Dave Morey Vice President Farley Project April 8, 2002 Docket Nos.:
50-348 50-364 SOUTHERN COMPANY Energy to Serve Your World..
NEL-02-0082 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:
Enclosed are the March 2002 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 5.6.4 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted, Dave Morey RWC:mor
Enclosures:
- 1. March Monthly Operating Report for Plant Farley Unit 1
- 2. March Monthly Operating Report for Plant Farley Unit 2 N
Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131
Page 2 U. S. Nuclear Regulatory Commission cc:
Southern Nuclear Operating Company Mr. D. E. Grissette, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.
Mr. F. Rinaldi, Licensing Project Manager - Farley U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley
OPERATING DATA REPORT DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley - Unit 1 DATE:
April 4, 2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 OPERATING STATUS
- 1. Reporting Period:
MARCH 2002
- 2.
Design Electrical Rating (Net MWe):
854
- 3. Maximum Dependable Capacity (Net MWe):
833 Year to Date Cumulative Number Of Hours Reactor Was Critical:
Hours Generator On-line:
Unit Reserve Shutdown Hours:
Net Electrical Energy Generated (MWH):
744.0 744.0 0.0 628,640.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date Tag No.
Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
El-1
- 4.
- 5.
- 6.
7.
This Month 2,160.0 174,405.9 2,160.0 172,128.2 0.0 0.0 1,833,114.0 136,186,060.0
UNIT SHUTDOWNS REPORTING PERIOD:
MARCH 2002 DOCKET NO.:
50-348 UNIT NAME: J. M. Farley - Unit 1 DATE:
April 4, 2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/Corrective Actions No.
Date S: Scheduled (Hours)
(1)
(2)
Comments There were no unit shutdowns during the month.
(1) REASON:
(2) METHOD:
A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT El-2 At 0000 on 020302 a ramp down to approximately 92% power was commenced to perform governor valve testing. The testing was completed and the unit was returned to 100% power at 0540 on 020302.
OPERATING DATA REPORT DOCKET NO.:
50-364 UNIT NAME:
J. M. Farley - Unit 2 DATE:
April 4, 2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 OPERATING STATUS
- 1. Reporting Period:
- 2.
Design Electrical Rating (Net MWe):
- 3.
Maximum Dependable Capacity (Net MWe):
MARCH 2002 855 842 This Month Number Of Hours Reactor Was Critical:
Hours Generator On-line:
Unit Reserve Shutdown Hours:
Net Electrical Energy Generated (MWH):
744.0 744.0 0.0 637,385.0 Year to Date Cumulative 2,160.0 157,645.6 2,160.0 155,705.8 0.0 0.0 1,849,408.0 124,431,487.0 CHALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES E2-1
- 4.
- 5.
- 6.
7.
Date I Tag No.
[ Event Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
.1.
UNIT SHUTDOWNS REPORTING PERIOD:
MARCH 2002 DOCKET NO.:
50-364 UNIT NAME: J. M. Farley - Unit 2 DATE:
April 4, 2002 COMPLETED BY:
W. L. Marlar TELEPHONE:
(334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/Corrective Actions No.
Date S: Scheduled (Hours)
(1)
(2)
Comments There were no unit shutdowns during the month.
(1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
CAUSE/CORRECTIVE ACTION/COMMENTS NARRATIVE REPORT E2-2 There were no significant power reductions this period.