branch 2
- (610) 337-5234]
"* Pat Milano, Project Manager, NRR (301) 415-1457]
"* Peter Drysdale, Senior Resident Inspector (914) 739-8565]
NRC Activities
"* Ensure nuclear plants are designed, constructed, and operated safely
"* Issue licenses for the peaceful use of nuclear materials in the U.S.
"* Ensure licensees use nuclear materials and operate plants safely, and are prepared to respond to emergencies
NRC Performance Goals
"* Maintain safety and protect the environment
"* Enhance public confidence
"* Improve effectiveness, efficiency, and realism of processes and decision making
"* Reduce unnecessary regulatory burden NRC Reactor Oversight Activities
"* Provides assurance plants are operating safely and in accordance with the regulations
"* Risk informed process
"* Objective indicators of performance
"* Inspections focused on key safety areas
"* Defines expected NRC and licensee actions
Reactor Oversight Process IV Action Matrix R
Examples of Baseline Inspections
"* Equipment Alignment
"* Annual Fire Protection
"* Triennial Fire Protection
"* Operator Response
"* Plant security
"* Rad release controls
"* Worker radiation protection
"* Corrective action program
"* Corrective action program S70 hrs/yr S35 hrs/yr
-200 hrs every 3 yrs
- 125 hrs/yr
-40 hours/yr
-60 hrs/yr
-100 hrs every 2 years
-125 hrs/year 10% every inspection
-200 hr every 2 yrs
ý- A.,
I I I
Significance Threshold 23901 Green:
White:
Yellow:
Red:
Green:
White:
Yellow:
Red:
Performance Indicators Only baseline Inspection May increase NRC oversight Requires more NRC oversight Requires more NRC oversight Inspection Findings Very Low safety issue Low to moderate safety issue Substantial safety issue High safety issue Action Matrix Concept zmmzzz
Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions
National Summary of Plant Performance End of Calendar Year 2001 Licensee Response Regulatory Response Degraded Cornerstone Multiple/Repetitive Degraded Cornerstone Unacceptable Total Plants National Summary
- Performance Indicator Results 4th Qtr Calendar Yr 2001 Green
, White
' Yellow
- Red:
m Total Inspection Findings (April 2001 - December 2001)
Green
- White
- Yellow
- Red 74 24 4
1 0
103 1834 8
0 0
660 23 2
0
IP3 Inspection Activities (Jan 1 - Dec 31, 2001)
- 6094 hours0.0705 days <br />1.693 hours <br />0.0101 weeks <br />0.00232 months <br /> of inspection related activity
- Two resident inspectors
- 11 inspections by regional inspectors o Includes 2 team inspections
- Inspection Findings m 17 findings of very low safety significance 1P3 Performance Indicators 4Q/2001 WWW.NRC.GOV/NRR/OVERSIGHT/ASSESS/IP3/ip3_chart.html Performance Indicators
-F-
1P3 Inspection Finding Summary Reator
~adilation" Sfaac~
Safety Safety
[S
)nle~gOccupetions/
Pvbigc Mitigat,*
ng Sorrier e
ny
-l dI,
n I
dmo;,
I" E'ento sywae-i 1ntegrity PrepSredrioaSoet Most Significant Inspection Findings
-m m *zmm mm* mmz l i a 4Assessment Reports/Inspectio 4Q/2001 30/2001 2012001 10/2001 Cross Rference Of Ass-sama Addition.l Inspection & Asesennt Information n Plns:
-40 List of Inspection Reports
- 1 List ofAsestmtnt Lettets/Inspection Plans nt Reports 4-tAs~rr
- 1. Go2 Reference Sources
"* Reactor Oversight Process
- //w w w.nrc.gov/N R R /O V E R SIG H T /A S SE S S/index.htm l
"* Public Electronic Reading Room o http ://www.nrc.gov/reading-rm/adams.html
"* Public Document Room P 1-800-397-4209 (Toll Free)
" Region I Public Affairs Office SNeil Sheehan or Diane Screnci 1-800-432-1156 (Toll Free) 40/2001 3QJ2001 20J2001 I 0,2001 IIi
1P3 Annual Assessment (April 1 - Dec 31, 2001)
"* Operated safely
"* Fully met all cornerstone objectives
"* Licensee Response Band of Action Matrix All Inspection Findings of very low safety significance (Green)
SAll Performance Indicators requiring no additional NRC oversight (Green)
"* NRC Plans to conduct baseline inspections