ML021010592

From kanterella
Jump to navigation Jump to search

RAI, Re License Amendment Request TAC No. MB3042
ML021010592
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 04/12/2002
From: Miranda S
NRC/NRR/DLPM/LPD3
To: Forbes J
Nuclear Management Co
References
TAC MB3042
Download: ML021010592 (6)


Text

April 12, 2002 Mr. Jeffrey S. Forbes Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST (TAC NO. MB3042)

Dear Mr. Forbes:

By application dated September 27, 2001, the licensee (Nuclear Management Company) requested amendments to Facility Operating License No. DPR-22, Monticello Nuclear Generating Plant. The amendments proposed changes to the Technical Specifications (TS)

Sections 3.9.B.3/4.9.B.3, and an addition of a new section, TS 3.9.B.3.c, regarding emergency diesel generator fuel oil supply volume, starting air receivers and starting air compressors.

To complete its review of the proposed license changes, the staff requests licensees response to the enclosed questions. After discussing this request with Mr. D. Neve of your staff, a due date of May 17, 2002, has been set. If you need to revise the due date, please contact me at (301) 415-2303, at the earliest opportunity.

Sincerely,

/RA/

Samuel Miranda, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-263

Enclosure:

Request for Additional Information cc w/encl: See next page

April 12, 2002 Mr. Jeffrey S. Forbes Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST (TAC NO. MB3042)

Dear Mr. Forbes:

By application dated September 27, 2001, the licensee (Nuclear Management Company) requested amendments to Facility Operating License No. DPR-22, Monticello Nuclear Generating Plant. The amendments proposed changes to the Technical Specifications (TS)

Sections 3.9.B.3/4.9.B.3, and an addition of a new section, TS 3.9.B.3.c, regarding emergency diesel generator fuel oil supply volume, starting air receivers and starting air compressors.

To complete its review of the proposed license changes, the staff requests licensees response to the enclosed questions. After discussing this request with Mr. D. Neve of your staff, a due date of May 17, 2002, has been set. If you need to revise the due date, please contact me at (301) 415-2303, at the earliest opportunity.

Sincerely,

/RA/

Samuel Miranda, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-263

Enclosure:

Request for Additional Information cc w/encl: See next page DISTRIBUTION:

PUBLIC OGC PDIII-1 Reading ACRS BBurgess, RGN-III RBouling SMiranda ACCESSION NO.: ML021010592 OFFICE PDIII-1/PM PDIII-1/LA PDIII-1/SC NAME SMiranda THarris for LRaghavan RBouling DATE 04/12/02 04/12/02 04/12/02 OFFICIAL RECORD COPY

Monticello Nuclear Generating Plant cc:

J. E. Silberg, Esquire Commissioner Shaw, Pittman, Potts and Trowbridge Minnesota Department of Commerce 2300 N Street, N. W. 121 Seventh Place East Washington, DC 20037 Suite 200 St. Paul, MN 55101-2145 U.S. Nuclear Regulatory Commission Resident Inspectors Office Adonis A. Neblett 2807 W. County Road 75 Assistant Attorney General Monticello, MN 55362 Office of the Attorney General 445 Minnesota Street Site Licensing Manager Suite 900 Monticello Nuclear Generating Plant St. Paul, MN 55101-2127 Nuclear Management Company, LLC 2807 West County Road 75 Mr. Roy A. Anderson Monticello, MN 55362-9637 Executive Vice President and Chief Nuclear Officer Robert Nelson, President Nuclear Management Company, LLC Minnesota Environmental Control 700 First Street Citizens Association (MECCA) Hudson, WI 54016 1051 South McKnight Road St. Paul, MN 55119 Nuclear Asset Manager Xcel Energy, Inc.

Commissioner 414 Nicollet Mall Minnesota Pollution Control Agency Minneapolis, MN 55401 520 Lafayette Road St. Paul, MN 55155-4194 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Commissioner Minnesota Department of Health 717 Delaware Street, S. E.

