March 2002 Monthly Operating Report for Calvert Cliffs, Units 1 & 2
ML021010060
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 04/05/2002
From: Katz P
Constellation Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML021010060 (7)


Text

Peter E. Katz Plant General Manager 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4101 Constellation Nuclear Calvert Cliffs Nuclear Power Plant A Member of the Constellation Energy Group April 5, 2002 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

SUBJECT:

Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 March 2002 Operating Data Reports The subject reports are being sent to you as required by Technical Specification 5.6.4.

Should you have questions, please contact Mr. Bruce B. Mrowca at (410) 495-3989.

Very truly ours, PEK/TWG/bjd Attachments cc:

R. S. Fleishman, Esquire J. E. Silberg, Esquire Director, Project Directorate I-1, NRC D. M. Skay, NRC H. J. Miller, NRC Resident Inspector, NRC R. I. McLean, DNR J. Wright, INPO K. N. Larson, ANI

OPERATING DATA REPORT

          • WW**W***
      • W**********

Docket No.

50-317 Calvert Cliffs Unit 1 April 3, 2002 Prepared by Herman 0. Olsen Telephone: (410)495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)

MAXIMUM DEPENDABLE CAP'Y (NET MWe)

MARCH 2002 845 825 This month NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED(MWH) 0.0 0.0 0.0 0

Year to-Date 1,104.0 1,102.7 0.0 921,814 Cumulative to Date 178,836.1 175,718.4 0.0 143,443,897

1.
2.
3.

4.

UNIT SHUTDOWNS DOCKET NO.

UNITNAME DATE COMPLETED BY TELEPHONE 50-317 Calvert Cliffs - U1 April 3, 2002 Herman 0. Olsen (410) 495-6734 REPORTING MONTH March 2002

' Reason:

A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2

Method:

1 - Manual 2 - Manual Scram.

3 - Automatic Scram.

4 - Continued 5 - Other NO.

DATE TYPE DURATION REASON' METHOD OF CAUSE/CORRECTIVE ACTIONS F:

FORCED (HOURS)

SHUTTING S:

SCHEDULED DOWN 2 COMMENTS02-001 02/02/15 5

744.0 C

I The unit remained shutdown in a planned refueling outage for the entire month.

DOCKET NO. 50-317 CALVERT CLIFFS - UNIT 1 April 3, 2002

SUMMARY

OF OPERATING EXPERIENCE March 2002 The unit began the month in Mode 6 (refueling).

On 03/05/02 at 0920 the reactor was defueled.

The following significant work was completed or in progress during the month:

Reactor vessel head was inspected.

Steam Generator replacement preparations.

Main Generator rewind in progress.

The unit remained defueled for the remainder of the month.

OPERATING DATA REPORT Docket No.

50-318 Calvert Cliffs Unit 2 April 3, 2002 Prepared by Herman 0. Olsen Telephone: (410)495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)

MAXIMUM DEPENDABLE CAP'Y (NET MWe)

MARCH 2002 845 835 This month Year-Cumulative to-Date to Date

1. NUMBER OF HOURS REACTOR WAS CRITICAL
2.

HOURS GENERATOR ON LINE

3.

UNIT RESERVE SHUTDOWN HOURS

4. NET ELECTRICAL ENERGY GENERATED(MWH) 744.0 2,160.0 744.0 2,160.0 0.0 0.0 645,092 1,873,041 170,959.8 169,104.7 0.0 138,978,919

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-318 Calvert Cliffs-U2 April 3, 2002 Herman 0. Olsen (410) 495-6734 REPORT MONTH March 2002

' Reason:

A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2

Method:

1 - Manual 2 - Manual Scram.

3 - Automatic Scram.

4 - Continued 5 - Other UNIT SHUTDOWNS NO.

DATE TYPE DURATION REASON' METHOD OF CAUSE/CORRECTIVE ACTIONS F:

FORCED (HOURS)

SHUTTING S:

SCHEDULED DOWN 2 COMMENTS There were no shutdowns this month.

DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 April 3, 2002

SUMMARY

OF OPERATING EXPERIENCE March 2002 The unit operated at 100% reactor power for the entire month.