Minneapolis, MN 55440 Douglas M. Gruber, Auditor/Treasurer Wright County Government Center 10 NW Second Street Buffalo, MN 55313 March 2002

REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST DATED SEPTEMBER 27, 2001 NUCLEAR MANAGEMENT COMPANY, LLC MONTICELLO NUCLEAR GENERATING PLANT DOCKET NO. 50-263

1. The proposed new technical specification (TS) 3.9.B.3.c Limiting Condition for Operation (LCO) for standby diesel generators states:
c. When a diesel generator is required to be operable, maintain air pressure for both associated air starting receivers > 165 psig.
1) When a diesel generator starting air receiver pressure < 165 psig, restore starting air receiver pressure to > 165 psig within 7 days, or declare the associated diesel generator inoperable.
2) With both diesel generator starting air receivers pressure < 165 psig, immediately declare the associated diesel generator inoperable.

Standard technical specification (STS)1 Section LCO 3.8.3.E requires that when one or more diesel generators with starting air receiver pressure <225 psig and > 125 psig, restore (with completion time of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />) the starting air receiver pressure to >225 psig.

STS LCO in Section B 3.8.3 states: The starting air system is required to have a minimum capacity for five successive diesel generator start attempts without recharging the air start receivers.

The technical rationale for the additional requirement is that the change is consistent with NUREG-1433, General Electric Plants, BWR/4, STS. The LCO completion time of 7 days for the proposed TS versus the completion time of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> as specified in the STS is based upon the more robust design (i.e., two redundant air starting systems versus the single air starting system assumed in the applicable STS LCO). However, the proposed TS specifies the minimum air starting pressure rather than the nominal air starting pressure cited in the bases of the STS. Similarly, the associated STS Surveillance Requirement (SR) criteria is based on the nominal air pressure parameter necessary for the minimum number of engine start cycles without recharging the air receiver. Please provide a technical justification for using an off-normal or marginal parameter setting for the proposed LCO and SR instead of the nominal air starting pressure value (i.e., 200 psig).

1 NUREG-1433, Standard Technical Specifications (STS) for General Electric Plants, BWR/4" Revision 2.

2. Please address the potential common-cause failure modes which may be possible given that one diesel generator starting air receiver pressure is less than the minimum pressure requirement (i.e., 165 psig) under the proposed LCO TS 3.9.B.3.c and identify any independent means which will verify that the remaining air receiver has sufficient capacity to provide enough air pressure for a minimum of two emergency diesel generator (EDG) starts.
3. Provide detailed calculations to demonstrate that the fuel oil stored in the underground fuel oil storage tank will be sufficient to support the operation of one EDG for 7 days following a loss-of-coolant accident (LOCA). Information should include:
a. The methodology2 and assumptions used to calculate the fuel oil consumption rates.
b. The minimum usable volume of the underground fuel oil storage tank, information should include the assumptions (e.g. instrumentation errors, vortex formation, etc.)

used in the calculations and the tank design in detail (including drawings).

4. If the calculations for the EDG fuel oil consumption rates and inventory required are based on the time-dependent loads, the following information should be provided:
a. Tables or curves to show the EDG loadings and their corresponding fuel oil consumption rates and inventories as a function of time following the design bases accident.
b. Discussion of the provision established in plant procedures for shedding3 the loads following a LOCA, and
c. State whether the proposed minimum EDG fuel oil required to be stored in the underground storage tank includes a 10 percent margin as recommended in American National Standards Institute N195-1076.
5. With regard to the licensees application requests for removing/relocating existing plant TS sections and SR sections, the staffs position is that existing TS sections and SR sections that fall within or satisfy any of the four criteria described in 10 CFR 50.36(c)(2)(ii) must be retained in the TS, while those TS sections and SR sections that do not fall within or satisfy these criteria may be relocated to other licensees administratively controlled documents, such as plant Technical Requirements Manuals.

Please indicate the administratively controlled documents to which the current TS 4.9.B.3.b will be relocated and discuss how the air compressors will be maintained for readiness.

2 Calculations based on the assumption that the diesel generator operates continuously for 7 days at its rated capacity or calculations based on the time-dependent loads of the diesel generator.

3 Information provided should clearly indicate which loads will be shed, following a LOCA, and at what times they will be shed.